Information
-
Property No.
-
Owner/Applicant
-
Conducted on
-
Inspected by
-
Address
-
Location
Septic Tank
-
System installed as per approved specification (brand / model, concrete / polypropylene)
-
System installed as per approved plan (>2.5m from any building or dwelling
-
All relevant internal components present as per specifications (ie growth media, pumps, air diffusers, UV lamp etc)
-
Tank/s level and correct bedding supporting tank/s as per manufacturer requirements IMPORTANT
-
Air blower opening to tank sealed
-
Tank lid centred with inspection openings directly above the inlet/s and outlet/s
-
T-junction installed at inlet of tank
-
Adequate support (benching) for connecting pipe work between tanks (where dual tanks)
-
Tank/s are a minimum of 100mm above ground level
-
All electrical wiring is protected by conduit that is fixed to the tank and is supported where necessary with allowance for subsidence
-
Comments
-
Signature