Title Page

  • Site conducted

  • Store name

  • Conducted on

  • Prepared by

Pre-works

  • Attach permit to work for each day; ensuring date, engineers signature and store manager signature is captured.

  • Are packs on R404A?

  • Are assets free of liquid flood back? Attach photos and detail if issue.

  • Has leak detection been carried out? Send photo of detection; if leaks found, please detail and advise if corrective work is needed by the NOC i.e brazing.

  • Are there any other issues that require corrective works by Tesco? Please attach photos and detail.

  • Attach photo of device alarms on Danfoss panel prior to works.

  • Contact Stuart Mcleod/IMS to inhibit alarms on associated pack prior to work. Cc Elliot Waller/Carly Harrison

Refrigerant Tracking

  • Reclaim bottle serial nos.; reclaim weight and corresponding pack ID - attach photo of bottle tracker

  • Refrigerant bottle serial no.; charge weight and corresponding pack ID - attach photo of bottle tracker

  • Are there any unopened or part used bottles? If so attach photo showing serial no. & seal intact.

  • Are there any part used bottles? Please detail. Can this be charged into system or taken to another site?

  • Provide photo and description of bottle location to arrange collection.

Changeover

  • Has liquid level on receiver hit top of bottom sight glass? Attach photograph and detail pack ID.

  • Have F-Gas labels been attached to the pack including system ID, refrigerant charge and co2 equivalent? Provide photo of each.

  • Have core driers and zero caps been replaced? Attach photographs.

  • If Express store, have solenoid valves on liquid line had their seal and diaphragm replaced?

  • For stores with EEVs has refrigerant type in controller setup been adjusted to reflect new refrigerant glide? If no option to change to R448A, have superheats been adjusted from 3-8k to 8-12AKV?

  • Check thermal expansion valve (TEV) suitability for operation with the replacement refrigerant. Monitor and adjust as required to optimise performance.

  • Have pack IDs on IMS been updated to the latest Tesco commissioning standard? I.e. pack reference, saturated suction temperature, refrigerant type e.g. HT01,-7,R448A

  • Has a leak detection test been carried out following works? Any issues, please detail.

  • Are cases down to temperature following changeover?

  • Record device alarms on danfoss panel following changeover. Any issues?

  • Contact Stuart Mcleod/IMS to re-instate alarms.

  • Do you have any final comments, issues or concerns to note?

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.