Information

  • Project Name / Stage

  • Project No. :

  • Water Authority Reference:

  • Conducted on

  • Prepared by

  • Location
  • Contractor

  • Principal Contractor

  • WEATHER

  • SITE CONDITIONS

  • TRAFFIC MANAGEMENT

  • FENCING & HSE SIGNAGE

1.0 PRE-COMMENCEMENT

  • Have block pegs and TBM's been installed

  • Have drawings been been approved for construction & issued to contractor

  • Has contractor submitted TMP, PMP & CEMP to relevant authorities where required.

  • Has pre-commencement meeting occurred with contractor, Charlton Degg and relevant authorities representative on site.

  • Has the site been fenced to Developer / Authority requirements

4.0 ACTIVITY : WATER

  • Water Retic Status

  • Start Date :

  • Completion Date :

4.1 Works - Trenching, Pipelaying, Backfill, Surface Fittings

  • Does the water contractor have latest revision construction issue drawings

  • Are materials as specified and stored correctly on site.

  • Is there an accredited pipe layer on site.

  • Are trench widths adequate for pipe size/ type

  • Is the bedding material & thickness within tolerance and being compacted correctly

  • Are pipes being installed in accordance with design specification and manufacturers recomendations.

  • Are clearances to other services being maintained as per specification.

  • Does trench backfill material comply with standard drawings and specifications

  • Are lids / covers as per design and set correctly.

  • Are thrust restraints being installed as per design where required.

4.2 Safety - Trenching, Pipelaying, Backfill, Surface Fittings

  • Does the contractor have utilities / services plans on site.

  • Does plant and equipment have suitable warning lights and reversing beepers

  • Is ground support suitable for the ground conditions and depth of excavation

  • Are workers provided with a ladder or other means of access and egress where required.

  • Are hats and vests being worn by workers where required

  • Are trenches barricaded and made safe when left open.

  • Is lifting equipment suitable for the works being carried out.

COMMENTS / PROGRESS / INSTRUCTIONS.

  • COMMENTS

  • PHOTOS

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.