Title Page

  • Community

  • Lot Number(s)

  • Conducted on

  • Prepared by

Untitled Page

Exterior Check

  • Verify the exterior looks like the plans

  • Elevation matches

  • Roof returns

  • Roof overhangs

  • Eyebrows

  • Crickets (are they the correct size to move water from corners)

  • Proper fire blocking installed

  • Columns properly boxed and centered on beam above (where applicable)

  • Fascia returns level

  • Proper nailing pattern on exterior sheathing

  • Safety roof hook installed on rear

  • Safety rails and window barricades where applicable

  • Is lot clean and free of debris. Excess material stacked and ready for pick up

  • Crane holes in gables sealed

  • All form boards removed from slab

  • Check foundation for honeycomb or bolts showing

  • Mark address and lot number on front of unit

Interior Check

  • Verify full selection sheet(Fireplace, alt kitchens, alt bathrooms, covered porch, etc)

  • Verify all window and exterior doors are framed correctly. Header heights, center lines

  • Mark hinge side and door sizes

  • Mark window size

  • Mark hinge side and door sizes

  • Mark window sizes

  • Lay out all cabinet locations. Verify center lines, return walls, plumbing drops, filler spacing.

  • Room dimensions line up with plans

  • Confirm tub/shower openings as whether they get drywall or casing

  • Mark all cased openings as whether they get drywall or casing

  • Install safety rail along stairs and any open wall above stairs. Proper blocking for final handrail

  • Check for bowed studs. Use 5ft level at minimum

  • Deadwood installed as needed (tubs, cabinets, corners)

  • Fire blocking installed, include chases

  • Mark concealed space locations for T-Ply

  • Label rooms on floor

  • Subfloor seams are smooth/level

  • Verify subfloor is properly glued/secure

  • Repair floor squeaks NOW

  • Check for slab finishes (no aggregate showing, pitting, saw cuts, control joints, excessive cracking)

  • Mark options on walls and floors (TV, additional lights, etc)

  • Attic access opening in the correct location

  • Attic HVAC platform installed properly with safety rails

  • Proper blocking for tankless water heater when applicable at attic or garage

  • Island conduit not broken or filled with concrete

Structural Check

  • Correct header material and size used

  • Proper engineered beam placement

  • Proper nail/bolt patterns used

  • Correct number of king and jack studs used

  • Bolt bottom plate breaks and interior load bearing walls

  • Correct hangers and plats used

  • Proper strapping installed where applicable

  • Point loads carry from roof to foundation (squash blocks in floor system)

  • Proper roof truss bracing and layout

  • Proper floor truss bracing and layout

  • Confirm everything is done according to the plan details

Cleanliness Check

  • Is the home clean and ready for the next person

Signature

  • Superintendent Signature

  • Date completed

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.