Title Page

  • Conducted on

  • Prepared by

  • Flight number and a/c registration
  • Type, quantity and weight of freight handled

  • Dispatcher - GSE operator(s) - nr. of FC handling staff

items audited

  • 1) Is the dispatcher well informed about the cargo situation (type/weight/number) on his flight?

  • 2) The dispatcher correctly planned the position of the cargo to be load?

  • 3) Are all the staff present at a/c informed about the presence of the cargo?

  • 4) The belt loader has all the handrails raised BEFORE the handling of the cargo? (if compatible with cargo dimension)

  • 5) The GSE operator supervisioned the operations ALL THE TIME?

  • 6) During offloading, the belt conveyor was stopped BEFORE MOVING the freight from a/c' sill to belt loader?

  • /) During loading, the belt conveyor was stopped BEFORE MOVING the freight from belt loadet to a/c's sill?

  • 8) The item was correctly handeled and its movement was assisted by the loading staff?

  • 9) All the cargo loaded was secured accordingly with his type?

  • 10) The dispatcher verified the conditions of the cargo offloaded and the item prior loading?

  • 11) Any damage or awb/notoc discrepancy was correctly identified and handled?

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.