Title Page
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
Health and Safety Audit
1. Scaffolds, Access Towers
-
1. Scaffold ,Access Towers
-
Comments
-
Add media
2. Means of access
-
2. Means of access
-
Comments
-
Add media
3. Lifting appliances/machines/gear
-
3. Lifting appliances/machines/gear
-
Comments
-
Add media
4. Demolition
-
4. Demolition
-
Comments
-
Add media
5. Equipment and machinery
-
5. Equipment and machinery
-
Comments
-
Add media
6. MEWPs, plant etc.
-
6. MEWPs, plant etc.
-
Comments
-
Add media
7. Cartridge tools
-
7. Cartridge tools
-
Comments
-
Add media
8. Electrics/portable tools
-
8. Electrics/portable tools
-
Comments
-
Add media
9. Underground and overhead services
-
9. Underground and overhead services
-
Comments
-
Add media
10. Fire precautions
-
10. Fire precautions
-
Comments
-
Add media
11. Flammable liquids and LP gas
-
11. Flammable liquids and LP gas
-
Comments
-
Add media
12. First aid, health and welfare
-
12. First aid, health and welfare
-
Comments
-
Add media
13. PPE/RPE
-
13. PPE/RPE
-
Comments
-
Add media
14. Registers and other documents
-
14. Registers and other documents
-
Comments
-
Add media
15. Site tidyness
-
15. Site tidiness
-
Comments
-
Add media
16. Promulgation of notices
-
16. Promulgation of notices
-
Comments
-
Add media
17. Roofs-fragile/protected
-
17. Roofs-fragile/protected
-
Comments
-
Add media
18. Staircases
-
18. Staircases
-
Comments
-
Add media
19. Lightning
-
19. Lightning
-
Comments
-
Add media
20. Floor edge protection
-
20. Floor edge protection
-
Comments
-
Add media
21. Asbestos material
-
21. Asbestos material
-
Comments
-
Add media
22. COSHH
-
22. COSHH
-
Comments
-
Add media
23. Environmental and waste management
-
23. Environmental and waste management
-
Comments
-
Add media
24. Miscellaneous
-
24. Miscellaneous
-
Comments
-
Add media
25. Audit Score (Percentage)
-
Rating: 1- immediate action required 2- Action to be taken as soon as is reasonably practicable
Note: For every non-conformance (category 1) 4 points are deducted from the starting score of 100%, for every non-conformance (category 2) 2 points are deducted from the starting score of 100%.
26. Audit close out actions
-
Category 2 non-conformance(s) requiring actions
Category 2- item number
-
Non conformance item
-
Category 1 non-conformance(s) requiring actions
Category 1- item number
Approval/Acceptance
-
Project Manager
-
Site Manager