Information
-
Site Details
-
Prepared by
-
Conducted on
-
Location
INSPECTION DETAILS
-
CARRIED OUT BY
-
TITLE
ELEVATOR
-
Are cabin doors clean?
-
Is the cabin interior clean?
-
The area is free from any unpleasant odours?
ELEVATOR FOYER
-
Is the area clear of marks and dust?
-
Has the area been mopped/vacuumed?
STAIRWELLS/HARD SURFACES
-
Are the walls and vertical surfaces free from marks, scuffs and dust?
-
Has the area been mopped/vacuumed?
-
Are there any cobwebs?
MANGER'S CARPARK - IF APPLICABLE
-
Have oil stains been removed?
-
Has the floored been cleared of leaves and debris?
MEETING ROOMS
-
Are bins being emptied?
-
Have the tables been cleaned?
-
Has the area been mopped/vacuumed?
-
Are there any cobwebs?
MAIN FOYER
-
Are bins being emptied?
-
Is the leather furniture free from marks and scuffs?
-
Has the area been mopped/vacuumed?
-
Are there any cobwebs?
OFFICE AREAS
-
Are all horizontal and vertical surfaces including glass clear of marks, fingerprints and dust?
-
Are bins being emptied?
-
Has the area been mopped/vacuumed?
-
Are there any cobwebs?
BREAKOUT AREAS, KITCHENS AND LUNCHROOMS
-
Are regular bins and recycle bins being emptied?
-
Has the area been mopped/vacuumed?
-
Are there any cobwebs?
TOILETS
-
Are bins being emptied?
-
Have soap and hand towels been replenished?
-
Has the area been mopped/vacuumed?
-
Are there any cobwebs?
KEY PERFORMANCE INDICATORS
-
KPI 1 - Management and Supervision
-
Contractor complies with Principal direction within the directed timeframe.
-
KPI 2 - Service Delivery - General
-
Services are carried out in accordance with the cleaning outcomes detailed in Schedule 1 of the cleaning contract, as well as any additional service requests.
-
KPI 3 - Service Delivery - Site
-
Services for each site are carried out in accordance with the requirements of the Schedule for the relevant site.
-
KPI 4 - OH & S
-
Contractor ensures that there are no potential OH&S incidents in relation to the services. All OH&S incidents are reported to the Principal.
-
KPI 5 - Administration
-
Contractor produces and maintains accurate log books, job cards, service completion reports, invoices and other reports and documentation.
-
KPI 6 - Customer Satisfaction
-
There are no reported incidents of customer dissatisfaction. All requests in Site Communications books are satisfactorily addressed.
-
KPI 7 - Environmental
-
Contractor has not caused any breaches of environmental laws.
-
KPI 8 - Improvements
-
Number of recommendations and area improvements (to improve overall standard of cleanliness and improve customer satisfaction). Identification of cost saving measures for both parties.
-
KPI 9 - Periodical Services
-
All periodical services delivered in accordance with the planned timings.
-
KPI 10 - Reporting and Meetings
-
Regular cleaning reports are delivered in accordance with the required timings and meetings between the Principal and the Contractor are held as requested by the Principal.
4. AREA SPECIFIC REQUIREMENTS
-
Specific Requirement 1
-
Add any specific requirement unique to the area that is being inspected. (included due date)
-
Specific Requirement 2
-
Add any specific requirement unique to the area that is being inspected. (included due date)
-
Specific Requirement 3
-
Add any specific requirement unique to the area that is being inspected. (included due date)
5. SUMMARY
-
The above Safety Inspection was conducted:
-
The Cleaning Audit results have been reviewed and actions required will be implemented.
-
Program Leader's Signature
-
Manager's Signature