Title Page

  • Site Address
  • ROW, SDU, MDU or Other

  • What type of work was completed?

  • Prepared by

  • Conducted on

  • Type of Audit

  • Reason for site visit?

  • What work is being completed on site?

  • Reason for Support?

  • Scope improvement required?

  • Please explain other?

  • Please explain in details support provided and solution.

  • Was Training Required?

Technical Training Record

  • What type of training was conducted?

  • What Health and Safety Training Was Provided

  • Select what PPE training was provided for:

  • Please select Compliance Training Provided?

  • Please Select Standards Training was completed on:

  • Site setup and compliance to TMP standards.

  • Select What was tech shown:

  • Tick the following

  • Oil and dipstick

  • Water and Radiator condition

  • Tyre Pressure including Spare Tyre

  • Visibility (e.g. Windscreen/Mirrors)

  • Compliance (WOF/Rego/RUC/COF)

  • Brakes/ Handbrake

  • Lights (Front/Rear/Indicators/Number Plate)

  • Trailer Maintance

  • Technical training included:

  • Please list Other?

  • List Plant/Equipment trained on:

  • What Systems training was done on:

Technical Training Record

  • What type of training was conducted?

  • What Health and Safety Training Was Provided

  • Select what PPE training was provided for:

  • Please select Compliance Training Provided?

  • Please Select Standards Training was completed on:

  • Site setup and compliance to TMP standards.

  • Select What was tech shown:

  • Tick the following

  • Oil and dipstick

  • Water and Radiator condition

  • Tyre Pressure including Spare Tyre

  • Visibility (e.g. Windscreen/Mirrors)

  • Compliance (WOF/Rego/RUC/COF)

  • Brakes/ Handbrake

  • Lights (Front/Rear/Indicators/Number Plate)

  • Trailer Maintance

  • Technical training included:

  • Please list Other?

  • List Plant/Equipment trained on:

  • What Systems training was done on:

  • Please provide brief description of the training

  • Please select competency after training

  • Were you (the auditor) inducted properly before entering the site in the following information?<br>1. Tasks to be performed, the risks associated & the controls in place.<br>2. Checked your PPE if complete<br>3. First aiders on site, first aid kit and fire extinguisher location (rego if in vehicle).<br>4. Exact location of evacuation point, nearest emergency center address.

  • Provide details of the coaching onsite and/or additional training required.

  • Do you believe the crew can perform their tasks for this job and have all appropriate training.

  • Provide details of the coaching onsite and/or additional training required.

  • Select additional Training Required

  • Please Specify Other

  • Has the site management and setup been observed to be... <br>Consider the following: <br>1. Work Isolation <br>2. Traffic and pedestrian management <br>3. Safe and efficient site layout

  • Stop work and ensure site is made safe!

  • Provide Details of the risk, coaching on site and additional training required.

  • Have the crew reviewed/signed the JSA, relating to their work, and are the appropriate risk control methods being put in place?

  • Provide details of the coaching onsite and additional training required.

  • Has the Site Risk Assessment document (Site Plan) been correctly completed relative to the specific job?

  • Provide details of the coaching onsite and additional training required.

  • Is the crew compliant with current Health, Safety & Environmental procedures & policies?

  • Provide Details of the risk, coaching on site and additional training required.

  • Attach Health, Safety & Environmental non-compliance photos

  • Stop work and ensure site is made safe!

  • Is all required PPE available, in good condition and being used correctly.

  • Stop work and ensure site is made safe!

  • Provide details of the coaching onsite and additional training and/or remedial action required for PPE.

  • Do the crew have all the tools and equipment they need to perform their task safely.

  • Please list tools required or in need of replacement or repair?

  • Observe the vehicles on site for the following: 1. Safe to operate including WOF/COF and Rego 2. Presentable and Tidy 3. Equipment is secure and secured properly 4. Parked appropriate and safely

  • Provide details of the coaching onsite and training and/or remedial action required.

  • Have you observed exceptional behavior that warrants recognition? (Please note the behavior)

  • Photos of the behavior.

  • Are there any High Risk activities taking place onsite?

  • Concrete Saw Cutting.

  • Is Concrete Cutting activity:

  • Provide details of the coaching onsite and additional training and/or remedial action required.

  • Provide Photos of at risk or significant at risk activity.

  • Terrasaw Cutting

  • Is Terrasaw Cutting activity:

  • Provide details of the coaching onsite and additional training and/or remedial action required.

  • Provide Photos of at risk or significant at risk activity.

  • Is Mechanical Trenching activity:

  • Is Mechanical Trenching activity:

  • Provide details of the coaching onsite and additional training and/or remedial action required.

  • Provide Photos of at risk or significant at risk activity.

  • Digger Operation

  • Is Digger Operation activity:

  • Provide details of the coaching onsite and additional training and/or remedial action required.

  • Provide Photos of at risk or significant at risk activity.

  • Working in the vicinity of services while trenching Manually or Mechanically

  • Is the Working in the vicinity of services while trenching activity:

  • Provide details of the coaching onsite and additional training and/or remedial action required.

  • Provide Photos of at risk or significant at risk activity.

  • Location of Services (Cat/Genny)

  • Is the Location of Services (Cat/Genny) activity:

  • Provide details of the coaching onsite and additional training and/or remedial action required.

  • Provide Photos of at risk or significant at risk activity.

  • Use of Compactor

  • Is Compacting activity:

  • Provide details of the coaching onsite and additional training and/or remedial action required.

  • Provide Photos of at risk or significant at risk activity.

  • Use of Drill

  • Is Drilling activity:

  • Provide details of the coaching onsite and additional training and/or remedial action required.

  • Provide Photos of at risk or significant at risk activity.

  • Fibre Blowing and/or use of compressor

  • Is Fibre Blowing and/or use of compressor activity:

  • Provide details of the coaching onsite and additional training and/or remedial action required.

  • Provide Photos of at risk or significant at risk activity.

  • Is Working at height activity:

  • Is Working at height activity:

  • Provide details of the coaching onsite and additional training and/or remedial action required.

  • Provide Photos of at risk or significant at risk activity.

  • Working with suspected Asbestos

  • Is Working with suspected Asbestos activity:

  • Provide details of the coaching onsite and additional training and/or remedial action required.

  • Provide Photos of at risk or significant at risk activity.

  • Is Working in a confined/restricted space activity:

  • Is Working in a confined/restricted space activity:

  • Provide details of the coaching onsite and additional training and/or remedial action required.

  • Provide Photos of at risk or significant at risk activity.

  • Is Working in High Traffic areas activity:

  • Is Working in High Traffic areas activity:

  • Provide details of the coaching onsite and additional training and/or remedial action required.

  • Provide Photos of at risk or significant at risk activity.

  • Is Working on a sloping site activity:

  • Is Working on a sloping site activity:

  • Provide details of the coaching onsite and additional training and/or remedial action required.

  • Provide Photos of at risk or significant at risk activity.

  • Any other potentially high risk activities

  • Activity:
  • What is the activity?

  • Is Activity:

  • Provide details of the coaching onsite and additional training and/or remedial action required.

  • Provide Photos of at risk or significant at risk activity.

  • Would you like to complete a live Quality Assessment

Audit Type

  • What part of the work is the Audit completed for?

Inside Boundary Civil

  • Please select all methods completed

  • Soft Trench Depth to Standard?

  • Soft Surface Reinstatement to Standard? (Grass seed and Topsoil)

  • Hard Trench Depth to Standard?

  • Hard Trench Cut Straight?

  • Hard Trench Temp Reinstatement?

  • Hard Trench Permanent Reinstatement Completed?

  • Hard Trench Permanent Reinstatement To Standard?

  • Is the Slot Trench to Standard?

  • Is the Slot Trench Straight?

  • Slot Trench Depth to Standard?

  • Is the Slot Trench Reinstatement to Standard? (If not reinstated please Fail)

  • Has the Fenceline been installed to Standard?

  • Is Fenceline at correct height?

  • Correct spacing between P-Clips? (300mm)

  • Has stainless steel screws been used?

  • Is the transition completed to standard?

  • Have the use of conduit been approved?

  • Is the conduit on fence installed to Standard?

  • Correct spacing between saddles? (600mm)

  • Stainless Steel Saddles and Screws used?

  • All connections on ISB conduit properly connected?

  • Is the Thrust at correct depth? (450mm)

  • Is the reinstatement for entry and exit holes to Standard?

  • Is the Undermine completed to standard?

  • Is the Undermine at correct depth?

  • Is there evidence of Service Location?

  • Is the Ped installed to standard

  • Have the Ped been labeled?

  • Is drop off's installed to standard?

  • Drop Off
  • Have Drop been installed to Standard?

  • Is the Marker Post/ Pave-stone installed to standard?

Outside Boundary Civil

  • Please select all methods completed

  • Soft Trench Depth to Standard?

  • Soft Surface Reinstatement to Standard? (Grass seed and Topsoil)

  • Is the Marker Post/ Pave-stone left to Standard?

  • Hard Trench Depth to Standard?

  • Hard Trench Cut Straight?

  • Hard Trench Temp Reinstatement?

  • Hard Trench Permanent Reinstatement Completed?

  • Hard Trench Permanent Reinstatement To Standard?

  • Is the Marker Post/ Pave-stone left to Standard?

  • Has the Fenceline been installed to Standard?

  • Is the transition completed to standard?

  • Is the Marker Post left to Standard?

  • Have the use of conduit been approved?

  • Is the conduit on retaining wall installed to Standard?

  • Correct spacing between saddles? (600mm)

  • Stainless Steel Saddles and Screws used?

  • All connections OSB conduit properly connected?

  • Is the Undermine completed to standard?

  • Is the Undermine at correct depth?

Reinstatement

  • Has the permanent Reinstatement been completed to Standard?

  • Has council Standards been adhered to?

  • All cones removed from site

  • Is the marker post/ pave-stone been left to standard?

Fibre Blowing

  • Have fibre blowing standards been followed?

  • Is the slack managed and sufficient?

  • Gas block installation?

  • ETP Installation and secure on house side?

External Building Cabling

  • Please select all methods completed

  • Is ETP Installation Completed to standard?

  • It the ETP secured appropriately

  • Is fibre Management as per standard?

  • Are all screws present and fitted?

  • Is the conduit on building installed to standard?

  • Correct spacing for saddles used on building? (600mm)

  • Stainless Steel Saddles and Screws used?

  • All connections on External conduit properly connected?

  • Is the External Exposed Cable installed to standard?

  • Has the exposed cable P-clip spacing been adhered to?

  • Has stainless steel screws been used?

  • Have all penetrations into property been completed to standards?

Internal Building Cabling

  • Please select Internal cabling methods?

  • Has the installation Standards been adhered to?

  • Is the cable covered according to standard?

  • Is the capping installed to standard?

  • Is the capping secured securely?

  • Are all bends/corners and ends capped with covers?

  • Is the capping cover securely fitted?

  • Is the capping clean and tidy?

  • Is the cable run in the underfloor per standard?

  • Is the cable securely fastened and not hanging on the floor?

  • Is securing clips installed max 600mm apart?

  • Is the cable run in the ceiling per standard?

  • Is the cable securely fastened and not hanging loose?

  • Is securing clips installed max 600mm apart?

  • Has the internal conduit run been approved?

  • Is the internal conduit installed to standard?

  • Correct spacing of the saddles on internal conduit?

  • All connections on Internal conduit properly connected?

  • Has the penetration been sealed appropriately?

Fibre Splicing and Management

  • Please select Splicing and Management locations?

  • Is cable routing standard in Ericsson cabinet followed?

  • Is the splice to standard with pictail in Ericsson cabinet?

  • Is the management of the fibre in the tray in the Ericsson cabinet to standard?

  • Is cable routing standard in Shape cabinet followed?

  • Is the splice to standard in Shape cabinet?

  • Is the correct tray used in Shape cabinet?

  • Is the management of the fibre in the tray in the Shape cabinet to standard?

  • Is the Ped lid secured?

  • Is the tube for the fibre installed in the correct position?

  • Is cable routing standard in Ped been followed?

  • Have the correct Tray been used in Ped?

  • Is the splicing standard in Ped adhered to?

  • Is the management of the fibre in the Ped tray to standard?

  • Is the cable routing standard in CDP followed?

  • Is the fibre management standard for the CDP followed?

  • Is the splicing in CDP standard adhered to?

  • Is the fibre management standard for the ETP followed?

  • Is the splicing in ETP standard adhered to?

  • Is a gas block installed?

  • Is the fibre management standard for the ITP followed?

  • Is the splicing in ITP standard adhered to?

  • Is connector installed in the ITP to standard?

  • Is the fibre management standard for the back plate followed?

  • Is the splicing in back plate standard adhered to?

  • Is All areas clear of fibre waste?

Connection

  • Is the Customer or End user present?

  • Is the customer happy with the installation?

  • Is the location of ONT and cabling installed to customers expectations?

  • Was the crew friendly and helpful?

  • Did the customer understand the crew and did they use plain English?

  • Feed back from the customer?

  • Is the ONT installed to standard?

  • Is the Connection standing up and working correctly?

  • Did the tech complete all the correct documentation?

  • All photos uploaded to simPRO?

  • Is the phone integration completed as per standard?

  • Have the site been left in a clean and tidy manor?

  • In General the site Health and Safety, and actions/behaviors were

Audit Type

  • What part of the work is the Audit completed for?

Inside Boundary Civil

  • Please select all methods completed

  • Soft Trench Depth to Standard?

  • Soft Surface Reinstatement to Standard? (Grass seed and Topsoil)

  • Hard Trench Depth to Standard?

  • Hard Trench Cut Straight?

  • Hard Trench Temp Reinstatement?

  • Hard Trench Permanent Reinstatement Completed?

  • Hard Trench Permanent Reinstatement To Standard?

  • Is the Slot Trench to Standard?

  • Is the Slot Trench Straight?

  • Slot Trench Depth to Standard?

  • Is the Slot Trench Reinstatement to Standard? (If not reinstated please Fail)

  • Has the Fenceline been installed to Standard?

  • Is Fenceline at correct height?

  • Correct spacing between P-Clips? (300mm)

  • Has stainless steel screws been used?

  • Is the transition completed to standard?

  • Have the use of conduit been approved?

  • Is the conduit on fence installed to Standard?

  • Correct spacing between saddles? (600mm)

  • Stainless Steel Saddles and Screws used?

  • All connections on ISB conduit properly connected?

  • Is the Thrust at correct depth? (450mm)

  • Is the reinstatement for entry and exit holes to Standard?

  • Is the Undermine completed to standard?

  • Is the Undermine at correct depth?

  • Is there evidence of Service Location?

  • Is the Ped installed to standard

  • Have the Ped been labeled?

  • Is drop off's installed to standard?

  • Drop Off
  • Have Drop been installed to Standard?

  • Is the Marker Post/ Pave-stone installed to standard?

Outside Boundary Civil

  • Please select all methods completed

  • Soft Trench Depth to Standard?

  • Soft Surface Reinstatement to Standard? (Grass seed and Topsoil)

  • Is the Marker Post/ Pave-stone left to Standard?

  • Hard Trench Depth to Standard?

  • Hard Trench Cut Straight?

  • Hard Trench Temp Reinstatement?

  • Hard Trench Permanent Reinstatement Completed?

  • Hard Trench Permanent Reinstatement To Standard?

  • Is the Marker Post/ Pave-stone left to Standard?

  • Has the Fenceline been installed to Standard?

  • Is the transition completed to standard?

  • Is the Marker Post left to Standard?

  • Have the use of conduit been approved?

  • Is the conduit on retaining wall installed to Standard?

  • Correct spacing between saddles? (600mm)

  • Stainless Steel Saddles and Screws used?

  • All connections OSB conduit properly connected?

  • Is the Undermine completed to standard?

  • Is the Undermine at correct depth?

Reinstatement

  • Has the permanent Reinstatement been completed to Standard?

  • Has council Standards been adhered to?

  • All cones removed from site

  • Is the marker post/ pave-stone been left to standard?

Fibre Blowing

  • Have fibre blowing standards been followed?

  • Is the slack managed and sufficient?

  • Gas block installation?

  • ETP Installation and secure on house side?

External Building Cabling

  • Please select all methods completed

  • Is ETP Installation Completed to standard?

  • It the ETP secured appropriately

  • Is fibre Management as per standard?

  • Are all screws present and fitted?

  • Is the conduit on building installed to standard?

  • Correct spacing for saddles used on building? (600mm)

  • Stainless Steel Saddles and Screws used?

  • All connections on External conduit properly connected?

  • Is the External Exposed Cable installed to standard?

  • Has the exposed cable P-clip spacing been adhered to?

  • Has stainless steel screws been used?

  • Have all penetrations into property been completed to standards?

Internal Building Cabling

  • Please select Internal cabling methods?

  • Has the installation Standards been adhered to?

  • Is the cable covered according to standard?

  • Is the capping installed to standard?

  • Is the capping secured securely?

  • Are all bends/corners and ends capped with covers?

  • Is the capping cover securely fitted?

  • Is the capping clean and tidy?

  • Is the cable run in the underfloor per standard?

  • Is the cable securely fastened and not hanging on the floor?

  • Is securing clips installed max 600mm apart?

  • Is the cable run in the ceiling per standard?

  • Is the cable securely fastened and not hanging loose?

  • Is securing clips installed max 600mm apart?

  • Has the internal conduit run been approved?

  • Is the internal conduit installed to standard?

  • Correct spacing of the saddles on internal conduit?

  • All connections on Internal conduit properly connected?

  • Has the penetration been sealed appropriately?

Fibre Splicing and Management

  • Please select Splicing and Management locations?

  • Is cable routing standard in Ericsson cabinet followed?

  • Is the splice to standard with pictail in Ericsson cabinet?

  • Is the management of the fibre in the tray in the Ericsson cabinet to standard?

  • Is cable routing standard in Shape cabinet followed?

  • Is the splice to standard in Shape cabinet?

  • Is the correct tray used in Shape cabinet?

  • Is the management of the fibre in the tray in the Shape cabinet to standard?

  • Is the Ped lid secured?

  • Is the tube for the fibre installed in the correct position?

  • Is cable routing standard in Ped been followed?

  • Have the correct Tray been used in Ped?

  • Is the splicing standard in Ped adhered to?

  • Is the management of the fibre in the Ped tray to standard?

  • Is the cable routing standard in CDP followed?

  • Is the fibre management standard for the CDP followed?

  • Is the splicing in CDP standard adhered to?

  • Is the fibre management standard for the ETP followed?

  • Is the splicing in ETP standard adhered to?

  • Is a gas block installed?

  • Is the fibre management standard for the ITP followed?

  • Is the splicing in ITP standard adhered to?

  • Is connector installed in the ITP to standard?

  • Is the fibre management standard for the back plate followed?

  • Is the splicing in back plate standard adhered to?

  • Is All areas clear of fibre waste?

Connection

  • Is the Customer or End user present?

  • Is the customer happy with the installation?

  • Is the location of ONT and cabling installed to customers expectations?

  • Was the crew friendly and helpful?

  • Did the customer understand the crew and did they use plain English?

  • Feed back from the customer?

  • Is the ONT installed to standard?

  • Is the Connection standing up and working correctly?

  • Did the tech complete all the correct documentation?

  • All photos uploaded to simPRO?

  • Is the phone integration completed as per standard?

  • Have the site been left in a clean and tidy manor?

  • Personnel
  • Personnel

  • Comments on the Audit

  • Audited By:

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.