Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
Inspection Report
Claim Details
-
Claim Number :-
-
Our Reference :-
-
Situation Address :-
-
Insured's Name :-
-
Insured's Phone Number :-
-
Insured's Email Address :-
Inspection Details
-
Process Letter Supplied :-
- Yes
- No
- N/A
-
Date Inspected :-
-
Time Inspected :-
-
Tenant Details If Applicable :-
-
Real Estate Details If Applicable :-
-
Internal Assessor Required :-
- Yes
- No
- N/A
-
Name Of Assessor If Required :-
-
SES Attended :-
- Yes
- No
-
Fire Brigade Attended :-
- Yes
- No
-
Police Event Number If Applicable :-
-
Overall Condition Acceptable :-
- Yes
- No
-
Risk Assessment Required :-
- Yes
- No
-
Incident Confirmed :-
-
Sum Adequate :-
-
Insured Willing To Proceed :-
- Yes
- No
Property Details
-
Building Type :-
- House
- Unit
- Townhouse
- Villa
- Factory
- Shop
- Other
-
Type Of Design :-
- Single Storey
- Double Storey
- Multi Storey
- Split Level
-
Construction :-
- Brick Veneer
- Fibro Cladding
- Weatherboard
- Double Brick
- Vinyl Cladding
- Metal Cladding
-
Roof :-
- Cement Tile
- Metal
- Terracotta Tile
- Tiles & Metal
- Slate
- Asbestos
- Other
-
Squares :-
-
Years :-
Assessment Details :-
-
Details / Client Discussion :-
-
Recommendation :-
- Accept
- Accept - Client seeks alternate settlement method
- Do Not Accept - Not Covered
- Do Not Accept - Requires further investigation
- Unsure - Policy Coverage
- Unsure - Unable to warrant
- Unsure - Requires causation report
- Cancel Claim - Client wishes to withdraw claim
- Cancel Claim - Under Excess
- Cancel Claim - No Resultant Damage
-
Conclusion - (Damage related to a defined event)
-
The Insured Should Be Advised By The Insurer To :-
-
Exclusion Because :-
-
Insured's Scope Of Works (Non Insurance Related Repairs)
-
Is The Insured Aware Of Any Emergency Makesafe Procedures Not Covered By The Claim :-
-
Emergency Repairs Made During Inspection Or Before Insurer Approval ;-
-
Specialist Report Required :-
-
Type Of Report If Required :-
- Plumbers Report
- Roof Report
- Engineers Report
- Building Consultants Report
- Electrical Inspection / Report
-
Flooring Letter Required :-
-
Product Letter Required :-
-
Notes :-