Information
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Safety plans and records
-
Haz-Com and SDS sheets available?
-
Fall protection plan?
-
Steel erection safety plan?
-
First-aid kit available?
-
Weekly toolbox training?
P.P.E.
-
Hard hats worn at all times?
-
Proper work boots and gloves as needed?
-
Safety glasses?
-
Hi-visibility vests or clothing?
-
Respirators, dust masks and ear plugs as needed?
Fall Protection
-
Harness and lanyards in satisfactory condition?
-
Personnel trained in proper fall protection procedures?
-
Anchorage points acceptable?
-
Guard rails and cables installed correctly?
-
Holes covered and marked
-
Fall protection 100% above 6 ft?
Welding and cutting
-
Hood, goggles and shields being worn?
-
Leads with tape within 10' of stinger?
-
No exposed copper on leads and electrode holders fully insulated?
-
Oxygen & acetylene bottles upright and secured?
-
Oxygen and acetylene bottles 20 ft apart or 1 hour rated fire wall?
-
Fire extinguishers readily accessible?
-
Are GC hot work requirements being followed?
Equipment
-
Do operators have proof of training?
-
Equipment operating properly and inspected?
-
Seat-belts on fork lifts?
-
Maintenance needs are communicated?
-
Back up alarms plugged in, working, and audible?
-
Lifts being operated properly?
-
Fall protection being used as needed?
Cranes
-
All inspections up to date?
-
Operator manual and load charts on crane?
-
Swing radius barricaded?
-
Boom angle indicator and anti two block working?
-
Fire extinguishers charged and available?
Steel Erection
-
Site specific erection plan completed?
-
Rigging inspected prior to use and is in good condition?
-
Overhead hazards identified and controlled?
-
Tag lines used as appropriate?
Precast Concrete
-
Pinch points identified for setting precast?
-
Silica plan followed while drilling or cutting into precast members?
Ladders
-
Extension ladders 3 ft past landing and secured?
-
Ladders are in good condition?
-
Maintain 3 points of contact when using ladders?
Electrical
-
Extension cords in good condition?
-
GFCI are used and inspected daily?
-
Quarterly color code inspection completed?
Silica
-
Silica plan is being followed?
-
Are workers trained for site specific silica hazards?
-
Dust controls are used and effective?
Other
-
Items not covered in audit?
-
Inspector name