Information
-
Audit Title
-
Document No.
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
OHS and Systems (policy/procedures,aims,commitment,etc.)
-
On site copies of the Health and Safety Policy / Procedures including defined responsibilities.
-
Corrective actions required:
-
The above listed corrective actions much be completed by the contractor, no later than:v
Safe Work Practices and Procedures (relevant to the contract)
-
Onsite copies of the SWMS and relevant work instructions /procedures
-
Corrective actions required:
-
The above listed corrective actions much be completed by the contractor, no later than:
Incident Reporting and Investigation.
-
Onside copy of a accident/incident form / book .<br>Onsite of a Hazard reporting book.
-
Corrective actions required:
-
The above listed corrective actions much be completed by the contractor, no later than:
Induction and safety training.
-
Records of training relevant to the scope of the work being completed (e.g. Plant training and licences, manual handling, chemical, electrical etc)<br>Onsite records in relation to site induction for employees and sub contractors.
-
Corrective actions required:
-
The above listed corrective actions much be completed by the contractor, no later than:
Health and Safety Inspections.
-
Onsite copy of a checklist that is used for completing workplace inspections.
-
Corrective actions required:
-
The above listed corrective actions much be completed by the contractor, no later than:
Health and Safety Consultation.
-
Copy of tool box meeting minutes, diary notes of consultation activities, reviews to SWMS with sign-off by contractors employees.
-
Corrective actions required:
-
The above listed corrective actions much be completed by the contractor, no later than:
Plant - Equipment and Workplace Inspections.
-
Are daily plant operation checklists recorded. <br>Are maintenance records available for the equipment being used.<br>All plant attachments serviced / maintained in accordance manufactures requirements.<br>Has an operational hazard ID & assessment been completed for the specific plant?
-
Corrective actions required:
-
The above listed corrective actions much be completed by the contractor, no later than:
Working under, over or next to power supply assets.
-
If relevant, has the SWMS identified this hazard.<br>Has The Regulator (Energy Safe) been notified of the works.<br>Are all persons appropriately trained and are "spotters" being used.
-
Corrective actions required:
-
The above listed corrective actions much be completed by the contractor, no later than:
Traffic Management (as per AS 1742.3)
-
If mobile plant is being used (e.g. Excavators, Elevated Work Platforms, Trucks, Deliveries) has a traffic management plan been developed, and is it reviewed daily when there is a change or if the is a near/incident?
-
Corrective actions required:
-
The above listed corrective actions much be completed by the contractor, no later than:
Plant - Operator licences and competencies.
-
Do all operators of mobile plant hold a current and appropriate license?
-
Corrective actions required:
-
The above listed corrective actions much be completed by the contractor, no later than:
Systems of work
-
If chemicals are being used, has a safe system of work been identified in the SWMS?<br>Are the controls on the SWMS being implemented on the worksite?
-
Corrective actions required:
-
The above listed corrective actions much be completed by the contractor, no later than:
Documentation
-
Are current MSDS available for all chemicals that are on the worksite?
-
Corrective actions required:
-
The above listed corrective actions much be completed by the contractor, no later than:
Chemical storage.
-
Are all chemicals stored appropriately, and not decanted into unlabeled containers?
-
Corrective actions required:
-
The above listed corrective actions much be completed by the contractor, no later than:
Manual Handling systems.
-
Has the contractor identified Manual Handling in their SWMS?<br>Are there controls being implemented on the worksite?
-
Corrective actions required:
-
The above listed corrective actions much be completed by the contractor, no later than:
Signage/Security systems.
-
Are warning signs in place? E.g. Road and footpath.<br>Is the site adequately signed/fenced to prevent uncontrolled public access?<br>Can the site be adequately controlled after hours?
-
Corrective actions required:
-
The above listed corrective actions much be completed by the contractor, no later than:
Public Pedestrian surfaces (including temporary surfaces).
-
Re all public pedestrian surfaces (footpaths, roads etc) free from debris, work activities, stored materials, vehicles etc?
-
Corrective actions required:
-
The above listed corrective actions much be completed by the contractor, no later than:
Other Hazards.
-
Is lighting suitable for night time public access?<br>Is safe pedestrian to shops and residence maintained?<br>Have appropriate notices advising of works been distributed to effected traders/residence?
-
Corrective actions required:
-
The above listed corrective actions much be completed by the contractor, no later than:
Systems of Work.
-
If electrical equipment is being used, has a safe system of work been established within the SWMS?<br>Are the controls on the SWMS being implemented on the worksite?
-
Corrective actions required:
-
The above listed corrective actions much be completed by the contractor, no later than:
Test / Tag (as per AS 3012).
-
Have all electrical items ( power tools, extension cords, generators etc) been tested and tagged, and is the test up to date?
-
Corrective actions required:
-
The above listed corrective actions much be completed by the contractor, no later than:
Working at Height - (fall from one level to another).
-
Is there temporary railings in place.<br>Has an Elevating platform been commissioned for the tasks.<br>Are ladders in place, secured and extend 900 mil above the access point.<br>Are safety harnesses / lanyards being used and documented in the SWMS.
-
Fragile Roofing Materials - Australian Standard steel mesh installed.
-
Corrective actions required:
-
The above listed corrective actions much be completed by the contractor, no later than:
Cranes and Lifting Compliance.
-
Cranes and Equipment.<br>1. Suitable type and Capacity for the tasks.<br>2. Review daily crane operator checklist.<br>3. Condition and cleanliness.<br>4. Capacity, condition, storage, tagging of slings, chains, hooks, and shackles. <br>5. Stable operating surfaces and levelling blocks.<br>6. Sling selection must be completed by dogman/rigger, and inspected 3 monthly.<br>7. Where edges of loads are not protected, packing material must bemused and any corner has a radius of less then 3 times the compressed thickness of the soft sling, packing will be required.<br>8. All lifting activities must be documented onSWMS for high risk work.<br>6. Overhead power lines <br>7. Loads never lifted or suspended over workers and or public.<br><br>
-
Corrective actions required:
-
The above listed corrective actions much be completed by the contractor, no later than:
Contractor Sign Off Requirements
-
I acknowledge and agree with all items detailed on this audit report. I agree to ensure that all employees and subcontractors engaged will fully comply with the control measures indicted.
City of Greater Geelong sign off
-
A representative from the City of Greater Geelong acknowledges that all of the listed corrective actions have been completed