Title Page
-
Document No.
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Site setup checklist (check all that apply)
-
PPE
-
Signs/cones placed
-
Wheels chocked
-
Customer contacted
-
Stretch/warm up
-
Property damage noted
Recognized hazards (check all that apply)
-
Pedestrian/vehicle traffic
-
Co vehicle placement
-
Job access
-
Energized electric
-
Fire explosion
-
Struck by's
-
Slip/trip/fall hazard
-
Pinch point/caught betweens
-
Excessive noise
-
Eye injury
Hazard protection (check all that apply)
-
Hearing protection
-
High volt elec. protection
-
Barrier protection erected
-
Propane/gas tanks isolated
-
Material safety data sheet
-
Equipment inspection
-
Tool inspection
-
Flagger/traffic control
Pre task review (check all that apply)
-
Discuss yesterday's incidents
-
Site safety orientation complete ?
-
Job scope understood ?
-
Good catch documented ?
-
Site safety assessment completed ?
-
Other comments
Post-task checklist (check all that apply)
-
All excavations secured
-
Customer equipment secured
-
Signs/cones removed
-
Truck/trailer/equipment secured
-
On-site equipment secured
-
Add signature