Information
-
Audit Title
-
Document No.
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
-
Contract Manager
- Daniel Parker
- Rimas Klumbys
-
LL Supervisor on site
-
Principal Contractor
-
Copied to
PRICE WORKS ACTIONS
Type of Works
-
Type of works
- Hoarding Works
- Set Up
- Strip out
- Furniture Move
- Painting Works
- Other
-
Comments
Site File (To include if required)
-
Drawings
-
Scope / B.Q
-
Start & Finish Date / Programme
-
Access Permits
-
Damage Survey
-
RAMS
-
Tool Box Talks
-
CVI Forms
-
Time Sheets
-
Sign Off Sheets
H & S
-
Induction
-
RAMS Issued to Main Contractor
-
RAMS Approved by Main Contractor
-
Training Certifications
-
COSHH Assessments
-
Manual Handling
-
Noise Assessment
-
HAVS
-
Toolbox Talk
-
All H&S Paperwork signed by operatives
Plant & Equipment
-
Ladders
-
Podiums
-
Mobile Towers
-
Scissor Lifts
-
Pallet Trucks
-
Skate Board
-
Trolley
-
A-Frame
-
Genie Lift
-
110v Cordless Drill
-
110v Henry Hoover
-
110v Wet/Dry Hoover
-
110v 16amp Extension Lead
-
110v 32amp Extension Lead
-
110v Temporary Task lights
-
110v 3KVA Transformer
-
110v 5KVA Transformer
-
110v Gango & bits
-
110v Skill Saw
-
110v Jigsaw & blades
-
110v Recipsaw & blades
-
110v 5" Grinder & discs
-
110v 9" Grinder & discs
-
Correct no order
-
Check and record any damage
-
Maintenance
-
Security of all plant
Standard Tool kit
-
PW Toolbox from yard
-
Check toolbox inventory
-
Chain and padlocks
-
First aid box
-
Spray paint
-
Tape
-
Cable ties
Materials
-
Correx
-
Insulation pins
-
Hardboard
-
Plywood
-
Timber
-
Tape
-
Screws
-
Other
Labour required
-
Logistics Manager
-
Ganger
-
Carpenter
-
Handyman
-
Labourer
-
Decorator
-
Banksman
PPE
-
Hard Hat
-
LLL Hi-vis Vest
-
Eye protection
-
Ear protection
-
Masks
-
Boots
-
Gloves
-
Other Specific PPE
Isolations
-
Sprinkler Systems
-
Smoke Detectors
-
Fire Alarm System
-
Water Supply
-
High level power
-
Low level power
-
Intruder alarm
-
BMS
-
Ventilation System
-
Gas Suppression System
Waste Management
-
Bins and skips provided
-
Separation of waste
-
General rubbish
-
Certification for removal
Hazardous waste
-
Drums provided
-
Separation of waste
-
Correct forms used
-
Certification for removal
Delivery Management
-
Awareness of Logistics/Fire plan
-
Booking deliveries
-
Management of deliveries
-
Daily reports produced
Access
-
Safe routes available?
-
Lift / hoist available?
-
Loading bay?
-
Other
ADDITIONAL COMMENTS
-
Details:
ISSUES TO BE REPORTED ON issues@leanerlogistics.co.uk
-
ISSUE 1
-
ISSUE 2
-
ISSUE 3
-
ISSUE 4
-
ISSUE 5
-
Signature of Auditor:
-
Signature of LL Supervisor on site: