Information
-
Client / Site Name:
-
Contract Ref:
-
Site Address:
-
JRN:
-
Engineer:
-
Arrival Date:
-
Arrive Time:
-
Depart Time:
Pre Open Panel Checks
-
Was your ID card shown?
-
Was the ARC informed of your presence? (Please log times)
-
Enter time system was put on test
-
Has there been any problems or changes to the site?
-
Has a visual inspection been carried out?
-
Does all detection devices operate correctly?
-
Does the system conform to the as fitted document?
-
Have you checked bell delay (if programmed) and duration time?
Panel Checks
-
Transformer output voltage (vac)
-
Induced AC voltage (vac)
-
Auxiliary output voltage (vdc)
-
Battery charge voltage (vdc)
-
Battery charge current (a)
-
Battery load test (ah)
-
SAB test
Communication & Signalling Tests
-
Is the system have any method of signalling?
-
Test line sensing
-
PIN 1 - Fire
-
PIN 2 - PA
-
PIN 3 - Intruder
-
Test line sensing
-
PIN 1 - Fire
-
PIN 2 - PA
-
PIN 3 - Intruder
-
PIN 4 - Open & Close
-
PIN 5 - Zone Omitted
-
PIN 6 - Tamper
-
PIN 7 - Confirmed
-
PIN 8 - AC Fail
Closed Control Panel Checks
-
Has the system been left in customer mode?
-
Has a report of signalling tests been received?
-
Has the ARC been informed to reinstate response?
-
Time Off Test?
-
Any none conformities, work carried out that requires documenting?
-
Description
Engineer's Acceptance
-
For and on behalf of Synergy AV LTD
Customer Acceptance
-
For and on behalf of the customer