Administrative Job Site Requirements

  • Active construction area clearly barricaded or identified in field?

  • Emergency contacts, egress routes and evacuation muster points identified and in project binder?

  • Project signage posted and easily identified?

  • Project-specific documentation (SHE, EAP, HASP, SWP, Fall Plan, Etc) available?

  • Procedure 12 signed off?

JSA COMPLIANCE

  • JSAs readily accessible and up to date?

Onsite Contractor JSA Audit Review; audit at least one JSA per active contractor.

  • Name of Contractor?

  • Name of JSA?

  • Is the JSA signed by the contractors working on the job?

Onsite Contractor JSA Audit Review; audit at least one JSA per active contractor.

  • Name of Contractor?

  • Name of JSA?

  • Is the JSA signed by the contractors working on the job?

Onsite Contractor JSA Audit Review; audit at least one JSA per active contractor.

  • Name of Contractor?

  • Name of JSA?

  • Is the JSA signed by the contractors working on the job?

Training and Competency

  • Contractor Foreman/ Competent Persons OSHA 30-Hour Construction Trained?

  • Do all contractors have a minimum of OSHA 10-Hour Construction?

Daily Safe Plan of Action (SPA); audit minimum of one SPA per active contractor.

  • Daily SPA accurately reflects work, means/ methods, and precautions?

  • Daily SPA reviewed and signed by Superintendent and Safety Professional?

  • Daily SPA readily accessible in the field?

  • Daily SPA completed and signed by contractor foreman and contractors performing the work?

Housekeeping

  • Are materials stored properly?

  • Are the walking and working surfaces clear, clean, trip hazards eliminated?

  • Is trash being centered piled and collected routinely throughout work day?

  • Has construction dumpster been designated and located for the project?

  • Is dumpster door secured open and cover removed if workers must access dumpster?

  • Is the dumpster safely accessible with secure ramps in place?

  • Dumpsters are covered if needed?

PPE

  • ANSI Z87 compliant safety glasses, or equivalent, in use by everyone on the project?

  • ANSI Z41 compliant safety toe footwear in use by everyone on the project?

  • Cut resistant gloves meeting ANSI Cut Level 4 or higher in use by everyone on the project?

  • Hard hats in use by everyone on the project?

  • ANSI Class 2 high visibility outerwear in use when required: around mobile equipment, in active lots and roads and in low light situations?

  • All PPE is in safe working condition and fit for use?

  • Additional PPE identified in JSA or SPA in use? i.e. hearing protection

  • Is respiratory protection in use? (voluntarily or required)

  • Is Medical Clearance and Fit testing verified for tight fitting cartridge respirator users?

  • Respiratory users have a clean shave?

  • Voluntary users of respirators provided with 1910.134, Appendix D, Information for Employees using Respirators When Not Required?

  • Voluntary users of respirators signed voluntary respirator form?

Fall Protection

  • Is elevated work 4' or more above a lower level detailed in a Elevated Work Permit or Fall Protection Plan (NOT including LADDERS/MEWPs)?

  • Are contractors compliant with Elevated Work Permit or Fall Protection Plan?

  • Post fall-event response identified and documented in Fall Protection Work Plan?

  • Adequate fall height clearance and swing fall clearance confirmed?

  • PFAS components are compatible, inspected and in safe working order?

  • PFAS anchorage points are properly rated and are either engineered or evaluated by a Qualified Person?

  • Suspension trauma straps are in use when PFAS is used?

  • Leading edges, hole openings, excavation, etc. greater than 4' from a lower level protected by compliant guardrail, warning line system or covered and identified as required?

  • Guardrail meet 1926.502(b) and rails are capable of withstanding 200lbs at the top rail with top rail at 42" (+/-3") and middle railing at 21" or midway between surface and top rail?

  • Warning Lines meet 1926.502(f)(2) with flags every 6' at a height 34-39" and a breaking strength of 500LBS.

  • Warning Lines are erected at 15' (6' for roofing activity) from unprotected edge and access routes within 15' (6' for roofing activity) of unprotected edge are protected by guardrail?

  • Where applicable, Leading Edge rated PFAS equipment is in use?

  • Holes or openings in walking and working surfaces are covered with covers secured in place, marked 'HOLE' or 'COVER' and meeting or exceeding CD&A/Merck additional requirements?

Fire Safety and Hot Work

  • 10LBS ABC fire extinguishers available with in 50 feet of work with one extinguisher for every 3000 square feet of project area?

  • Are all fire extinguishers current with annual and monthly inspections documented on tag or decal?

  • Are the sprinkler heads and fire protection systems unobstructed ( sprinkler heads clear by 18'' or greater)?

  • Fire system (fire/ smoke detection, horns/ strobes) impairments are managed with Fire Protection System Impairment Permit?

  • Egress routes and stairwells clear of combustible or flammable materials?

  • Are flammable and combustible materials stored properly?

  • Is hot work being performed?

  • Is all work involving flame/sparks detailed on the daily Hot Work Permit for each contractor performing hot work activities?

  • All precautions detailed on Hot Work Permit are in place, addendum attached and the permit is properly executed?

  • Are fire watches trained on proper extinguisher use and is documentation available in PIMS?

  • Are fire watches trained on their responsibilities and documentation available in PIMS?

  • Combustibles including paper, plastic, wood, drywall, cardboard, etc. are moved at least 35' from hot work or protected with fire blankets?

  • Hot work equipment in safe working order with cylinders secured upright, functional gauges, flash back arrestors in place, etc.

  • Compressed gas cylinders are secured upright, fuel separated from oxygen by 25' or fire rated divider, regulators removed and valve protector caps installed when in storage?

  • Welding equipment is in safe working order with intact leads, local disconnect, secure electrical connections, etc.?

General Safety

  • Is work area properly illuminated?

  • Temporary lighting properly installed with guards/ cages in place, if applicable?

  • Is equipment guarding in place as per manufacturers instructions?

  • Are tools and equipment inspected and in good condition prior to use?

  • Are powder/fuel actuated tools in use?

  • Are employees properly trained in use?

  • Has the appropriate powder/fuel actuated tool permit been completed?

  • Ladders/ Stairs/ Scaffolds.
  • Is any scaffolding in use?

  • Is scaffolding built by a qualified competent erector, built correctly, secured, tagged correctly? (check mudsills or locked wheels)

  • Does the scaffolding have safe access and egress for workers?

  • Are all scaffold inspected daily by a Competent Person?

  • Are mobile/ rolling scaffold wheels locked?

  • Are Holes/penetrations protected with secured covers labeled "HOLE" or barricaded?

  • GES-specific hole and cover guidelines adhered to?

  • Are platforms protected by handrail, midrail and toe board?ZA

  • Are ladders in use?

  • Are ladders in good condition? Labels, rungs, feet...

  • Are all A frame ladders podium type?

  • Are all ladder labels and warnings present and legible?

  • Are ladders in use being used safely, as intended and stored correctly?

  • Are ladders setup on solid ground with braces fully engaged and locked with all four feet supported on flat surface?

  • Ladders are NOT placed in front of doorway, emergency exit route or in the way of any other construction equipment.

  • The waist of the ladder user is NOT above the top step and workers are not twisting body excessively reaching to work while on ladder?

  • Are extension ladders being used safely with proper pitch, ladder secured and a 36 inch overhang?

Crane Lifting / Rigging.

  • Is there a scheduled lift today?

  • Has the lift plan and permit been completed and reviewed with all affected personnel?

  • Is there a trained signal person in "line of sight" of operator or other means of communication with operator?

  • Has the qualified rigger inspected all lifting equipment prior to use? Is it in safe working order, tagged, compatible and properly rated?

  • Has the crane set up area been properly barricaded?

  • Has the crane erection area been surveyed for subsurface utilities or installations?

  • Is crane equipped with Load Management Information System (if applicable)?

  • Is crane equipped with wind speed monitor (anemometer) or is wind speed being monitored in real time?

  • Anti-two block safety device present and functional?

  • Have all the areas within the swing radius been evacuated and notified, with proper signage , barricaded with danger tape and evacuated?

  • Are tag lines being used to control the load?

  • Spill containment kit available, tarp under crane and drains protected (if needed)?

  • Is crane erected level with proper outrigger cribbing?

  • Outrigger safety pins present?

  • Has the crane inspection been completed and documented?

Health Exposures

  • Is hearing protection being utilized for noise exposures above 85db?

  • Have silica exposures been assessed and addressed in accordance with the OSHA silica standard?

  • Have potential asbestos exposures been assessed?

  • Have potential lead exposures been assessed?

  • Has the potential for residual materials been assessed in ductwork, pipes, laboratories, etc?

Core Drill and Saw Cutting

  • Has the surface been scanned to identify utilities?

  • Has an applicable core drill permit been initiated and addendum attached?

Excavation and Trenching

  • Is there an active excavation on the project?

  • Has Excavation Competent Person been identified and documented?

  • Has Competent Person classified the soil as Class C?

  • Has utility Pa One Call/ Miscellaneous Utility notification been made by excavator? (Verify on permit)

  • Utility mark out is clear with field marks being properly maintained?

  • Has the excavation permit been reviewed and completed?

  • Has utility location taken place? 25 feet outside the perimeter of the excavation? Verify report

  • Are the trenches/ excavations sloped properly or shored and barricaded?

  • Is shoring and shielding properly selected, compatible and inspected by a competent person?

  • Tabulated data onsite?

  • Structural stability of adjacent structures maintained?

  • Spoils and heavy materials not stored within 24" of excavation?

  • Is this a PSA area?

  • Are all workers properly trained in Hazwoper ( Hazwoper Sup, etc.)?

  • Is continuous air monitoring being conducted per site requirements?

  • Has a weather event occurred since initial evaluation from a Competent Person?

  • Is trench/ excavation greater than 4ft?

  • Is there proper egress in place, ladders within a 25' lateral travel distance?

Confined Space

  • Are all confined spaces on the project identified and labeled by the site?

  • Is there a confined space entry being performed during this audit?

  • Entrants, Attendants and Entry Supervisors confined space trained?

  • Are permit required confined spaces being reclassified or Alternate Procedure entries made being using CDA documented process?

  • Confined Space Permit in place and properly executed for permit required entries?

  • Confined Space Attendant maintaining Entrant log properly?

  • Confined Space Attendant has radio, cell phone or other means of communicating with site security or emergency services?

  • Has SSPR been contacted prior to entry?

  • Has SSPR been contacted after all entrants have exited the confined space?

  • Confined Space Attendant maintaining atmospheric monitoring log properly?

  • Non-entry rescue system in place for permit required entries?

  • Entry rescue team or service confirmed available (SSPR)?

  • Pre-entry 4 gas atmospheric testing conducted at various levels (top, middle, bottom) / areas in permit required confined space?

  • 4 gas atmospheric testing conducted (top, middle, bottom) before and continuously during entry?

  • Atmospheric monitor calibrated and bump tested properly?

  • Proper forced air ventilation in place before and continuously throughout entry?

  • Ventilation intake appropriate distance away from space exhaust or other sources of contamination?

  • Confined spaces are locked and tagged out, drained/ purged, pumped out, cleaned, etc. prior to entry (if applicable)?

Material Handling and Heavy Equipment

  • Is there motorized heavy equipment being used?

  • Has the proper pre-operational inspection been performed and documented?

  • Spill kit onsite and available in equipment operation area?

  • Do the operators have the proper training for the equipment being used?

  • Are seat belts used by all operators?

  • Do the motorized vehicles have proper back up alarm?

  • Are flaggers in place where needed?

  • Are there an adequate number of flaggers per site requirements?

  • Is the rollover protection system (ROPS) in place and maintained?

  • No field or owner made modifications made to equipment or attachments?

  • Forklift/ telehandler attachments are approved in writing by forklift/ telehandler manufacturer?

  • Equipment capacity is adequate for intended loads or does the contractor have appropriate documentation?

  • Is the equipment operated more than 20' away from power lines?

  • Equipment turned off and keys removed when unattended?

  • Fueling of equipment detailed in approved JSA?

Mobile Elevated Work Platforms (MEWPs)

  • Is Mobile Elevated Work Platforms(MEWPs) in use?

  • Has the proper pre-use inspection and functional tests been performed and documented?

  • Does the operator have the proper training for the equipment being used?

  • Is the operator using the proper harness and tie-off points? (i.e. approved engineered anchor points)

  • MEWPs being used safely? Feet on surface, not using mid rail or toe board to stand on, not leaning outside lift?

  • Do MEWPs have proper travel alarms or indicators?

  • MEWPs path is clear and free of clutter, holes, etc.?

  • MEWPs operational area is level?

  • Is the chain or gate closed on MEWPs?

  • Is the equipment operated more than 20' away from power lines?

  • Are the materials being carried or stored on MEWP within the confinement of the platform?

  • Barricades or spotters in place when needed?

Electrical Safety.

  • Electrical tools and equipment left in a safe state if unattended?

  • Temporary power provided and inspected by Qualified Person?

  • Extension/ power cords routed to avoid creating a trip hazard?

  • Are cords in good condition, no cuts or repairs?

  • Is there a 3ft clear distance around electrical panel?

  • Are GFCI's being used and closest to the power source?

  • All electrical tools are double Insulated or third-prong grounded?

  • Extension cords not daisy chained?

Control of Hazardous Energy/ LOTO

  • Are sources of hazardous energy locked and tagged out?

  • All employees involved in LOTO are properly trained in hazardous energy control?

  • Employees exposed to hazardous energy each have their own tag and lock and with separate key on energy control points?

  • LOTO permit or plan implemented to document control of hazardous energy?

  • CD&A Superintendent participating in LOTO with locks and tags at energy control points?

  • Are tags legible with name, company and contact information listed?

  • Has all residual or potential energy been released or secured?

Hazard Communication/ GHS

  • Are SDSs submitted and reviewed in PIMS?

  • Are paper copy of SDSs available for review onsite?

  • Are all chemicals properly labeled and stored?

  • Chemical quantities onsite acceptable?

  • Chemicals stored in secondary containment?

  • Are personnel trained in the chemicals they are handling?

  • Spill kit stocked and present?

Environmental/ Waste Stream

  • Have all proper barricades been put in place to minimize cross contamination?

  • Is the waste handling and disposal of hazardous waste being executed properly?

  • Is secondary containment in place where needed?

  • Are storm sewers and drains protected?

  • Contaminated areas identified and assessed?

  • Residual waste properly labeled and stored?

Corrective actions and supplemental comments.

  • Safety and health observations were reviewed in the field with appropriate contractors when possible?

  • General Comments

Stakeholders

  • Project Superintendent

  • Project Superintendent Optional Comments:

  • Auditor

  • Auditor Optional Comments:

Approval

  • Date and time of approval

  • Approver's signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.