Title Page
Site Overview
-
Todays date
-
Project Name
-
Project Ref no (E.G 5007)
-
Client name
-
Project Manager (PM at GEW2)
-
Is this a CDM 2015 notifiable site?
-
Is there a F10 form displayed on site (Red and white document with HSE on it)
-
Site Address/Location
Section 1: Scope of works (tick all that apply)
-
Testing/Sampling/Calibration Activities
-
Excavations
-
Soil Strip
-
Cable Laying
-
Jointing Operations
-
Concrete Pouring & Works
-
Fitting
-
RC Works & Form Works
-
Steel Fixing/Steel works
-
Timber Shuttering/Timber works
-
Site deliveries/Third Party Interface
-
Other (Please specify)
Section 2: Method Statement
-
Applicable Method Statement ref:
-
Does this work instruction form part of a sequence of work involving other parties
-
(If Yes) Please provide detail
-
undefined
Section 3: General Health and Safety Questions
-
Certificate of Competencies for all staff on site
-
Is there a Site-Specific Risk Assessment completed for today’s task?
-
Does it identify all the Hazards on site?
-
Is there sufficient Control measures in place to reduce the risk?
-
Site Safety notice board in place? With key site info?
-
COSHH & MSDS Sheets
-
Construction Program (Construction Phase Plan)
-
Works involving Permits occurring on site? (Digging/Hot works/WAH)
-
Is there a permit in date for the work?
-
Prepared by
Section 4: PPE
-
Boots with steel toe cap protection
-
Helmets worn
-
Hi-vis with reflective strip
-
Gloves
-
Safety Glasses (if required)
-
Other Specify
Section 5: Observations and non-conformances
-
Is there any non-conformances or observations of note today?
-
Please specify:
-
Have you submitted a close call to GEW2 for this?
-
-
General comments and notes
Section 6: Sign off
-
Name
-
Signed
-
Position