Title Page
-
Site Name
-
Job / Document No.
-
Conducted on
-
Completed by
-
Discipline
-
Additional Information If Required:
Hot Work Permit
-
Please see attached guidance before completing.
Hot Work Permit Job Details This permit to work is issued for the following work as detailed in sections 1 - 7 below. No work other than that detailed must be carried out
-
1. Description of Hot Work Permit
-
2. Duration of permit (in hours and minutes)
-
4. Is the work to be carried out when plant, equipment or systems are in operation?
-
5. Extra precautions to be taken if plant, machinery or systems are in operation
-
6. Distance from zoned areas (N.B. No hot work is to take place in zoned areas) Please review site DSEAR risk assessment where possible
-
7. Method of isolation/making safe
Precautions
-
Ensure hot work equipment is suitable for use and in good order
-
Ensure location and means of raising alarm
-
Inspect nearby areas
-
Remove any flammable liquids/gas containers from the work area (full or empty
-
Check location and means of raising alarm
-
Ensure location extinguishers/hose reels etc..
-
Remove any combustible materials from work area
-
Provide suitable and adequate protections against sparks and hot particles
ISSUE (City FM): I hereby declare that no work other than that stated above will be carried out, and all precautionary measures will be adhered to:
-
Signature:
-
Designation:
-
Date and time
BP Agreement that Permit Conditions are in place (Site Responsible Person)
-
Name and signature (Site Operator):
-
Designation:
-
Authorised on
-
You can proceed with your work
Fire Watch on Completion of Works
-
Fire watch/hot work area monitoring requirements:
-
Continuous fire watch provided during and for at least 1 hours after hot work, including all breaks
Cancellation of permit following fire watch (City FM)
-
Name & Signature:
-
Designation:
-
Date and time of closure
Permit Cancellation acknowledgement by BP Responsible person.
-
Name & Signature:
-
Designation:
-
Date and time of closure
-
PLEASE SEND THE COMPLETED PERMIT TO YOUR LINE MANAGER AS A PDF AND BP E -MAINTENANCE AT