Information
-
Document No.
-
Audit Title
-
Project Name
-
NPDES Tracking Number
-
Date of Inspection
-
Location
-
Current Weather Condition
-
Site Activities
-
Type of Inspection
- Weekly
- Post-Storm
- Storm Event
- Pre-Storm
-
Amount of precipitation, duration
-
I certify this inspection is accurate to the best of my knowledge and completed as required per the permit.
-
I certify the necessary maintenance was completed relative to this inspection and that the project is in compliance with the permit.
Inspection Checklist
-
Is the inspector a qualified person in accordance with Part 4.1.1?
-
Are you conducting a site inspection in accordance with one of the two schedules listed in Part 4.1.2.1 and 4.1.2.2?
-
Is there a properly maintained rain gauge on your site or the equivalent of on Part 4.1.2.2?
-
All earth disturbing areas have perimeter controls?
-
Sediment track-out on streets, paved areas, and sidewalks from vehicle exiting is minimized according to Part 2.1.2.3?
-
Stockpiles located outside natural buffers protected from stormwater in accordance with Part 2.1.2.4?
-
Is dust minimized in accordance with 2.1.2.5?
-
Has the disturbance of steep slopes been minimized in accordance with Part 2.1.2.6?
-
Are discharge points and receiving waters free of any sediment deposits?
-
Are any of the following being generated at the site; concrete wash water, waste water paint clean out, oils, fuels, soaps, solvents, detergents, or other toxic substances prohibited in Part 2.3.1 and are the materials being properly maintained?
-
All pollution prevention controls installed in accordance with Part 2.3.2 are in effective operating condition?
-
If fueling and/or maintaining equipment or vehicles at the site, are effective means of eliminating the discharges of spilled or leaked chemicals being utilized in accordance with Part 2.3.3.1?
-
Are vehicle and equipment fueling, cleaning, and maintenance areas free of spills, leaks, or any other deleterious materials?
-
All storage of products, materials, or wastes are in accordance with the specifications in Part 2.3.3.3?
-
Is trash/litter from work areas collected and placed in respective material dumpsters?
-
Are washout facilities available, clearly marked, and maintained?
-
No signs of visible erosion and sedimentation on or adjacent to the project?
-
Have you inspected all areas that have been cleared, graded, or excavated and that have not yet completed stabilization consistent with Part 2.2?
-
Have you inspected all stormwater controls including pollution prevention measures?
-
Have you inspected all material, waste, borrow, or equipment storage and maintenance areas?
-
Have you inspected all areas where stormwater flows within the site?
-
Have you inspected all points of discharge?
-
Have you inspected all locations where stabilization measures have been implemented?
-
If you must declare a portion of the site unsafe to inspect, describe the reasoning.
Mile 65 - 66
-
Are all perimeter controls, tracking controls, and other erosion/sediment controls working properly?
-
Actions Taken, Date, Initials
Mile 66 - 67
-
Are all perimeter controls, tracking controls, and other erosion/sediment controls working properly?
-
Actions Taken, Date, Initials
Mile 67 - 68
-
Are all perimeter controls, tracking controls, and other erosion/sediment controls working properly?
-
Actions Taken, Date, Initials
Mile 68 - 69
-
Are all perimeter controls, tracking controls, and other erosion/sediment controls working properly?
-
Actions Taken, Date, Initials
Mile 69 - 70
-
Are all perimeter controls, tracking controls, and other erosion/sediment controls working properly?
-
Actions Taken, Date, Initials
Mile 70 - 71
-
Are all perimeter controls, tracking controls, and other erosion/sediment controls working properly?
-
Actions Taken, Date, Initials
Mile 71 - 72
-
Are all perimeter controls, tracking controls, and other erosion/sediment controls working properly?
-
Actions Taken, Date, Initials
Mile 72 - 73
-
Are all perimeter controls, tracking controls, and other erosion/sediment controls working properly?
-
Actions Taken, Date, Initials
Mile 73 - 74
-
Are all perimeter controls, tracking controls, and other erosion/sediment controls working properly?
-
Actions Taken, Date, Initials
Mile 74 - 75
-
Are all perimeter controls, tracking controls, and other erosion/sediment controls working properly?
-
Actions Taken, Date, Initials
Mile 75 - 76
-
Are all perimeter controls, tracking controls, and other erosion/sediment controls working properly?
-
Actions Taken, Date, Initials
Mile 76 - 77
-
Are all perimeter controls, tracking controls, and other erosion/sediment controls working properly?
-
Actions Taken, Date, Initials
Mile 77 - 78
-
Are all perimeter controls, tracking controls, and other erosion/sediment controls working properly?
-
Actions Taken, Date, Initials
Mile 78 - 79
-
Are all perimeter controls, tracking controls, and other erosion/sediment controls working properly?
-
Actions Taken, Date, Initials
Mile 79 - 80
-
Are all perimeter controls, tracking controls, and other erosion/sediment controls working properly?
-
Actions Taken, Date, Initials
Mile 80 - 81
-
Are all perimeter controls, tracking controls, and other erosion/sediment controls working properly?
-
Actions Taken, Date, Initials
Mile 81 - 82
-
Are all perimeter controls, tracking controls, and other erosion/sediment controls working properly?
-
Actions Taken, Date, Initials
Mile 82 - 83
-
Are all perimeter controls, tracking controls, and other erosion/sediment controls working properly?
-
Actions Taken, Date, Initials
Mile 83 - 84
-
Are all perimeter controls, tracking controls, and other erosion/sediment controls working properly?
-
Actions Taken, Date, Initials
Other
-
Are there any other concerns or non-compliant observations on site at this time? (No = Maintenance Needed)
-
Actions Taken, Date, Initials
Other
-
Are there any other concerns or non-compliant observations on site at this time? (No = Maintenance Needed)
-
Actions Taken, Date, Initials