Cable Jointing Work <br>

Workplace, Tools & Equipment

  • Is the joint hole the correct size and safe to work in?

  • Are all excavations correctly shuttered or battered where required?

  • Are the correct tools available I.e. insulated tools, plastic hack knife, heatshrink blowlamp etc?

  • Is all relevant test equipment available and tested, I.e. Test lamp, tester-scope, phase rotation meter, Insulation resistance tester, multimeter/voltmeter, earth loop impedance tester.

  • Are the correct materials available, in good condition and align to Adopting Utility Requirements?

  • Is Spiking Gun in good condition and in date re service schedule?

Work Practices

  • Is the jointing work carried out to Adopting Utility instructions - ?

  • Is PPE sufficient for Work?

  • Are the correct 'Live Working' procedures being used? (RA includes Sanction for Live Working)

  • Is the earth maintained and shrouding used on exposed live conductors?

  • Is the cable stripped and prepared correctly? (Cleaned using correct solvent/wipes)

  • Have the cable cores been insulated correctly? (shrouded for work on 1 ph at a time?)

  • Are the correct cable connectors used?

  • Is the 'Cold Pour' jointing resin mixed correctly?

  • Is the joint shell/box sealed correctly?

  • Have polarity/rotation checks been completed and recorded?

  • Has a Safety Document been issued correctly and Accepted by Recipient?

Equipment Positioning

  • Are the service cables installed correctly?

  • Is the cut-out installed correctly, secure and waterproof?

  • Is the meter position correct, secure and waterproof?

  • If required, have the PME earth rods been installed correctly?

  • Are Cable bending Radii acceptable for types?

  • Are Earthed apparatus shrouded or bonded sufficiently?

Craftsman Understanding

  • Joint Instruction & Working Practices

  • Authorisation & Competencies align to Work and Others in Assistance

  • Polarity & phase rotation

  • Points of isolation

  • Supply point

  • Phasing out - links box, pillar etc.

  • Discrimination

  • PME

  • LV Diagram

  • Earth Loop Impedance

  • Network Network diagrams

  • All Isolation and Earthing Points Specified on Safety Document?

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.