Location

  • Is the mainline located correctly as per the approved 'detail design plans'?

Pipe work

  • Is there adequate soil cover? (Minimum 450mm - photo)<br>

  • Add media

  • Thrust blocks are installed correctly? (Photo)

  • Add media

  • Are fittings used for changes in direction? (photo)

  • Add media

  • Backfill material is free of rock and debris? (photo)

  • Add media

Sleeves

  • Are all sleeves present and located accordingly to approved design plan (photo)

  • Add media

  • Only solvent welded joints (SWI) in sleeves? (Confirm with contractor)

Electrical

  • All cables are in conduits?

  • Conduit has a minimum soil cover of 450mm?

  • Cable pits are located at any changes in direction >45 degrees?

Final

  • Approved acceptance?

  • Comment

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. Any ratings or scores displayed in our Public Library have not been verified by SafetyCulture for accuracy. Users of our platform may provide a rating or score that is incorrect or misleading. You should independently determine whether the template is suitable for your circumstances. You can use our Public Library to search based on criteria such as industry and subject matter. Search results are based on their relevance to your search and other criteria. We may feature checklists based on subject matters we think may be of interest to our customers.