Title Page

  • please provide site for reference

  • Document reference

  • Conducted on

  • Prepared by

  • PROVIDE SNIP OF COMPARTMENT / APARTMENT

  • Photo of SNIP has walls color-coded, with photos having a color-coded identifier to show which photos belong to which wall.

  • LOCATION = BLOCK - COMPARTMENT REFERANCE

INSPECTION / CHECKS

SETTING OUT

  • Has the setting out been done correctly and is it to the latest drawings ?

  • All setting out in accordance with Architects drawing - 2609-4466-ZZ-B1-DR-A-031199 rev C04. Wall type as per masonry legend - 2609-WAL-ZZ-B1-DR-S-101130 REV C01 2609-4466-ZZ-B1-DR-A-031299 REV C02

  • Are the windows and door openings constructed to the correct width, height and plumb ?

  • All setting out in accordance with Architects drawing - 2609-4466-ZZ-B1-DR-A-031199 rev C04. Drawing shows opening sizes for this location.

  • Confirm coursing, perps and plumb are within acceptable tolerance ?

  • concrete block facework Plumbed at every fifth cross joint.

  • Locations for equal levelling of cavity wall leaves: Every course containing vertical twist type ties or
    other rigid ties, every third tie course for double triangle/ butterfly ties and courses in which
    lintels are to be bedded.

  • 5812 - Apex One - Structural Specification1. Courses: Level and true to line.
    2. Faces, angle and features: Plumb
    5812 - Apex One - Structural Specification
    Permissible deviations
    Position in plan of any point in relation to the specified building reference line and/ or point at the
    same level: ± 10 mm.
    Straightness in any 5 m length: ± 5 mm.
    Verticality up to 3 m height: ± 10 mm.
    Verticality up to 7 m height: ± 14 mm.
    Overall thickness of walls: ± 10 mm.
    Level of bed joints up to 5 m (brick masonry): ± 11 mm.
    Level of bed joints up to 5 m (block masonry): ± 13 mm.

  • Have movement joint been set out as per approved design and as per site requirements ?

  • As per detail 6 on drawing number - 2609-4466-ZZ-ZZ-DR-A-104105 Rev C01

  • Keyfix- PPE 225mm movement tie and Debonding Sleeve , as Approved , Installed as per KEYFIX EPE / PPE Movement Tie Technical Data Sheet

  • Set out to drawing - 2609-4466-ZZ-00-DR-A-031200 rev C05

Internal blockwork - Visqueen DPC

  • Has the Visqueen DPC been installed as per approved design (non-combustible) ?

  • DPC installed as per architects specification and design and installed as per details on drawing reference - 2609-4466-ZZ-ZZ-DR-A-104105 rev C01

BLOCKWORK

  • Have the specified cavity ties been used and are the ties installed as per manufacturer’s instructions- correct spacing/embedment ? below list of Keyfix ties are ties used Typically. Full list of ties ordered/ Used can be supplied if required.

  • installed as per KT1 -Masonry - Masonry Type 1 Wall Tie Technical Data Sheet

  • installed as per EDH Frame Cramp Type 1 Wall Tie Technical Data Sheet

  • Installed as per -Internal Head Restraint Blockwork - Existing Internal Structure Technical Data Sheet

  • Ties spacing as per - typical wall tie spacing in cavity wall (Detail) = 2609-WAL-XX-XX-DR-S-104130 REV C01

  • Have lintels been installed as per manufacturer instructions including correct bearing and correctly embedded ?

  • Installing lintels General As per Structural specification -
    Concrete lintels General
    1. Bedding: On mortar as used for adjacent work.
    2. Bearing length (minimum): 150 mm for openings <3000mm
    200mm for openings >3000mm

INSULATION

  • Has the correct insulation been installed per approved design ?

  • ROCKWALL Rainscreen RWA45 Slab 100 x 600 x 1200mm - as per design

  • Has insulation been installed as per manufacturers instructions and is tightly abutted with no gaps ?

Windposts

  • Has the masonry support been installed as per manufacturers instructions ?

  • Installed in location set out by drawing ref= 2609-4466-ZZ-00-DR-A-031200 C05 , ,

  • Installed as per drawings =
    2609-WAL-ZZ-00-DR-S-101131 REV C01
    Windpost Design Data Sheet - GF - WA.BWK.B5 Windpost Design Data Sheet - GF - WA.BWK.11

FIRE BARRIER - Blockwork ARC-FSS

  • Fire barrier type / manufacturer? ARC-fire stop strip installed as per datasheet= F30 - 670 - ARC-Fire-Stop-Strip-v4.9 / Vertically= ARC Fire Stop Strip 100mm x 10mm x 1200mm / ARC Fire Stop Strip 140mm x 10mm x 1200mm

    Horizontal = ARC Fire Stop Strip 100mm x 20mm x 1200mm / ARC Fire Stop Strip 140mm x 20mm x 1200mm

  • Has the fire barrier been approved by the architect and is installed as per approved design/ installation guides?

completed Walls

  • Has the work area been left clean and tidy once work have been completed ?

ADDITIONAL INFORMATION

  • Please provide any additional relevant information/notes/photos here IF REQUIRED

NOTES

  • QA Sheets issued as work is progressing (works must be inspected by MC within 24 hrs of sheet submittal and will be deemed accepted after that period to ensure no delay to site progress)

SIGNATURES

  • 1) ON BEHALF OF CALLAN CONSTRUCTION = Aaron Martin

  • Signature =

  • Date and time =

  • 2) ON BEHALF OF PRINCIPLE CONTRACTOR--

  • 2 ) DATE

undefined

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.