Exterior Check
-
Verify the exterior looks like the plans
-
Elevation matches
-
Roof returns
-
Roof overhangs
-
Eyebrows
-
Crickets (are they the correct size to move water from corners)
-
Proper fire blocking installed
-
Columns properly boxed and centered on beam above (where applicable)
-
Fascia returns level
-
Proper nailing pattern on exterior sheathing
-
Safety roof hook installed on rear
-
Safety rails and window barricades where applicable
-
Is lot clean and free of debris. Excess material stacked and ready for pick up
-
Crane holes in gables sealed
-
All form boards removed from slab
-
Check foundation for honeycomb or bolts showing
-
Mark address and lot number on front of unit
Interior Check
-
Verify full selection sheet(Fireplace, alt kitchens, alt bathrooms, covered porch, etc)
-
Verify all window and exterior doors are framed correctly. Header heights, center lines
-
Mark hinge side and door sizes
-
Mark window size
-
Mark hinge side and door sizes
-
Mark window sizes
-
Lay out all cabinet locations. Verify center lines, return walls, plumbing drops, filler spacing.
-
Room dimensions line up with plans
-
Confirm tub/shower openings as whether they get drywall or casing
-
Mark all cased openings as whether they get drywall or casing
-
Install safety rail along stairs and any open wall above stairs. Proper blocking for final handrail
-
Check for bowed studs. Use 5ft level at minimum
-
Deadwood installed as needed (tubs, cabinets, corners)
-
Fire blocking installed, include chases
-
Mark concealed space locations for T-Ply
-
Label rooms on floor
-
Subfloor seams are smooth/level
-
Verify subfloor is properly glued/secure
-
Repair floor squeaks NOW
-
Check for slab finishes (no aggregate showing, pitting, saw cuts, control joints, excessive cracking)
-
Mark options on walls and floors (TV, additional lights, etc)
-
Attic access opening in the correct location
-
Attic HVAC platform installed properly with safety rails
-
Proper blocking for tankless water heater when applicable at attic or garage
-
Island conduit not broken or filled with concrete
Structural Check
-
Correct header material and size used
-
Proper engineered beam placement
-
Proper nail/bolt patterns used
-
Correct number of king and jack studs used
-
Bolt bottom plate breaks and interior load bearing walls
-
Correct hangers and plats used
-
Proper strapping installed where applicable
-
Point loads carry from roof to foundation (squash blocks in floor system)
-
Proper roof truss bracing and layout
-
Proper floor truss bracing and layout
-
Confirm everything is done according to the plan details
Cleanliness Check
-
Is the home clean and ready for the next person