Title Page
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Clients Details
-
Site address
-
Estimated date required
-
Job description
-
Urgent job
-
Owns the property & trees
- purchasing the property
- neighbours trees
- council
- neighbours permission required
-
Fences to be removed by
- Timberline
- Customer
- N/A
-
Tree type & count
-
Traffic management required
-
Job distance from road (metres)
-
Power lines/services do they need to be turned off
-
Power pole numbers
-
Does the water need to be switched off
-
Site cleanup required
-
Degree of site cleanup
-
Materials need to leave site
-
Access to site
- vehicle access
- customer/ public access
- unloading point
-
Photos of site access
Equipment required
-
Digger
- grapple
- bucket
- tree shear
-
Chipper
- 24"
- 12"
-
Chainsaw
-
Climbers
- dylan
- Matty
- Johno
-
Additional labour required
-
Mulching required
-
Subcontractors required
Health and safety
-
Minor job
-
SSSP required
-
Work safe application required 24 hours before commencing job
-
Work area description
-
Work area photos
-
Closest medical centre
-
Any hazards the customer has brought to timberline contracting attention
-
Additional PPE required
-
Add signature