Information

  • Audit Title

  • Document No.

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

OHS and Systems (policy/procedures,aims,commitment,etc.)

  • On site copies of the Health and Safety Policy / Procedures including defined responsibilities.

  • Corrective actions required:

  • The above listed corrective actions much be completed by the contractor, no later than:v

Safe Work Practices and Procedures (relevant to the contract)

  • Onsite copies of the SWMS and relevant work instructions /procedures

  • Corrective actions required:

  • The above listed corrective actions much be completed by the contractor, no later than:

Incident Reporting and Investigation.

  • Onside copy of a accident/incident form / book .<br>Onsite of a Hazard reporting book.

  • Corrective actions required:

  • The above listed corrective actions much be completed by the contractor, no later than:

Induction and safety training.

  • Records of training relevant to the scope of the work being completed (e.g. Plant training and licences, manual handling, chemical, electrical etc)<br>Onsite records in relation to site induction for employees and sub contractors.

  • Corrective actions required:

  • The above listed corrective actions much be completed by the contractor, no later than:

Health and Safety Inspections.

  • Onsite copy of a checklist that is used for completing workplace inspections.

  • Corrective actions required:

  • The above listed corrective actions much be completed by the contractor, no later than:

Health and Safety Consultation.

  • Copy of tool box meeting minutes, diary notes of consultation activities, reviews to SWMS with sign-off by contractors employees.

  • Corrective actions required:

  • The above listed corrective actions much be completed by the contractor, no later than:

Plant - Equipment and Workplace Inspections.

  • Are daily plant operation checklists recorded. <br>Are maintenance records available for the equipment being used.<br>All plant attachments serviced / maintained in accordance manufactures requirements.<br>Has an operational hazard ID & assessment been completed for the specific plant?

  • Corrective actions required:

  • The above listed corrective actions much be completed by the contractor, no later than:

Working under, over or next to power supply assets.

  • If relevant, has the SWMS identified this hazard.<br>Has The Regulator (Energy Safe) been notified of the works.<br>Are all persons appropriately trained and are "spotters" being used.

  • Corrective actions required:

  • The above listed corrective actions much be completed by the contractor, no later than:

Traffic Management (as per AS 1742.3)

  • If mobile plant is being used (e.g. Excavators, Elevated Work Platforms, Trucks, Deliveries) has a traffic management plan been developed, and is it reviewed daily when there is a change or if the is a near/incident?

  • Corrective actions required:

  • The above listed corrective actions much be completed by the contractor, no later than:

Plant - Operator licences and competencies.

  • Do all operators of mobile plant hold a current and appropriate license?

  • Corrective actions required:

  • The above listed corrective actions much be completed by the contractor, no later than:

Systems of work

  • If chemicals are being used, has a safe system of work been identified in the SWMS?<br>Are the controls on the SWMS being implemented on the worksite?

  • Corrective actions required:

  • The above listed corrective actions much be completed by the contractor, no later than:

Documentation

  • Are current MSDS available for all chemicals that are on the worksite?

  • Corrective actions required:

  • The above listed corrective actions much be completed by the contractor, no later than:

Chemical storage.

  • Are all chemicals stored appropriately, and not decanted into unlabeled containers?

  • Corrective actions required:

  • The above listed corrective actions much be completed by the contractor, no later than:

Manual Handling systems.

  • Has the contractor identified Manual Handling in their SWMS?<br>Are there controls being implemented on the worksite?

  • Corrective actions required:

  • The above listed corrective actions much be completed by the contractor, no later than:

Signage/Security systems.

  • Are warning signs in place? E.g. Road and footpath.<br>Is the site adequately signed/fenced to prevent uncontrolled public access?<br>Can the site be adequately controlled after hours?

  • Corrective actions required:

  • The above listed corrective actions much be completed by the contractor, no later than:

Public Pedestrian surfaces (including temporary surfaces).

  • Re all public pedestrian surfaces (footpaths, roads etc) free from debris, work activities, stored materials, vehicles etc?

  • Corrective actions required:

  • The above listed corrective actions much be completed by the contractor, no later than:

Other Hazards.

  • Is lighting suitable for night time public access?<br>Is safe pedestrian to shops and residence maintained?<br>Have appropriate notices advising of works been distributed to effected traders/residence?

  • Corrective actions required:

  • The above listed corrective actions much be completed by the contractor, no later than:

Systems of Work.

  • If electrical equipment is being used, has a safe system of work been established within the SWMS?<br>Are the controls on the SWMS being implemented on the worksite?

  • Corrective actions required:

  • The above listed corrective actions much be completed by the contractor, no later than:

Test / Tag (as per AS 3012).

  • Have all electrical items ( power tools, extension cords, generators etc) been tested and tagged, and is the test up to date?

  • Corrective actions required:

  • The above listed corrective actions much be completed by the contractor, no later than:

Working at Height - (fall from one level to another).

  • Is there temporary railings in place.<br>Has an Elevating platform been commissioned for the tasks.<br>Are ladders in place, secured and extend 900 mil above the access point.<br>Are safety harnesses / lanyards being used and documented in the SWMS.

  • Fragile Roofing Materials - Australian Standard steel mesh installed.

  • Corrective actions required:

  • The above listed corrective actions much be completed by the contractor, no later than:

Cranes and Lifting Compliance.

  • Cranes and Equipment.<br>1. Suitable type and Capacity for the tasks.<br>2. Review daily crane operator checklist.<br>3. Condition and cleanliness.<br>4. Capacity, condition, storage, tagging of slings, chains, hooks, and shackles. <br>5. Stable operating surfaces and levelling blocks.<br>6. Sling selection must be completed by dogman/rigger, and inspected 3 monthly.<br>7. Where edges of loads are not protected, packing material must bemused and any corner has a radius of less then 3 times the compressed thickness of the soft sling, packing will be required.<br>8. All lifting activities must be documented onSWMS for high risk work.<br>6. Overhead power lines <br>7. Loads never lifted or suspended over workers and or public.<br><br>

  • Corrective actions required:

  • The above listed corrective actions much be completed by the contractor, no later than:

Contractor Sign Off Requirements

  • I acknowledge and agree with all items detailed on this audit report. I agree to ensure that all employees and subcontractors engaged will fully comply with the control measures indicted.

City of Greater Geelong sign off

  • A representative from the City of Greater Geelong acknowledges that all of the listed corrective actions have been completed

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.