Foundation Checklist
Grading and Erosion Control
-
Post lot sign and permit board. Paint property lines on curb
-
Is the building pad level?
-
Are the swales cut in and is the drainage in compliance with the HLP?
-
Is the C.O. Pad and garage on the high side of the lot?
-
Is the silt fence and C.O. Installed per the county and EPD requirements?
-
Is a compaction letter required? If the lot elevation has been changed in excess of 2' a new compaction letter is required.
-
Are there any obstructions with regard to driveway?
Foundation Box
-
Check the box dimensions and square
-
Confirm the garage side
-
Mark the form boards for any brick ledge
-
Confirm the patio locations and size. The front patio needs to be offset 4" to accommodate the columns
-
Have the forms checked by the surveying company to ensure the location of the home is in accordance with the HLP
-
Is the box within the setback and or property lines
Slab Plumbing
-
Check for 1/8" per foot fall on all drain lines. Make sure drain lines are bedded in ground and partial covered with dirt.
-
Check for leaks-look for wet dirt
-
Ensure PVC sleeve is installed at main drain as it exits slab
-
Check that pipes are secured to metal stakes and are located in the proper locations
-
Make sure there are no splices in the supply lines
-
Make sure the island conduit is installed in the correct location if it is required
-
Confirm the locations of all pipes, i.e. kitchen, bath, and water heater
Slab Prep
-
Footing dug square and free of debris and loose dirt. Rebar must be centered in footing and placed on chairs
-
Grade beams in rebar installed per plan/details
-
Turn up rebar ground in outside garage wall near electrical meter base location
-
Vapor barrier installed and wall straps/bolts on-site for insulation during concrete pour
-
Ensure form boards are straight and properly braced
-
Double check slab dimensions, square, and patio dimensions and locations
-
Ensure slab is minimum 4" thick at all points
-
Check for positive slope 3" in 20' on garage
-
Visual Failures
-
Notes
-