1.0 Documentation
-
1.1 SHEQ documented and on site?
-
1.2 Site Inductions - Completed and signed?
-
1.3 Site attendance register up to date?
-
1.4 As read form signed by staff and sub-contractors
-
1.5 Is the subcontractor register up to date?
-
1.6 Are there regular Tool Box Talks?
-
1.7 Date of last incident/injury report?
-
1.8 Are subcontractors supplying RAMS?
-
1.9 Are all RAMS entered into file. (Site specific and contractors)
-
1.10 Is there plant & equipment on site and entered into register (HS 08)
-
1.11 Are hot works permits - required, completed and checked ?
-
1.12 Are confined space/roof access permits - required, completed and checked ?
-
1.13 Are emergency procedures understood and drills conducted, date of last drill?
-
1.14 Are the mini manuals available ?
2.0 General Housekeeping
-
2.1 Entry and walkways kept clear?
-
2.2 Floor surfaces uncluttered?
-
2.3 Is the general public isolated from the work face?
-
2.4 Stairwells kept clear?
-
2.5 Exit doors clear and unobstructed?
-
2.6 Is the sufficient natural lighting?
-
2.7 Is there adequate building / temporary lighting.
-
2.8 Are emergency exit lights / signs in place?
3.0 Site Safety
-
3.1 client sign-In procedure in place?
-
3.2 Safety, warning and PPE signage displayed?
-
3.3 PPE compliance?
-
3.4 Barriers,fences,hoardings or handrails secure?
-
3.5 Floor penetrations covered or barricaded with signage displayed?
-
3.6 Manual handling aids being used?
-
3.7 Materials stacked safely?
-
3.8 Plant prestart checklists completed?
4.0 First Aid and Emergencies
-
4.1 Evacuation plan / notices displayed?
-
4.2 Emergency contact numbers, first aid signage displayed?
-
4.3 Register of First Aiders displayed next to First Aid Cabinet?
-
4.4 First Aid box available & stocked, clean and orderly and in date?
-
4.5 First Aid box accessible to workers?
-
4.6 Fire extinguishers available?
-
4.7 Signage displayed for fire hose reels or extinguishers?
-
4.8 Nurse call operational, if required?
5.0 Site Amenities
-
5.1 Fridge, microwave, kettle / boiling water, fresh drinking water supplied?
-
5.2 Adequate eating facilities ?
-
5.3 Toilets available ?
-
5.4 Areas kept clean, sufficient rubbish bins?
6.0 Equipment Safety
-
6.1 Electrical equipment tested and tagged ? (PAT)
-
6.2 Gas testing equipment calibrated ?
-
6.3 Electrical test equipment calibrated ?
-
6.4 Electrical safety signage displayed ?
7.0 Working at Heights
-
7.1 Scaffold complete with edge protection, access ladder / stairs, kick boards.<br>Handover certificate filed in Folder 2?
-
7.2 Scaffold inspected monthly and certificate filed in Folder ?
-
7.3 IPAF and/or PASMA training completed and in date
-
7.4 Portable ladders rated class 1or class EN 131 or above?
-
7.5 Safety harness in good condition and inspected ?
-
7.6Extension ladder protrudes al least 1 metre above working platform for access purposes?
8.0 Waste Removal
-
8.1 Adequate bins located at suitable points ?
-
8.2 Provision for designated rubbish areas if required. Barricaded with signage?
-
8.3 Waste documentation available ?
-
8.4 Waste segregated for disposal ?
-
8.5 Rubbish removed from site regularly?
9.0 Environmental
-
9.1 Noise levels
-
9.2 Dust levels / air quality
-
9.3 Pedestrian / traffic management
-
9.4 Bunding available or in place