Information

  • Project Name

  • PADEP Permit Number (similar to E0829-048)

  • ORM Number (use the Corps Permit # similar to NAB-2012-00368-P24)

  • Company Name

  • Year of Construction

  • County

  • Conducted on

  • Location
  • Prepared by

  • This inspection report should only contain monitoring documentation for 1 permitted project. This project may have several resources that require documentation. Document all resource crossings individually within this report.

  • Number of Resources Included in This Inspection

  • 1st Resource ID

  • Latitude/Longitude (EX: N15.38749/W075.54887)

  • Resource Type Pre-Construction

  • Resource Type Post-Construction

  • Have pre-construction contours been re-established?

  • Are there additional resources impacted at this site that were not identified in the application/permit?

  • Have all E&S Controls been removed from the aquatic resource area?

  • Is the site vegetated or otherwise permanently stable?

  • Has the Hydrology been restored to pre-construction conditions?<br>(Does the stream or wetland flow as it did before construction?)

  • Do the features within the LOD match the upstream and downstream features in the undisturbed portion of the stream/wetland?

  • Does Excess Fill Remain?

  • Is this site progressing toward returning to a wetland/stable stream channel?

  • Is the resource's banks and channel as stable as it is upstream and downstream?

  • Will this site recover and eventually return to a wetland/stable stream channel?

  • Include at least 3 photographs of the resource (Banks/Channel, Upstream, Downstream). Additionally, be sure to photograph any area needing repair.

  • If repairs are needed, indicate the area needing repair by sketch.

  • Comments or Notes regarding repairs that may be needed at this resource.

  • Document Another Resource?

  • 2nd Resource ID

  • Latitude/Longitude (EX: N15.38749/W075.54887)

  • Resource Type Pre-Construction

  • Resource Type Post-Construction

  • Have pre-construction contours been re-established?

  • Are there additional resources impacted at this site that were not identified in the application/permit?

  • Have all E&S Controls been removed from the aquatic resource area?

  • Is the site vegetated or otherwise permanently stable?

  • Has the Hydrology been restored to pre-construction conditions?<br>(Does the stream or wetland flow as it did before construction?)

  • Do the features within the LOD match the upstream and downstream features in the undisturbed portion of the stream/wetland?

  • Does Excess Fill Remain?

  • Is this site progressing toward returning to a wetland/stable stream channel?

  • Is the resource's banks and channel as stable as it is upstream and downstream?

  • Will this site recover and eventually return to a wetland/stable stream channel?

  • Include at least 3 photographs of the resource (Banks/Channel, Upstream, Downstream). Additionally, be sure to photograph any area needing repair.

  • If repairs are needed, indicate the area needing repair by sketch.

  • Comments or Notes regarding repairs that may be needed at this resource.

  • Document Another Resource?

  • 3rd Resource ID

  • Latitude/Longitude (EX: N15.38749/W075.54887)

  • Resource Type Pre-Construction

  • Resource Type Post-Construction

  • Have pre-construction contours been re-established?

  • Are there additional resources impacted at this site that were not identified in the application/permit?

  • Have all E&S Controls been removed from the aquatic resource area?

  • Is the site vegetated or otherwise permanently stable?

  • Has the Hydrology been restored to pre-construction conditions?<br>(Does the stream or wetland flow as it did before construction?)

  • Do the features within the LOD match the upstream and downstream features in the undisturbed portion of the stream/wetland?

  • Does Excess Fill Remain?

  • Is this site progressing toward returning to a wetland/stable stream channel?

  • Is the resource's banks and channel as stable as it is upstream and downstream?

  • Will this site recover and eventually return to a wetland/stable stream channel?

  • Include at least 3 photographs of the resource (Banks/Channel, Upstream, Downstream). Additionally, be sure to photograph any area needing repair.

  • If repairs are needed, indicate the area needing repair by sketch.

  • Comments or Notes regarding repairs that may be needed at this resource.

  • Document Another Resource?

  • 4th Resource ID

  • Latitude/Longitude (EX: N15.38749/W075.54887)

  • Resource Type Pre-Construction

  • Resource Type Post-Construction

  • Have pre-construction contours been re-established?

  • Are there additional resources impacted at this site that were not identified in the application/permit?

  • Have all E&S Controls been removed from the aquatic resource area?

  • Is the site vegetated or otherwise permanently stable?

  • Has the Hydrology been restored to pre-construction conditions?<br>(Does the stream or wetland flow as it did before construction?)

  • Do the features within the LOD match the upstream and downstream features in the undisturbed portion of the stream/wetland?

  • Does Excess Fill Remain?

  • Is this site progressing toward returning to a wetland/stable stream channel?

  • Is the resource's banks and channel as stable as it is upstream and downstream?

  • Will this site recover and eventually return to a wetland/stable stream channel?

  • Include at least 3 photographs of the resource (Banks/Channel, Upstream, Downstream). Additionally, be sure to photograph any area needing repair.

  • If repairs are needed, indicate the area needing repair by sketch.

  • Comments or Notes regarding repairs that may be needed at this resource.

  • Document Another Resource?

  • 5th Resource ID

  • Latitude/Longitude (EX: N15.38749/W075.54887)

  • Resource Type Pre-Construction

  • Resource Type Post-Construction

  • Have pre-construction contours been re-established?

  • Are there additional resources impacted at this site that were not identified in the application/permit?

  • Have all E&S Controls been removed from the aquatic resource area?

  • Is the site vegetated or otherwise permanently stable?

  • Has the Hydrology been restored to pre-construction conditions?<br>(Does the stream or wetland flow as it did before construction?)

  • Do the features within the LOD match the upstream and downstream features in the undisturbed portion of the stream/wetland?

  • Does Excess Fill Remain?

  • Is this site progressing toward returning to a wetland/stable stream channel?

  • Is the resource's banks and channel as stable as it is upstream and downstream?

  • Will this site recover and eventually return to a wetland/stable stream channel?

  • Include at least 3 photographs of the resource (Banks/Channel, Upstream, Downstream). Additionally, be sure to photograph any area needing repair.

  • If repairs are needed, indicate the area needing repair by sketch.

  • Comments or Notes regarding repairs that may be needed at this resource.

  • Document Another Resource?

  • 6th Resource ID

  • Latitude/Longitude (EX: N15.38749/W075.54887)

  • Resource Type Pre-Construction

  • Resource Type Post-Construction

  • Have pre-construction contours been re-established?

  • Are there additional resources impacted at this site that were not identified in the application/permit?

  • Have all E&S Controls been removed from the aquatic resource area?

  • Is the site vegetated or otherwise permanently stable?

  • Has the Hydrology been restored to pre-construction conditions?<br>(Does the stream or wetland flow as it did before construction?)

  • Do the features within the LOD match the upstream and downstream features in the undisturbed portion of the stream/wetland?

  • Does Excess Fill Remain?

  • Is this site progressing toward returning to a wetland/stable stream channel?

  • Is the resource's banks and channel as stable as it is upstream and downstream?

  • Will this site recover and eventually return to a wetland/stable stream channel?

  • Include at least 3 photographs of the resource (Banks/Channel, Upstream, Downstream). Additionally, be sure to photograph any area needing repair.

  • If repairs are needed, indicate the area needing repair by sketch.

  • Comments or Notes regarding repairs that may be needed at this resource.

  • Document Another Resource?

  • 7th Resource ID

  • Latitude/Longitude (EX: N15.38749/W075.54887)

  • Resource Type Pre-Construction

  • Resource Type Post-Construction

  • Have pre-construction contours been re-established?

  • Are there additional resources impacted at this site that were not identified in the application/permit?

  • Have all E&S Controls been removed from the aquatic resource area?

  • Is the site vegetated or otherwise permanently stable?

  • Has the Hydrology been restored to pre-construction conditions?<br>(Does the stream or wetland flow as it did before construction?)

  • Do the features within the LOD match the upstream and downstream features in the undisturbed portion of the stream/wetland?

  • Does Excess Fill Remain?

  • Is this site progressing toward returning to a wetland/stable stream channel?

  • Is the resource's banks and channel as stable as it is upstream and downstream?

  • Will this site recover and eventually return to a wetland/stable stream channel?

  • Include at least 3 photographs of the resource (Banks/Channel, Upstream, Downstream). Additionally, be sure to photograph any area needing repair.

  • If repairs are needed, indicate the area needing repair by sketch.

  • Comments or Notes regarding repairs that may be needed at this resource.

  • Document Another Resource?

  • 8th Resource ID

  • Latitude/Longitude (EX: N15.38749/W075.54887)

  • Resource Type Pre-Construction

  • Resource Type Post-Construction

  • Have pre-construction contours been re-established?

  • Are there additional resources impacted at this site that were not identified in the application/permit?

  • Have all E&S Controls been removed from the aquatic resource area?

  • Is the site vegetated or otherwise permanently stable?

  • Has the Hydrology been restored to pre-construction conditions?<br>(Does the stream or wetland flow as it did before construction?)

  • Do the features within the LOD match the upstream and downstream features in the undisturbed portion of the stream/wetland?

  • Does Excess Fill Remain?

  • Is this site progressing toward returning to a wetland/stable stream channel?

  • Is the resource's banks and channel as stable as it is upstream and downstream?

  • Will this site recover and eventually return to a wetland/stable stream channel?

  • Include at least 3 photographs of the resource (Banks/Channel, Upstream, Downstream). Additionally, be sure to photograph any area needing repair.

  • If repairs are needed, indicate the area needing repair by sketch.

  • Comments or Notes regarding repairs that may be needed at this resource.

  • Document Another Resource?

  • 9th Resource ID

  • Latitude/Longitude (EX: N15.38749/W075.54887)

  • Resource Type Pre-Construction

  • Resource Type Post-Construction

  • Have pre-construction contours been re-established?

  • Are there additional resources impacted at this site that were not identified in the application/permit?

  • Have all E&S Controls been removed from the aquatic resource area?

  • Is the site vegetated or otherwise permanently stable?

  • Has the Hydrology been restored to pre-construction conditions?<br>(Does the stream or wetland flow as it did before construction?)

  • Do the features within the LOD match the upstream and downstream features in the undisturbed portion of the stream/wetland?

  • Does Excess Fill Remain?

  • Is the resource's banks and channel as stable as it is upstream and downstream?

  • Will this site recover and eventually return to a wetland/stable stream channel?

  • Is this site progressing toward returning to a wetland/stable stream channel?

  • Include at least 3 photographs of the resource (Banks/Channel, Upstream, Downstream). Additionally, be sure to photograph any area needing repair.

  • If repairs are needed, indicate the area needing repair by sketch.

  • Comments or Notes regarding repairs that may be needed at this resource.

  • Document Another Resource?

  • 10th Resource ID

  • Latitude/Longitude (EX: N15.38749/W075.54887)

  • Resource Type Pre-Construction

  • Resource Type Post-Construction

  • Have pre-construction contours been re-established?

  • Are there additional resources impacted at this site that were not identified in the application/permit?

  • Have all E&S Controls been removed from the aquatic resource area?

  • Is the site vegetated or otherwise permanently stable?

  • Has the Hydrology been restored to pre-construction conditions?<br>(Does the stream or wetland flow as it did before construction?)

  • Do the features within the LOD match the upstream and downstream features in the undisturbed portion of the stream/wetland?

  • Does Excess Fill Remain?

  • Is this site progressing toward returning to a wetland/stable stream channel?

  • Is the resource's banks and channel as stable as it is upstream and downstream?

  • Will this site recover and eventually return to a wetland/stable stream channel?

  • Include at least 3 photographs of the resource (Banks/Channel, Upstream, Downstream). Additionally, be sure to photograph any area needing repair.

  • If repairs are needed, indicate the area needing repair by sketch.

  • Comments or Notes regarding repairs that may be needed at this resource.

  • Inspector Name & Signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.