Title Page
-
Client / Site
-
Conducted on
-
Prepared by
-
Personnel
-
This Inspection is an assessment of the conditions and activities on the project worksite at the time of the visit. The conditions & activities are assessed against agreed expectations between PCBU’s, legislative and regulatory requirements and/or industry best practice.
…
Assessment Criteria:
…
Meets Expectations (ME) = The assessed condition or activity meets current expectations.
...
Opportunity For Improvement (OFI) = The assessed condition or activity does not fully meet current expectations.
...
At Risk (AR) = The assessed condition or activity does not fully meet current expectations and as a result there is an intolerable level of risk of harm to people, the environment and/or the business.
...
Not Checked (NC) = The condition or activity was not checked.
...
Not Applicable (NA) = The condition or activity was not present.
1. Pre-Inspection Planning
-
What is the Focus for the period:
Select the Classic Group process reviewed as part of the inspection pre-planning:
-
CASE Coach Observations.
-
CASE Coach Inspections.
-
CM/SM's Observations.
-
CM/SM's Inspections
-
CM/SM's Toolbox Meetings.
-
CM/SM's assigned corrective actions.
-
CASE processes - web console
-
Pre-planning Notes:
2. Inspection Criteria
-
Select the criteria that is applicable to your site inspection:
- Classic Group Processes
- Lead Contractor Admin Controls
- Subcontractor Admin Controls
- CASE
- Excavations/Trenches
- Heavy Machinery
- Lifting Operations/Cranage
- Live Services
- Working at Heights
- Asbestos
- Confined Space
- Electrical Power Tools, RCD's & Leads
- Emergency Preparedness & Response
- Environmental
- Hazardous Substances
- Hotwork
- Housekeeping
- PAT's
- PPE/PPC
- Safety Signage
- Silica and Inhalable Dust
- Site Fencing & Security
- Supervision
- Worker Facilities
Working at Heights
Working At Heights - General
-
Is there a Task Risk Assessment in place for working at heights activities (proof of regular review and communicated to all workers involved)?
-
Activity Pre-Start completed?
-
Workers use safe means of access e.g. ladder, EWP, scaffold etc.
-
Is there risk of falling to a lower level?
-
Ladders of commercial grade and used correctly?
-
Exclusion zones implemented for overhead work activities?
-
Safety harness worn and used correctly where required? i.e appropriate lanyard lengths, hook on points.
Working at Heights - Other
-
Select the 'other' working at heights criteria that applies to your focus for the period:
- Scaffolding
- Safety Nets
- MEWP's
Scaffolding
-
Scaffold inspected by a competent person (competency of scaffold inspector verified)?
-
Has a handover certificate been issued for the scaffold?
-
Is the scaffold tagged and has it been inspected within the last 7 days?
-
Are scaffold jacks sitting squarely on the sole boards?
-
Is the access point gated and is it self-closing?
-
Are there any scaffold components missing e.g. braces, hand rails, mid rails, toe boards etc.
-
Housekeeping maintained on scaffold platforms / landings (safe access and egress)?
-
Are scaffold planks secured / tied down?
-
Scaffold planks in good condition (pitting, excessive rust, splitting / saw cuts in timber planks etc.)?
-
Do gaps between the scaffold platform and work face exceed 300 mm and create a risk of inward falls?
-
Gaps between the planks/ bays do not exceed 50 mm?
-
Temporary work platforms (mobile scaffold) built to Good Practice Guidelines?
-
Temporary work platforms (more than 1 bay and higher than 2 m) tagged inspected within the last 7 days?
Safety Nets
-
Safety nets installed where required and to standard?
-
Safety nets certificate available for inspection?
-
Safety nets in a good condition (visible signs of damage to the safety net system)?
-
Have the nets been installed as close as is reasonably practicable to the underside of<br>the task area?
-
Are all gaps between net and structure less than 100 mm?
-
Is the net clear of debris?
Mobile Elevating Work Platforms
-
MEWP operator certified to operate equipment?
-
MEWP inspected prior to use?
-
MEWP used in accordance with manufacturers guidelines?
-
MEWP maintenance intervals maintained (6-monthly)?
1.2 Lifting Operations/Cranage
-
Is there a Task Risk Assessment in place for Lifting Operations/ Cranage activities (proof of regular review and communicated to all workers involved)?
-
Activity Pre-Start completed?
-
Crane certs in place and dates valid?
-
Crane operator licensed / certified to operate crane (HiAb US 16617 and Cranes US 3730)?
-
Rigger / Dogman certified and competent to conduct crane lifts (US 30072)?
-
Is there a lift plan in place & has it been communicated all workers involved?
-
Rigging and lifting gear in good condition with current tags / certificates?
-
Exclusion zones established?
-
Crane established on firm solid ground, outriggers fully extended and outrigger pads in place?
-
Tag lines used to control the load (where required e.g. wind conditions)?
-
No overhead lifting?
-
Is there evidence of overriding the crane safety system (e.g. disabling the anti-two block or crane safety system)?
Heavy Machinery
-
Is there a Task Risk Assessment in place for Heavy Machinery (proof of regular review and communicated to all workers involved)?
-
Activity Pre-Start completed?
-
Exclusion zones implemented and maintained, where appropriate?
-
Equipment servicing up to date?
-
Equipment operators licensed to operate machinery?
-
Equipment inspected prior to use, faults identified & reported?
-
Spotters used during heavy machine operation?
-
Before U Dig plans obtained and check for live services conducted?
1.4 Working Around Live Services
-
Is there a Task Risk Assessment in place for Working around Live Services (proof of regular review and communicated to all workers involved)?
-
Activity Pre-Start completed?
-
Supporting evidence of service locations provided and available (before-U-dig, as-builds, site mark up plans, GPR location etc.)?
-
Before U Dig plans no older than 28 days from request date?
-
Minimum Approach Distance (M.A.D) Permit obtained and adhered to (where required)?
-
Services de-energised/ isolated where required?
-
Services marked and physically located/ verified (hand dug trial holes)?
-
Controls in place to prevent contact / damage i.e. spotter, stand-over, mud bucket etc.?
CASE
-
QR code in place?
-
Signed in using CASE App?
-
Induction completed?
-
Current hazard list relevant?
-
Activity Pre-Start completed?
Lead Contractor Admin Controls
-
Sign in / out register in place and maintained?
-
Workers inducted (including subcontractors)?
-
Lead Contractor's Worksite Management Plan in place?
-
Daily Pre-Start Notice completed for today (CBC)?<br>
-
Site reviews / inspections conducted weekly by appropriate persons?
-
Toolbox meetings held weekly, documented topics and proof of attendance?
-
All corrective actions closed out by the recommended due date?
-
Traffic management plan in place, current and approved by Road Corridor Authority?
-
Hazardous Substances register in place?
-
SDS's in place for all hazardous substances on site?
Subcontractor Admin Controls
-
Subcontractor Review
-
Subcontractor reviewed:
-
Subcontractor SSSP's in place?
-
Subcontractor SSSP evaluated and verified by lead contractor?
-
Worksafe hazardous work notifications submitted (where required)?
-
TA/TRA's in place where required and signed off accordingly?
-
Training and competency register in place?
-
Plant & Equipment register in place for safety critical plant and equipment?
-
Hazardous Substances register in place?
-
SDS's in place for all hazardous substances on site?
Emergency Preparedness and Response
-
Emergency response plan in place?
-
Is the Emergency Plan displayed?
-
Emergency evacuation layout plan displayed and assembly point identified?
-
Emergency contact details displayed?
-
Is a trained First Aider on site?
-
Are adequate First Aid kits available (including eyewash)?
-
Are adequate Fire Extinguishers available?
-
Spill kit available?
Supervision
-
Are subcontractor workers adequately supervised?
-
Are PCBU 3 subcontractors adequately supervised?
Safety Signage
-
Is warning signage in place at all access points?
-
Is a Site Safety Board displayed near the site entry?
-
Is a QR Code displayed?
-
Are current Hazards and Controls listed on the Site Safety Board?
-
Is the Emergency Assemby point signposted?
-
Are worksite 'Key Contact' details displayed at the site entrance?
-
Are minimum PPE requirements displayed?
PPE/PPC
-
Are minimum PPE requirements complied with?
-
Is the correct PPE being worn relevant to the exposure risks?
-
Is the PPE in good condition?
Housekeeping
-
Is the work area clean and free of excess trash or debris?
-
Are materials and equipment properly stored or stacked?
-
Are scrap materials free of protruding nails or other puncture hazards?
-
Are waste bins available and maintained?
-
Are waratah end caps installed and maintained?
Hazardous Substances
-
Are Hazardous Substances being used and stored correctly?
-
Are the amounts of Hazardous Substances on site limited to an "in use" amount?
Asbestos
-
Has ACM been considered as being present on the worksite?
-
Is an ACM plan in place?
-
Is the ACM plan being followed?
-
Have Worksafe been notified of ACM? (>10sqm friable)
-
Are workers handling ACM competent?
Silica and Inhalable Dust
-
Are bricks and concrete saws operating with water suppression?
-
Is the saw waste water contained to minimise runoff?
-
Is the dust from dried waste water being eliminated?
-
Are power cutting tools fitted with an 'At Source Extraction' system?
-
Is the vacuum system 'M' class rated for silica dust?
-
Is the extraction system in good working condition?
-
Are fibre cement sheets cut using the correct tools/ methods i.e. shears or score & snap method?
-
Are workers exposed to dust wearing P2 rated dust masks?
-
Is the site free from excess settled dust?
-
Is a vacuum system used to clean surfaces?
PAT's
-
Are PATs used by competent operators?
-
Are exclusion zones in place?
-
Are warning signs in place?
-
Are misfired charges secured and discarded correctly?
-
Are the PATs secured when not in use?
Electrical Power Tools, RCD's & Leads
-
Is Electrical Equipment in good working order (all guards in place, no damage to casing, no cuts in cable etc.)?
-
Does Electrical Equipment have a current Test & Tag?
-
Are temporary power sources fitted with an RCD i.e. Lifeguards?
Environmental
-
Are silt fences in place?
-
Is the silt fence in good working order?
-
Are silt socks/gutter bags in place at stormwater inlets?
-
Are the silt socks/gutter bags in good working order?
-
Are accessways metalled?
-
Is sediment and run-off fully contained with the site boundary?
-
Are vehicles/ plant tracking mud into the road reserve?
Site Fencing & Security
-
Is the worksite fully fenced?
-
Is the fence in good working order?
-
Is site access controlled?
-
Are site gates lockable?
Hotwork
-
Are Hot Works being correctly managed?
-
Are Hot Work activities meeting the Hot Works Permit requirements?
Confined Space
-
Is there a Task Risk Assessment in place for working at heights activities (proof of regular review and communicated to all workers involved)?
-
Does the Emergency Response Plan cover Confined Space rescue?
-
Are Confined Space activities correctly managed and meeting Confined Space requirements (i.e. permits, competency requirements etc.)?
Worker Facilities
-
Appropriate number of toilets onsite (male/ female), clean and hygienic?
-
Clean, potable water readily available onsite?
-
Smoko shed available for use?
Excavations/Trenches
-
Is there a Task Risk Assessment in place for Excavations/ Trenches (proof of regular review and communicated to all workers involved)?
-
Activity Pre-Start completed?
-
Edge protection around open excavations or where there is a risk of fall onto a lower level?
-
Excavations shored and braced/ benched/ battered where required?
-
Safe access and egress provided into the excavation?
Classic Group Processes
-
Is the monthly focus verified in the Observations/Inspections/Toolbox's where applicable?
-
Have other finding of a critical/high risk nature been recorded in the various H&S processes?
-
Has supporting photo's/ screenshots been included as part of the findings?
-
Has corrective actions been generated for OFI's/At Risk/ or Reckless findings?
-
Is there evidence that the actions have been closed out?
-
Are there any repeat findings?
3. Other Observations
-
What was your Observation?
Click on the "+ button" over here ---->--->
Observation
-
What was your Worksite Observation?<br>(Select one of the following)
4. Inspection Summary
-
Inspection Summary: