Title Page
-
Document No.
-
Audit Title
-
Conducted on
-
Prepared by
-
Personnel
Checklist
-
Check that no holes or notches are cut into the TGI’s after PME
-
Make sure all doors do not swing over switches
-
Confirm termite spray
-
Check for OSB in all chase tops and that they are sealed
-
Install tub studs at all showers and tub edges
-
Check all plumbing/mechanical/electrical penetrations
-
Ensure that T ply and insulation is installed behind tubs, showers, and any exterior wall area not accessible
-
Check the toilet locations center of wall closet 15 1/2 inches off of wall 15 inches off of the cabinet and tub
-
Check HVAC duct for kinks
-
Confirm utility meters are stubbed out minimum 3 feet apart
-
Make sure all holes are sealed to exterior, both roof and sheathing
-
Confirm office has scheduled all undergrounds
-
Confirm PME inspections passed
-
Check all joists for damage
-
Place all updated cut sheets and options in windows
-
Transition grills properly installed
-
Vents are not in the way of crown details
-
Check for nail plates
-
Make sure light fixtures on the stairs and hallways or 6’8” minimum
-
Make sure outlets are with in 12 feet of each other, 2 feet from counter brakes
-
Confirmed that all walls drilled more than 40% and non-load bearing walls 60% or more are supported
-
Confirm outlets are dropped in shadowbox areas
-
Check stair switches for clearance from rail
-
Confirm nose studs are twisted or bowed (especially at electrical boxes)
-
Photos
-
Notes
-
SDH Builder/Employee