Information
-
Project Name / Stage
-
Project No. :
-
Water Authority Reference:
-
Conducted on
-
Prepared by
-
Location
-
Contractor
-
Principal Contractor
-
WEATHER
-
SITE CONDITIONS
-
TRAFFIC MANAGEMENT
-
FENCING & HSE SIGNAGE
1.0 PRE-COMMENCEMENT
-
Have block pegs and TBM's been installed
-
Have drawings been been approved for construction & issued to contractor
-
Has contractor submitted TMP, PMP & CEMP to relevant authorities where required.
-
Has pre-commencement meeting occurred with contractor, Charlton Degg and relevant authorities representative on site.
-
Has the site been fenced to Developer / Authority requirements
4.0 ACTIVITY : WATER
-
Water Retic Status
- NONE
- COMMENCED
- PROGRESSING
- ON HOLD
- COMPLETED
-
Start Date :
-
Completion Date :
4.1 Works - Trenching, Pipelaying, Backfill, Surface Fittings
-
Does the water contractor have latest revision construction issue drawings
-
Are materials as specified and stored correctly on site.
-
Is there an accredited pipe layer on site.
-
Are trench widths adequate for pipe size/ type
-
Is the bedding material & thickness within tolerance and being compacted correctly
-
Are pipes being installed in accordance with design specification and manufacturers recomendations.
-
Are clearances to other services being maintained as per specification.
-
Does trench backfill material comply with standard drawings and specifications
-
Are lids / covers as per design and set correctly.
-
Are thrust restraints being installed as per design where required.
4.2 Safety - Trenching, Pipelaying, Backfill, Surface Fittings
-
Does the contractor have utilities / services plans on site.
-
Does plant and equipment have suitable warning lights and reversing beepers
-
Is ground support suitable for the ground conditions and depth of excavation
-
Are workers provided with a ladder or other means of access and egress where required.
-
Are hats and vests being worn by workers where required
-
Are trenches barricaded and made safe when left open.
-
Is lifting equipment suitable for the works being carried out.
COMMENTS / PROGRESS / INSTRUCTIONS.
-
COMMENTS
-
PHOTOS