Information

  • Project name:

  • Project Number:

  • Water Authority Reference:

  • Conducted on:

  • Auditor:

  • Contractor:

  • Principal Contractor:

  • Location
  • WORKS STATUS

  • WEATHER

  • SITE CONDITIONS

  • TRAFFIC MANAGEMENT

  • FENCING & HSE SIGNAGE

Safety/Environmental - Earthworks, Excavation, Environmental protection

  • Do stockpiles have adequate silt runoff protection.

  • Add media

  • Are environmental No Go/Tree protection zones fenced where required.

  • Add media

  • Are silt traps in place to prevent silt build up in previously installed drainage system.

  • Add media

  • Does the contractor have utilities / services plans on site.

  • Does plant and equipment have suitable warning lights and reversing beepers

  • Are personnel in the vicinity of operating plant wearing high vis clothing and helmets where required.

  • Are there provisions to minimize dust / mud from leaving the site.

  • Add media

Sewer Works

  • Sewer Contractor Onsite

  • Does the contractor have issued for construction drawings and the latest revision

  • Are materials stored correctly on site

  • Add media

Works - Trenching, Pipelaying, Backfill, Surface Fittings

  • Pipeline Percentage Complete

  • Is there an accredited pipe layer on site.

  • Accredited Pipe layer

  • Are trench widths adequate for pipe size/ type

  • Add media

  • Are all embedment materials on Water Authority approved products list and supplied by ISO 9001 accredited suppliers?<br>

  • Add media

  • Is the bedding material & thickness within tolerance and being compacted correctly

  • Are PVC pipes within their "used by date"

  • Add media

  • Are pipes being installed in accordance with design specification and manufacturers recomendations.

  • Are horizontal and vertical clearances to other services being maintained as per specification.

  • Add media

  • Does trench backfill material comply with standard drawings and specifications

Safety - Trenching, Pipelaying, Backfill

  • Does the contractor have utilities / services plans on site.

  • Does plant and equipment have suitable warning lights and reversing beepers

  • Is ground support suitable for the ground conditions and depth of excavation

  • Add media

  • Are workers provided with a ladder or other means of access where required.

  • Add media

  • Are hats and vests being worn by workers where required

  • Are trenches barricaded/protected and made safe when left open.

  • Add media

  • Is lifting equipment suitable for the works being carried out.

Maintenance Structures - MH, MS, IS, TMS

  • Have manhole covers been orientated to ensure 1m clearance is achieved from proposed fences/obstructions?

  • Add media

  • Are lids / covers as per design and set correctly.

  • Are Maintenance Structures being constructed in accordance with standard drawings?

  • Has concrete been supplied from an ISO 9001 accredited plant, and grade as specified?<br>

  • Add media

  • Are base details constructed in accordance with Standard drawings and/or base detail provided?<br>

  • Add media

Comments/ Progress/ Instructions

  • Sketch of Work Area (Optional)

  • Comments

  • Photos

  • Prepared by

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.