Information

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • This inspection/audit has been undertaken by C & D Consultancy as part of the agreement between C & D Consultancy and the Client. The purpose of the inspection/audit is to ensure the Principal Contractors compliance with the Health and Safety at Work Act 1974 and any relevant subordinate legislation, including but not restricted to, the Management of Health and Safety at Work Regulations 1999, BS 6187: 2011, the Construction (Design & Management) Regulations 2007, the Control of Asbestos Regulations 2012 and the Working at Heights Regulations 2005. The report aims to identify any areas where the Principal / Main Contractor needs to improve to meet the requirements of all relevant health and safety regulations and industry best practice procedures.

  • Have items from previous inspections been closed out?

Hazard spotting

    Hazard
  • Close out timescale

  • Closed out by (sign and date)

  • Hazard definition

Procedural Compliance

  • Record area of inspection

  • Non-compliance
  • Details of non-compliance noted

  • Closed out by (sign and date)

Positive observations

    Positive observation

Inspection Sign off

  • Add signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.