Title Page
-
Site conducted
-
Conducted on
-
PM Number
-
Notification Number (If multiple Notification numbers separate them by a comma.)
-
OIS Number
-
Inspector Name
-
Inspector LanID
-
Following the Lone Worker Requirements, do you have your device (i.e. Beacon or similar device) with you at all times and turned on?
-
Why don't you have one?
- I have never been issued one.
- I lost it.
- The battery doesn't hold a charge.
- It has been stolen. (i.e. Truck broken into.)
- Other - Add comments below.
-
Division
-
Group Location
-
MAT
-
Contractor Name (include subcontractor name if applicable)
-
Crew Foreman's name (First & Last)
-
Crew Size
- 0
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
- 26
- 27
- 28
- 29
- 30
- 31
- 32
- 33
- 34
- 35
- 36
- 37
- 38
- 39
- 40
- 41
- 42
- 43
- 44
- 45
- 46
- 47
- 48
- 49
- 50
- 51
- 52
- 53
- 54
- 55
-
Was there a Safety Professional present on the job site? (If so add their name/s)
-
What equipment was on-site?
-
Work Location
-
Job Scope
-
Circuit/Voltage (For Civil Work only if you are not working on an actual Circuit add N/A)
-
AFW Type and Switch log number (For Civil Work only if you are not working on an actual Circuit add N/A)
-
Was job found completed on arrival? (If YES, mark all questions N/A on the next page.)
-
Was the job cancelled? (If YES, give reason)
General Safety
-
1.0 Did you attend crew tailboard?
-
1.1 Was all required PPE used?
-
1.2 Were all Covid protocols followed? Mask, social distancing, visitor log etc
-
1.3 Was PSP (Programmatic Safety Plan) or PSSP (Project Site Safety Plan) on site?
-
1.4 Were adequate fire mitigation measures in place (per TD1464S)
-
1.5 Were safe worksite practices used including use of spotters, wheel chocks, parking brakes, outriggers, booms/buckets/forks lowered when parked or stored
-
1.6 Was traffic control needed? If so, was traffic control safe and effective?
-
1.7 Were there any issues with material availability?
-
1.8 Was any equipment leaking? If so, was environmental contacted?
-
1.9 Was Vegetation clearing needed (4' minimum clearance) and completed? Tag created if necessary?
-
1.10 Was a QEW required? Include QEW name or LAN ID.
Excavation Safety
-
2.0 Valid USA ticket on site? Please record ticket number. (Add photos of marks on USA ground)
-
2.1 Does the crew have valid permits to perform work? Encroachment, traffic control, etc?
-
2.2 PG&E Gas Ops on standby when excavating within 10 feet of known gas transmission line?
-
2.3 Air monitors in place, tested, calibrated and operational?
-
2.4 Potholing of existing utilities along proposed route performed?
-
2.5 Was any trenching needed?
-
2.6 Correct trench width used for conduit install?
-
2.7 Correct trench depth to achieve the minimum depth of cover over conduit once installed?
-
2.8 Utility crossing separation adequate?
-
2.9 Correct size conduit and type installed?
-
2.10 Concrete encasement requirements met?
-
2.11 Minimum conduit cover met?
-
2.12 What was the total amount of Primary Conduit (Feet) installed today?
-
2.13 Backfill requirements per PG&E and city specifications met?
-
2.14 Compaction and compaction testing performed?
-
2.15 Restoration requirements per City Standards planned or completed?
-
2.16 Correct sized mandrel used to mandrel conduit, and every conduit installed to be mandreled?
Shoring
-
3.0 Was shoring installed for excavation deeper than 60''? If yes, what type of shoring was used?
-
3.1 Soil conditions reviewed/tested including identifying any soil classified as less stable due to factors like heavy traffic, pile driving etc.?
-
3.2 1-1/8” plywood sheeting used when needed per soil conditions evaluated by onsite competent person?
-
3.3 Trench box rated for excavation size and depth?
-
3.4 Rated rigging used during assembly and handling of shoring shields?
-
3.5 Equipment sized correctly while assembling and handling shoring shields?
Boring
-
4.0 Was boring needed? (If answer is NO, select N/A as the answer to questions 4.1 - 4.10)
-
4.1 Does the city allow bore operations within their jurisdictions?
-
4.2 Cross bore of sewers completed?
-
4.3 Potholing of existing utilities and size, type, top and bottom recorded on the street and in a potholing log?
-
4.4 Calibration of Sonde (tracking instrument) prior to bore operation?
-
4.5 Ample separation of existing utilities given during bore operations?
-
4.6 Return flow maintained during reaming and product pulling operations?
-
4.7 Daylight utilities while boring past or reaming back operations ?
-
4.8 Correct mud and polymer used per soil conditions?
-
4.9 Product installed at depth per design and standard?
-
4.10 Correct control and disposal of bore tailings and mud?
Enclosures and Boxes
-
5.0 Correct size and type of enclosure installed per design?
-
5.1 Correct rated lid type and enclosure for the equipment being installed and area it is placed
-
5.2 Crushed rock base section placed?
-
5.3 Adequate compaction around enclosure perimeter?
-
5.4 Conduit placed in correct knockouts?
Job Completion
-
6.0 Did outage end on time? If not, why?
-
6.1 Was all work completed as planned (ready for closeout) or in progress over multiple days?
-
6.2 Did you encounter issues during planning or execution of the job? Include recommendations to prevent recurrence?
-
6.3 Was the job built to PGE safety, quality, and compliance standards? Describe any issues.
-
6.4 Attach multiple photos (Minimum 8) - These photos should capture work being completed at each location.
-
6.5 How many questions were marked Red?
- 0
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
- 26
- 27
- 28
- 29
- 30
- 31
- 32
- 33
- 34
- 35
- 36
- 37
- 38
- 39
- 40
- 41
- 42
- 43
- 44
- 45
- 46
- 47
- 48
- 49
- 50
- 51
- 52
- 53
- 54
- 55
-
Signature