Information
-
Project Name
-
PADEP Permit Number (similar to E0829-048)
-
ORM Number (use the Corps Permit # similar to NAB-2012-00368-P24)
-
Company Name
-
Year of Construction
-
County
-
Conducted on
-
Location
-
Prepared by
-
This inspection report should only contain monitoring documentation for 1 permitted project. This project may have several resources that require documentation. Document all resource crossings individually within this report.
-
Number of Resources Included in This Inspection
-
1st Resource ID
-
Latitude/Longitude (EX: N15.38749/W075.54887)
-
Resource Type Pre-Construction
- PEM
- PSS
- PFO
- Stream - EPH
- Stream - INT
- Stream - PER
- Upland
-
Resource Type Post-Construction
- PEM
- PSS
- PFO
- Stream - EPH
- Stream - INT
- Stream - PER
- Upland
-
Have pre-construction contours been re-established?
-
Are there additional resources impacted at this site that were not identified in the application/permit?
-
Have all E&S Controls been removed from the aquatic resource area?
-
Is the site vegetated or otherwise permanently stable?
-
Has the Hydrology been restored to pre-construction conditions?<br>(Does the stream or wetland flow as it did before construction?)
-
Do the features within the LOD match the upstream and downstream features in the undisturbed portion of the stream/wetland?
-
Does Excess Fill Remain?
-
Is this site progressing toward returning to a wetland/stable stream channel?
-
Is the resource's banks and channel as stable as it is upstream and downstream?
-
Will this site recover and eventually return to a wetland/stable stream channel?
-
Include at least 3 photographs of the resource (Banks/Channel, Upstream, Downstream). Additionally, be sure to photograph any area needing repair.
-
If repairs are needed, indicate the area needing repair by sketch.
-
Comments or Notes regarding repairs that may be needed at this resource.
-
Document Another Resource?
-
2nd Resource ID
-
Latitude/Longitude (EX: N15.38749/W075.54887)
-
Resource Type Pre-Construction
- PEM
- PSS
- PFO
- Stream - EPH
- Stream - INT
- Stream - PER
- Upland
-
Resource Type Post-Construction
- PEM
- PSS
- PFO
- Stream - EPH
- Stream - INT
- Stream - PER
- Upland
-
Have pre-construction contours been re-established?
-
Are there additional resources impacted at this site that were not identified in the application/permit?
-
Have all E&S Controls been removed from the aquatic resource area?
-
Is the site vegetated or otherwise permanently stable?
-
Has the Hydrology been restored to pre-construction conditions?<br>(Does the stream or wetland flow as it did before construction?)
-
Do the features within the LOD match the upstream and downstream features in the undisturbed portion of the stream/wetland?
-
Does Excess Fill Remain?
-
Is this site progressing toward returning to a wetland/stable stream channel?
-
Is the resource's banks and channel as stable as it is upstream and downstream?
-
Will this site recover and eventually return to a wetland/stable stream channel?
-
Include at least 3 photographs of the resource (Banks/Channel, Upstream, Downstream). Additionally, be sure to photograph any area needing repair.
-
If repairs are needed, indicate the area needing repair by sketch.
-
Comments or Notes regarding repairs that may be needed at this resource.
-
Document Another Resource?
-
3rd Resource ID
-
Latitude/Longitude (EX: N15.38749/W075.54887)
-
Resource Type Pre-Construction
- PEM
- PSS
- PFO
- Stream - EPH
- Stream - INT
- Stream - PER
- Upland
-
Resource Type Post-Construction
- PEM
- PSS
- PFO
- Stream - EPH
- Stream - INT
- Stream - PER
- Upland
-
Have pre-construction contours been re-established?
-
Are there additional resources impacted at this site that were not identified in the application/permit?
-
Have all E&S Controls been removed from the aquatic resource area?
-
Is the site vegetated or otherwise permanently stable?
-
Has the Hydrology been restored to pre-construction conditions?<br>(Does the stream or wetland flow as it did before construction?)
-
Do the features within the LOD match the upstream and downstream features in the undisturbed portion of the stream/wetland?
-
Does Excess Fill Remain?
-
Is this site progressing toward returning to a wetland/stable stream channel?
-
Is the resource's banks and channel as stable as it is upstream and downstream?
-
Will this site recover and eventually return to a wetland/stable stream channel?
-
Include at least 3 photographs of the resource (Banks/Channel, Upstream, Downstream). Additionally, be sure to photograph any area needing repair.
-
If repairs are needed, indicate the area needing repair by sketch.
-
Comments or Notes regarding repairs that may be needed at this resource.
-
Document Another Resource?
-
4th Resource ID
-
Latitude/Longitude (EX: N15.38749/W075.54887)
-
Resource Type Pre-Construction
- PEM
- PSS
- PFO
- Stream - EPH
- Stream - INT
- Stream - PER
- Upland
-
Resource Type Post-Construction
- PEM
- PSS
- PFO
- Stream - EPH
- Stream - INT
- Stream - PER
- Upland
-
Have pre-construction contours been re-established?
-
Are there additional resources impacted at this site that were not identified in the application/permit?
-
Have all E&S Controls been removed from the aquatic resource area?
-
Is the site vegetated or otherwise permanently stable?
-
Has the Hydrology been restored to pre-construction conditions?<br>(Does the stream or wetland flow as it did before construction?)
-
Do the features within the LOD match the upstream and downstream features in the undisturbed portion of the stream/wetland?
-
Does Excess Fill Remain?
-
Is this site progressing toward returning to a wetland/stable stream channel?
-
Is the resource's banks and channel as stable as it is upstream and downstream?
-
Will this site recover and eventually return to a wetland/stable stream channel?
-
Include at least 3 photographs of the resource (Banks/Channel, Upstream, Downstream). Additionally, be sure to photograph any area needing repair.
-
If repairs are needed, indicate the area needing repair by sketch.
-
Comments or Notes regarding repairs that may be needed at this resource.
-
Document Another Resource?
-
5th Resource ID
-
Latitude/Longitude (EX: N15.38749/W075.54887)
-
Resource Type Pre-Construction
- PEM
- PSS
- PFO
- Stream - EPH
- Stream - INT
- Stream - PER
- Upland
-
Resource Type Post-Construction
- PEM
- PSS
- PFO
- Stream - EPH
- Stream - INT
- Stream - PER
- Upland
-
Have pre-construction contours been re-established?
-
Are there additional resources impacted at this site that were not identified in the application/permit?
-
Have all E&S Controls been removed from the aquatic resource area?
-
Is the site vegetated or otherwise permanently stable?
-
Has the Hydrology been restored to pre-construction conditions?<br>(Does the stream or wetland flow as it did before construction?)
-
Do the features within the LOD match the upstream and downstream features in the undisturbed portion of the stream/wetland?
-
Does Excess Fill Remain?
-
Is this site progressing toward returning to a wetland/stable stream channel?
-
Is the resource's banks and channel as stable as it is upstream and downstream?
-
Will this site recover and eventually return to a wetland/stable stream channel?
-
Include at least 3 photographs of the resource (Banks/Channel, Upstream, Downstream). Additionally, be sure to photograph any area needing repair.
-
If repairs are needed, indicate the area needing repair by sketch.
-
Comments or Notes regarding repairs that may be needed at this resource.
-
Document Another Resource?
-
6th Resource ID
-
Latitude/Longitude (EX: N15.38749/W075.54887)
-
Resource Type Pre-Construction
- PEM
- PSS
- PFO
- Stream - EPH
- Stream - INT
- Stream - PER
- Upland
-
Resource Type Post-Construction
- PEM
- PSS
- PFO
- Stream - EPH
- Stream - INT
- Stream - PER
- Upland
-
Have pre-construction contours been re-established?
-
Are there additional resources impacted at this site that were not identified in the application/permit?
-
Have all E&S Controls been removed from the aquatic resource area?
-
Is the site vegetated or otherwise permanently stable?
-
Has the Hydrology been restored to pre-construction conditions?<br>(Does the stream or wetland flow as it did before construction?)
-
Do the features within the LOD match the upstream and downstream features in the undisturbed portion of the stream/wetland?
-
Does Excess Fill Remain?
-
Is this site progressing toward returning to a wetland/stable stream channel?
-
Is the resource's banks and channel as stable as it is upstream and downstream?
-
Will this site recover and eventually return to a wetland/stable stream channel?
-
Include at least 3 photographs of the resource (Banks/Channel, Upstream, Downstream). Additionally, be sure to photograph any area needing repair.
-
If repairs are needed, indicate the area needing repair by sketch.
-
Comments or Notes regarding repairs that may be needed at this resource.
-
Document Another Resource?
-
7th Resource ID
-
Latitude/Longitude (EX: N15.38749/W075.54887)
-
Resource Type Pre-Construction
- PEM
- PSS
- PFO
- Stream - EPH
- Stream - INT
- Stream - PER
- Upland
-
Resource Type Post-Construction
- PEM
- PSS
- PFO
- Stream - EPH
- Stream - INT
- Stream - PER
- Upland
-
Have pre-construction contours been re-established?
-
Are there additional resources impacted at this site that were not identified in the application/permit?
-
Have all E&S Controls been removed from the aquatic resource area?
-
Is the site vegetated or otherwise permanently stable?
-
Has the Hydrology been restored to pre-construction conditions?<br>(Does the stream or wetland flow as it did before construction?)
-
Do the features within the LOD match the upstream and downstream features in the undisturbed portion of the stream/wetland?
-
Does Excess Fill Remain?
-
Is this site progressing toward returning to a wetland/stable stream channel?
-
Is the resource's banks and channel as stable as it is upstream and downstream?
-
Will this site recover and eventually return to a wetland/stable stream channel?
-
Include at least 3 photographs of the resource (Banks/Channel, Upstream, Downstream). Additionally, be sure to photograph any area needing repair.
-
If repairs are needed, indicate the area needing repair by sketch.
-
Comments or Notes regarding repairs that may be needed at this resource.
-
Document Another Resource?
-
8th Resource ID
-
Latitude/Longitude (EX: N15.38749/W075.54887)
-
Resource Type Pre-Construction
- PEM
- PSS
- PFO
- Stream - EPH
- Stream - INT
- Stream - PER
- Upland
-
Resource Type Post-Construction
- PEM
- PSS
- PFO
- Stream - EPH
- Stream - INT
- Stream - PER
- Upland
-
Have pre-construction contours been re-established?
-
Are there additional resources impacted at this site that were not identified in the application/permit?
-
Have all E&S Controls been removed from the aquatic resource area?
-
Is the site vegetated or otherwise permanently stable?
-
Has the Hydrology been restored to pre-construction conditions?<br>(Does the stream or wetland flow as it did before construction?)
-
Do the features within the LOD match the upstream and downstream features in the undisturbed portion of the stream/wetland?
-
Does Excess Fill Remain?
-
Is this site progressing toward returning to a wetland/stable stream channel?
-
Is the resource's banks and channel as stable as it is upstream and downstream?
-
Will this site recover and eventually return to a wetland/stable stream channel?
-
Include at least 3 photographs of the resource (Banks/Channel, Upstream, Downstream). Additionally, be sure to photograph any area needing repair.
-
If repairs are needed, indicate the area needing repair by sketch.
-
Comments or Notes regarding repairs that may be needed at this resource.
-
Document Another Resource?
-
9th Resource ID
-
Latitude/Longitude (EX: N15.38749/W075.54887)
-
Resource Type Pre-Construction
- PEM
- PSS
- PFO
- Stream - EPH
- Stream - INT
- Stream - PER
- Upland
-
Resource Type Post-Construction
- PEM
- PSS
- PFO
- Stream - EPH
- Stream - INT
- Stream - PER
- Upland
-
Have pre-construction contours been re-established?
-
Are there additional resources impacted at this site that were not identified in the application/permit?
-
Have all E&S Controls been removed from the aquatic resource area?
-
Is the site vegetated or otherwise permanently stable?
-
Has the Hydrology been restored to pre-construction conditions?<br>(Does the stream or wetland flow as it did before construction?)
-
Do the features within the LOD match the upstream and downstream features in the undisturbed portion of the stream/wetland?
-
Does Excess Fill Remain?
-
Is the resource's banks and channel as stable as it is upstream and downstream?
-
Will this site recover and eventually return to a wetland/stable stream channel?
-
Is this site progressing toward returning to a wetland/stable stream channel?
-
Include at least 3 photographs of the resource (Banks/Channel, Upstream, Downstream). Additionally, be sure to photograph any area needing repair.
-
If repairs are needed, indicate the area needing repair by sketch.
-
Comments or Notes regarding repairs that may be needed at this resource.
-
Document Another Resource?
-
10th Resource ID
-
Latitude/Longitude (EX: N15.38749/W075.54887)
-
Resource Type Pre-Construction
- PEM
- PSS
- PFO
- Stream - EPH
- Stream - INT
- Stream - PER
- Upland
-
Resource Type Post-Construction
- PEM
- PSS
- PFO
- Stream - EPH
- Stream - INT
- Stream - PER
- Upland
-
Have pre-construction contours been re-established?
-
Are there additional resources impacted at this site that were not identified in the application/permit?
-
Have all E&S Controls been removed from the aquatic resource area?
-
Is the site vegetated or otherwise permanently stable?
-
Has the Hydrology been restored to pre-construction conditions?<br>(Does the stream or wetland flow as it did before construction?)
-
Do the features within the LOD match the upstream and downstream features in the undisturbed portion of the stream/wetland?
-
Does Excess Fill Remain?
-
Is this site progressing toward returning to a wetland/stable stream channel?
-
Is the resource's banks and channel as stable as it is upstream and downstream?
-
Will this site recover and eventually return to a wetland/stable stream channel?
-
Include at least 3 photographs of the resource (Banks/Channel, Upstream, Downstream). Additionally, be sure to photograph any area needing repair.
-
If repairs are needed, indicate the area needing repair by sketch.
-
Comments or Notes regarding repairs that may be needed at this resource.
-
Inspector Name & Signature