Inspection Details
-
ES Auditor:
-
Conducted on
-
Location
-
Team Leader:
-
Team Member:
-
Reported to Site Office:
-
Activity:
-
Adopting Utility
Cable Jointing Work <br>
Workplace, Tools & Equipment
-
Is the joint hole the correct size and safe to work in?
-
Are all excavations correctly shuttered or battered where required?
-
Are the correct tools available I.e. insulated tools, plastic hack knife, heatshrink blowlamp etc?
-
Is all relevant test equipment available and tested, I.e. Test lamp, tester-scope, phase rotation meter, Insulation resistance tester, multimeter/voltmeter, earth loop impedance tester.
-
Are the correct materials available, in good condition and align to Adopting Utility Requirements?
-
Is Spiking Gun in good condition and in date re service schedule?
Work Practices
-
Is the jointing work carried out to Adopting Utility instructions - ?
-
Is PPE sufficient for Work?
-
Are the correct 'Live Working' procedures being used? (RA includes Sanction for Live Working)
-
Is the earth maintained and shrouding used on exposed live conductors?
-
Is the cable stripped and prepared correctly? (Cleaned using correct solvent/wipes)
-
Have the cable cores been insulated correctly? (shrouded for work on 1 ph at a time?)
-
Are the correct cable connectors used?
-
Is the 'Cold Pour' jointing resin mixed correctly?
-
Is the joint shell/box sealed correctly?
-
Have polarity/rotation checks been completed and recorded?
-
Has a Safety Document been issued correctly and Accepted by Recipient?
Equipment Positioning
-
Are the service cables installed correctly?
-
Is the cut-out installed correctly, secure and waterproof?
-
Is the meter position correct, secure and waterproof?
-
If required, have the PME earth rods been installed correctly?
-
Are Cable bending Radii acceptable for types?
-
Are Earthed apparatus shrouded or bonded sufficiently?
Craftsman Understanding
-
Joint Instruction & Working Practices
-
Authorisation & Competencies align to Work and Others in Assistance
-
Polarity & phase rotation
-
Points of isolation
-
Supply point
-
Phasing out - links box, pillar etc.
-
Discrimination
-
PME
-
LV Diagram
-
Earth Loop Impedance
-
Network Network diagrams
-
All Isolation and Earthing Points Specified on Safety Document?