Job Information
-
Job Number
-
Module Number
-
QA completed by
-
Modscape Supervisor
-
Conducted on
Untitled Page
-
Enter room name
Carcass'
-
Are All cabinets secured properly? Base cabinets fixed, overheads secured adequately?
-
Are the Carcass' free of damage?
-
Are all Carcass' installed in correct locations and LEVEL? Add Photos
Doors and Panels
-
Are all kickers and shadowlines square/parallel
-
Are all doors and panels aligned as per guidelines? Add photos of All door margins and draw margins
-
Are doors and panels free of damage?
-
Are all infills and panels no more gaped and siliconed to walls?
-
Are oven cleats and fillers set back correct amount and fillers secured correctly.
-
Are stickers marks and glue residue cleaned off all door and panels?
-
Does job have pull out pantry?
-
is pantry working well and running smoothly.
Benchtops
-
Are all bench tops free of damage
-
Add photos of all edges of benchtops
-
Are all benchtops no more gaped and siliconed to walls?
-
Are cutouts as per specs for HP and Sink
-
Are cutouts in correct positions? If yes, Add photo to show
-
Does job have lift up benchtop?
-
Is lift up benchtop functioning correctly?
Appliance's
-
Is Range hood cabinet as per job specifications
-
Oven space or void as per job specifications, with oven rails set correctly
Hardware
-
Handles as per job specifications and guidelines?
-
Do pot draws have screws at front of draw runners to prevent dropping?
-
Does job have slide out bin?
-
Is installed as per spec, and functioning correctly? Add photos
-
Is all hardware in good working order? (draws running freely, soft close closing completley, hinges correct)
-
Does job have soft close hinges?
-
Are all doors soft closing as per spec?
-
Does the room have soft close draws?
-
Are draw side clips attached to all draws? Take photos
-
Add photos of all shelves in cabinets.
ADS Maintenance / Installer Notes / Builders Feedback
-
Is a maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is there any Notes for installer to be aware of?
-
All notes entered here will appear on the installers report
-
Brief Description of room install and information for builder on Maintenances
-
install feedback and maintenance feedback
Carcass'
-
Are All cabinets secured properly? Base cabinets fixed?
-
Are the Carcass' free of damage?
-
Are all Carcass' installed in correct locations and LEVEL? Add Photos
Doors and Panels
-
Are all kickers square/parallel
-
Are all draws aligned as per guidelines? Add photos of All draw margins
-
Are all panels and shelves free of damage?
-
Are all panels level and plumb? Add Photos.
-
Are all infills and panels no more gaped to walls?
-
Are stickers marks and glue residue cleaned off all door and panels?
Hardware
-
Handles as per job specifications and guidelines?
-
Are hanging rails level and at correct heights
-
Is all hardware in good working order? (draws running freely)
-
Add photos of all elevations
ADS Maintenance / Installer Notes / Builders Feedback
-
Is a maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is there any Notes for installer to be aware of?
-
All notes entered here will appear on the installers report
-
Is there any issues for the builder to be aware of?
-
All notes entered here will appear on the builders report
Carcass'
-
Are All cabinets secured properly? Base cabinets fixed, overheads secured adequately?
-
Are the Carcass' free of damage?
-
Are all Carcass' installed in correct locations and LEVEL? Add Photos
Doors and Panels
-
Are all kickers and shadowlines square/parallel
-
Are all doors and panels aligned as per guidelines? Add photos of All door margins and draw margins
-
Are doors and panels free of damage?
-
Are all infills and panels no more gaped and siliconed to walls?
-
Are oven cleats and fillers set back correct amount and fillers secured correctly.
-
Are stickers marks and glue residue cleaned off all door and panels?
-
Does job have pull out pantry?
-
is pantry working well and running smoothly.
Hardware
-
Handles as per job specifications and guidelines?
-
Add photos of all shelves in cabinets.
ADS Maintenance / Installer Notes / Builders Feedback
-
Is a maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is there any Notes for installer to be aware of?
-
All notes entered here will appear on the installers report
-
Brief Description of room install and information for builder on Maintenances
-
install feedback and maintenance feedback
Completed
-
It is important that the information you have provided is complete and correct. Please confirm that all information required has been entered.
-
Is the job Pass or Fail
-
Total travel time for any maintenance's if applicable
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Please provide any other information that would be useful.
-
Please sign before submitting this form
-
modscape representative signature
-
Thankyou