Information
-
Document No.
-
Civil Balance of Plant Condition Assessment
-
Challicum Hills
-
Clements Gap Wind Farm
-
Codrington
-
Portland II Wind Farm (Cape Bridgewater)
-
Portland III Wind Farm (Cape Nelson South)
-
Portland IV Wind Farm (Cape Sir William Grant)
-
Portland IV Wind Farm (Cape Nelson North)
-
Yambuk
-
Conducted on
-
Prepared By
-
Other auditor?
-
Location
-
Use address tab to specify road sections between multiple turbines. Be aware that turbine numbers may not run in sequence.
WTG Base and Hardstand (external)
-
Note: This section has been included within the WTG Inspection Checklist on the basis that the same sample number will be selected.
Roads
-
Add location
-
Condition of road?
-
Add media
-
Add location
-
Condition of road?<br>
-
Add media
-
Add location
-
Condition of road?
-
Add media
-
Add location
-
Condition of road?
-
Add media
-
Add location
-
Condition of road?
-
Add media
-
Add location
-
Condition of road?<br>
-
Add media
-
Add location
-
Condition of road?
-
Add media
-
Add location
-
Condition of road?
-
Add media
-
Add location
-
Condition of road?
-
Add media
-
Add location
-
Condition of road?<br>
-
-
Any other issues?
-
Drains/Drainage
-
Use address tab to specify road sections between multiple turbines. Be aware that turbine numbers may not run in sequence.
-
-
Drains/Drainage?
-
-
-
Drains/Drainage?
-
-
-
Drains/Drainage?
-
-
Any other issues?
-
Gates/Cattle Grids/Fences
-
Use address tab to specify road sections between multiple turbines. Be aware that turbine numbers may not run in sequence.
-
-
Gates/Cattle Grids/Fences?
-
-
-
Gates/Cattle Grids/Fences?
-
-
-
Gates/Cattle Grids/Fences?
-
-
Any other issues?
-
Condition Assessment Sign Off
-
Authorised Contractor Rep:
-
Authorised Owner Rep: