Title Page
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
Site Setup
-
Is the induction manual being completed correctly?
-
Is the working area correct segregated from the public i.e cones, tape or barrier?
-
Is the H & S and Catalyst board being displayed in a visible location?
Contractor Review
-
Are the contractors signing in correctly
-
Is the appropriate PPE being worn by the Contractors
-
Are the works being carried out to acceptable levels
Program of Works
-
Is the project on time?
-
How long will the project be delayed and WHY?
Site Materials
-
What material area being stored onsite?
-
Are the material stored in a safe manner?
-
Are there any other materials required to site URGENTLY?
Site Observations
-
Enter details of observation
Observation
-
Observation Details
-
Add media
-
Date for follow up
Sign-off
-
Signature of Project Manager
-
PM signature
-
Project Manager Signature
-
Signature of Client / Contractor
-
Client or Conractor signature
-
Client / Contractor Signature