Title Page
-
Community
-
Lot Number(s)
-
Conducted on
-
Prepared by
Quality Checklist
Framing
-
All interior door sizes and swings are marked and measured
-
All strapping and hardware is in place per engineers plan
-
Confirm all header sizes match engineer plan
-
All frame work and punch are completed
-
Doors have temporary construction locks installed
-
Weather stripping is in place at exterior doors
-
Verify tempered window locations
-
Verify drywall unit is located in accessible location (front of house ideal)
-
Safety rails are in place at stairs
-
All municipal inspections are completed or scheduled
-
All chases have fire blocking in place and edges sealed
-
Caulk, seal, foam, has been completed
Mechanical
-
Plumbing, HVAC, gas, low voltage rough are completed
-
Pest tubes are installed and properly terminated on exterior
-
Confirm selections/upgrades that may contain any mechanical options
-
Confirm HVAC supplies and returns match manual J
-
Jumper ducts in place at bedrooms
-
T stat wires are in place and have blocking. Spray location on floor
-
HVAC line set is strapped to framing in wall and penetration sealed
-
Condensate line in place and penetration sealed
-
Secondary condensate line located over a window
-
Mending plate at top of wall both floors at HVAC line set has tape
-
All bath fans in place, duct taped to housing with ANSI tape, terminated to exterior
-
Dryer duct in place. Box dropped to floor. Length < 35ft (45s are 2.5ft and 90s are 5ft)
-
Tubs/shower pans are set in concrete
-
Water lines in exterior walls, attic, or insulated floors have insulation around pipes
-
Nail guards in place where all water/drain lines pass through wall top/bottom plates
-
Washing machine box in place and secured to framing
-
Hose bibs in place and blocked
-
Low volt box has electrical whip
-
Confirm low volt locations match plan and all drops accounted for
-
Confirm electrical plans match rough in
-
No switches behind doors
Exterior
-
All mechanical penetrations are foamed
-
All plumbing boots are in place. Stacks painted black
-
Roofing free of torn shingles or any defects
-
All house wrap in place, taped, secure
-
All windows and doors are taped
-
Any damaged window glass has been ordered with supplier
-
All extra framing material has been disposed or returned
-
Exterior finishes are written on house wrap (stone, siding, brick, etc.)
-
Confirm all elevations match plan
-
Jobsite is clean and ready for siding install
Signature
-
Superintendent
-
Date