Information
-
Project name:
-
Project Number:
-
Water Authority Reference:
-
Conducted on:
-
Auditor:
-
Contractor:
-
Principal Contractor:
-
Location
-
WORKS STATUS
-
WEATHER
-
SITE CONDITIONS
-
TRAFFIC MANAGEMENT
-
FENCING & HSE SIGNAGE
Safety/Environmental - Earthworks, Excavation, Environmental protection
-
Do stockpiles have adequate silt runoff protection.
-
Add media
-
Are environmental No Go/Tree protection zones fenced where required.
-
Add media
-
Are silt traps in place to prevent silt build up in previously installed drainage system.
-
Add media
-
Does the contractor have utilities / services plans on site.
-
Does plant and equipment have suitable warning lights and reversing beepers
-
Are personnel in the vicinity of operating plant wearing high vis clothing and helmets where required.
-
Are there provisions to minimize dust / mud from leaving the site.
-
Add media
Sewer Works
-
Sewer Contractor Onsite
-
Does the contractor have issued for construction drawings and the latest revision
-
Are materials stored correctly on site
-
Add media
Works - Trenching, Pipelaying, Backfill, Surface Fittings
-
Pipeline Percentage Complete
- PC
- 100
- 90
- 80
- 70
- 60
- 50
- 40
- 30
- 20
- 10
- Pre-com
-
Is there an accredited pipe layer on site.
-
Accredited Pipe layer
-
Are trench widths adequate for pipe size/ type
-
Add media
-
Are all embedment materials on Water Authority approved products list and supplied by ISO 9001 accredited suppliers?<br>
-
Add media
-
Is the bedding material & thickness within tolerance and being compacted correctly
-
Are PVC pipes within their "used by date"
-
Add media
-
Are pipes being installed in accordance with design specification and manufacturers recomendations.
-
Are horizontal and vertical clearances to other services being maintained as per specification.
-
Add media
-
Does trench backfill material comply with standard drawings and specifications
Safety - Trenching, Pipelaying, Backfill
-
Does the contractor have utilities / services plans on site.
-
Does plant and equipment have suitable warning lights and reversing beepers
-
Is ground support suitable for the ground conditions and depth of excavation
-
Add media
-
Are workers provided with a ladder or other means of access where required.
-
Add media
-
Are hats and vests being worn by workers where required
-
Are trenches barricaded/protected and made safe when left open.
-
Add media
-
Is lifting equipment suitable for the works being carried out.
Maintenance Structures - MH, MS, IS, TMS
-
Have manhole covers been orientated to ensure 1m clearance is achieved from proposed fences/obstructions?
-
Add media
-
Are lids / covers as per design and set correctly.
-
Are Maintenance Structures being constructed in accordance with standard drawings?
-
Has concrete been supplied from an ISO 9001 accredited plant, and grade as specified?<br>
-
Add media
-
Are base details constructed in accordance with Standard drawings and/or base detail provided?<br>
-
Add media
Comments/ Progress/ Instructions
-
Sketch of Work Area (Optional)
-
Comments
-
Photos
-
Prepared by