Title Page
-
Site Address
-
ROW, SDU, MDU or Other
-
What type of work was completed?
-
Prepared by
-
Conducted on
-
Type of Audit
-
Reason for site visit?
-
What work is being completed on site?
- Civil
- Internal
- OSB work
- Scope
- Reinstatement
- Connection
- Blowing
-
Reason for Support?
- Technical support
- Non-Standard Approval
- Scope Issues
- Tube Fault
- Missed connection
- Customer Resolution
- Vehicle Issues
- Allocation Issues
- Tube Breakout Approval
- Health and Safety
- Service Location
- Other
-
Scope improvement required?
-
Please explain other?
-
Please explain in details support provided and solution.
-
Was Training Required?
Technical Training Record
-
What type of training was conducted?
- Health and Safety
- Standard Compliance
- Traffic Management
- Vehicle Competancy
- Technical
- Plant/Equipment
- Leadership
- Systems/IT
- Process/Procedure
- Field Induction
-
What Health and Safety Training Was Provided
- Hazard Id / Risk Assesment
- Job Start
- First Aid Understanding
- Evacuation Planning
- Fire Extinguisher
- Fibre Handling
- Incident Reporting
- Height Safety Onsite
- Selecting and using PPE
- PPE Compliance inspections
- Safe Blowing
- Health on site
-
Select what PPE training was provided for:
- Safety Footwear
- High Vis Vest/Clothing
- Long Pants
- Long Sleeve Shirt
- Hearing Protection – Ear Muffs
- Rainwear – Weather Dependent Site Compliant
- Gloves (task specific type)
- P2 level Dust Mask
- Safety Glasses/ Eye Protection (always carried)
- Hard Hat – Site Compliant
- Sunhat
- Dust Coat
- Nitryl Gloves
- Disposable Overalls
- P3 Asbestos Dust Mask
- Flame Retardant Overalls
- Waders
- Fall Restraint
- Full Face Respirator
- Fall Arrest
- Back Support Brace
- Chaps
- Face Shield
-
Please select Compliance Training Provided?
-
Please Select Standards Training was completed on:
- IS003 (Enable Networks Limited Standards - General)
- IS011 (Multiduct Installation Standard)
- IS017 (Fibre Installation Standards)
- IS025 (Pedestal Installation Standard)
- IS033 (Multiduct Jointing Standard)
- IS034 (Multiduct Breakout Standard)
- ENOG020 (Webmaps User Guide)
- ENOP019 Lateral Tube Break-in & Break-out Procedure)
- IS037 (Service Lead-in Installation Standard)
- IS038 (Premises (SDU) Installation Standard)
- IS039 (End-User Connection Scoping Standard)
- IS041 (Right of Way Distribution Network Installation Standard)
- IS042 (Ancillary Services Standard)
- IS045 (Fence-line Lead-in Installation Standard)
- IS046 (Mini Pedestal Installation Standard)
- IS057 (End User Fibre Installation Standard)
-
Site setup and compliance to TMP standards.
-
Select What was tech shown:
- Complete Vehicle Checklist
- Reversing on site
- Towing of Trailers
- Safe Driving Practices
- Load Securing
- Security
- Traffic Management
- Use of Hose Ramps
- Maintenance
-
Tick the following
-
Oil and dipstick
-
Water and Radiator condition
-
Tyre Pressure including Spare Tyre
-
Visibility (e.g. Windscreen/Mirrors)
-
Compliance (WOF/Rego/RUC/COF)
-
Brakes/ Handbrake
-
Lights (Front/Rear/Indicators/Number Plate)
-
Trailer Maintance
-
Technical training included:
- Trenching/Excavation
- Duct Jointing
- Fibre Jointing
- Service Location
- Cable Installation
- Blowing
- Fault Finding
- Copper Jointing
- Tube Breakout
- Reinstatement
- Compaction
- AsBuilt
- Reading/Understanding Plans
- Other
-
Please list Other?
-
List Plant/Equipment trained on:
- Concrete Saw
- Terra Saw
- Chain Trencher
- Excavator/Digger
- Compressor
- Generator
- BOF Gun
- Tools (Hand tools)
- Drills
- Grinder/Multi Tool
- Ladder
- Splicer
- Grundomat
- Stud Finder/ Wall Scanner
- EWP
- Cable Locator
-
What Systems training was done on:
- SimPRO
- Connect App
- WebMaps
- Office 365
- iAuditor
- IMS Team Up
- CamScan
- Share Point
Technical Training Record
-
What type of training was conducted?
- Health and Safety Standards Compliance
- Site and Traffic Management
- Onsite Documentation
- Vehicle/Driving Competency
- Technical/Standards
- Plant/Equipment
- Technician Responsibility
- Systems/IT
- Process and Procedure
- Field Induction
- Other
-
What Health and Safety Training Was Provided
- Hazard Id / Risk Assesment
- Job Start
- First Aid Understanding
- Evacuation Planning
- Fire Extinguisher
- Fibre Handling
- Incident Reporting
- Height Safety Onsite
- Selecting and using PPE
- PPE Compliance inspections
- Safe Blowing
- Health on site
-
Select what PPE training was provided for:
- Safety Footwear
- High Vis Vest/Clothing
- Long Pants
- Long Sleeve Shirt
- Hearing Protection – Ear Muffs
- Rainwear – Weather Dependent Site Compliant
- Gloves (task specific type)
- P2 level Dust Mask
- Safety Glasses/ Eye Protection (always carried)
- Hard Hat – Site Compliant
- Sunhat
- Dust Coat
- Nitryl Gloves
- Disposable Overalls
- P3 Asbestos Dust Mask
- Flame Retardant Overalls
- Waders
- Fall Restraint
- Full Face Respirator
- Fall Arrest
- Back Support Brace
- Chaps
- Face Shield
-
Please select Compliance Training Provided?
-
Please Select Standards Training was completed on:
- IS003 (Enable Networks Limited Standards - General)
- IS011 (Multiduct Installation Standard)
- IS017 (Fibre Installation Standards)
- IS025 (Pedestal Installation Standard)
- IS033 (Multiduct Jointing Standard)
- IS034 (Multiduct Breakout Standard)
- ENOG020 (Webmaps User Guide)
- ENOP019 Lateral Tube Break-in & Break-out Procedure)
- IS037 (Service Lead-in Installation Standard)
- IS038 (Premises (SDU) Installation Standard)
- IS039 (End-User Connection Scoping Standard)
- IS041 (Right of Way Distribution Network Installation Standard)
- IS042 (Ancillary Services Standard)
- IS045 (Fence-line Lead-in Installation Standard)
- IS046 (Mini Pedestal Installation Standard)
- IS057 (End User Fibre Installation Standard)
-
Site setup and compliance to TMP standards.
-
Select What was tech shown:
- Complete Vehicle Checklist
- Reversing on site
- Towing of Trailers
- Safe Driving Practices
- Load Securing
- Security
- Traffic Management
- Use of Hose Ramps
- Maintenance
-
Tick the following
-
Oil and dipstick
-
Water and Radiator condition
-
Tyre Pressure including Spare Tyre
-
Visibility (e.g. Windscreen/Mirrors)
-
Compliance (WOF/Rego/RUC/COF)
-
Brakes/ Handbrake
-
Lights (Front/Rear/Indicators/Number Plate)
-
Trailer Maintance
-
Technical training included:
- Trenching/Excavation
- Duct Jointing
- Fibre Jointing
- Service Location
- Cable Installation
- Blowing
- Fault Finding
- Copper Jointing
- Tube Breakout
- Reinstatement
- Compaction
- AsBuilt
- Reading/Understanding Plans
- Other
-
Please list Other?
-
List Plant/Equipment trained on:
- Concrete Saw
- Terra Saw
- Chain Trencher
- Excavator/Digger
- Compressor
- Generator
- BOF Gun
- Tools (Hand tools)
- Drills
- Grinder/Multi Tool
- Ladder
- Splicer
- Grundomat
- Stud Finder/ Wall Scanner
- EWP
- Cable Locator
-
What Systems training was done on:
- SimPRO
- Connect App
- WebMaps
- Office 365
- iAuditor
- IMS Team Up
- CamScan
- Share Point
-
Please provide brief description of the training
-
Were you (the auditor) inducted properly before entering the site in the following information?<br>1. Tasks to be performed, the risks associated & the controls in place.<br>2. Checked your PPE if complete<br>3. First aiders on site, first aid kit and fire extinguisher location (rego if in vehicle).<br>4. Exact location of evacuation point, nearest emergency center address.
-
Provide details of the coaching onsite and/or additional training required.
-
Do you believe the crew can perform their tasks for this job and have all appropriate training.
-
Provide details of the coaching onsite and/or additional training required.
-
Select additional Training Required
- TC1
- Working at Heights
- Operating an EWP
- First Aid
- Confined/Restricted Space
- Concrete Saw Competency
- Terrasaw Competency
- Use of a Locator
- Trencher Competency
- Splicing
- Digger
- Blowing
- Asbestos Awareness
- Other
-
Please Specify Other
-
Has the site management and setup been observed to be... <br>Consider the following: <br>1. Work Isolation <br>2. Traffic and pedestrian management <br>3. Safe and efficient site layout
-
Stop work and ensure site is made safe!
-
Provide Details of the risk, coaching on site and additional training required.
-
Have the crew reviewed/signed the JSA, relating to their work, and are the appropriate risk control methods being put in place?
-
Provide details of the coaching onsite and additional training required.
-
Has the Site Risk Assessment document (Site Plan) been correctly completed relative to the specific job?
-
Provide details of the coaching onsite and additional training required.
-
Is the crew compliant with current Health, Safety & Environmental procedures & policies?
-
Provide Details of the risk, coaching on site and additional training required.
-
Attach Health, Safety & Environmental non-compliance photos
-
Stop work and ensure site is made safe!
-
Is all required PPE available, in good condition and being used correctly.
-
Stop work and ensure site is made safe!
-
Provide details of the coaching onsite and additional training and/or remedial action required for PPE.
-
Do the crew have all the tools and equipment they need to perform their task safely.
-
Please list tools required or in need of replacement or repair?
-
Observe the vehicles on site for the following: 1. Safe to operate including WOF/COF and Rego 2. Presentable and Tidy 3. Equipment is secure and secured properly 4. Parked appropriate and safely
-
Provide details of the coaching onsite and training and/or remedial action required.
-
Have you observed exceptional behavior that warrants recognition? (Please note the behavior)
-
Photos of the behavior.
-
Are there any High Risk activities taking place onsite?
-
Concrete Saw Cutting.
-
Is Concrete Cutting activity:
-
Provide details of the coaching onsite and additional training and/or remedial action required.
-
Provide Photos of at risk or significant at risk activity.
-
Terrasaw Cutting
-
Is Terrasaw Cutting activity:
-
Provide details of the coaching onsite and additional training and/or remedial action required.
-
Provide Photos of at risk or significant at risk activity.
-
Is Mechanical Trenching activity:
-
Is Mechanical Trenching activity:
-
Provide details of the coaching onsite and additional training and/or remedial action required.
-
Provide Photos of at risk or significant at risk activity.
-
Digger Operation
-
Is Digger Operation activity:
-
Provide details of the coaching onsite and additional training and/or remedial action required.
-
Provide Photos of at risk or significant at risk activity.
-
Working in the vicinity of services while trenching Manually or Mechanically
-
Is the Working in the vicinity of services while trenching activity:
-
Provide details of the coaching onsite and additional training and/or remedial action required.
-
Provide Photos of at risk or significant at risk activity.
-
Location of Services (Cat/Genny)
-
Is the Location of Services (Cat/Genny) activity:
-
Provide details of the coaching onsite and additional training and/or remedial action required.
-
Provide Photos of at risk or significant at risk activity.
-
Use of Compactor
-
Is Compacting activity:
-
Provide details of the coaching onsite and additional training and/or remedial action required.
-
Provide Photos of at risk or significant at risk activity.
-
Use of Drill
-
Is Drilling activity:
-
Provide details of the coaching onsite and additional training and/or remedial action required.
-
Provide Photos of at risk or significant at risk activity.
-
Fibre Blowing and/or use of compressor
-
Is Fibre Blowing and/or use of compressor activity:
-
Provide details of the coaching onsite and additional training and/or remedial action required.
-
Provide Photos of at risk or significant at risk activity.
-
Is Working at height activity:
-
Is Working at height activity:
-
Provide details of the coaching onsite and additional training and/or remedial action required.
-
Provide Photos of at risk or significant at risk activity.
-
Working with suspected Asbestos
-
Is Working with suspected Asbestos activity:
-
Provide details of the coaching onsite and additional training and/or remedial action required.
-
Provide Photos of at risk or significant at risk activity.
-
Is Working in a confined/restricted space activity:
-
Is Working in a confined/restricted space activity:
-
Provide details of the coaching onsite and additional training and/or remedial action required.
-
Provide Photos of at risk or significant at risk activity.
-
Is Working in High Traffic areas activity:
-
Is Working in High Traffic areas activity:
-
Provide details of the coaching onsite and additional training and/or remedial action required.
-
Provide Photos of at risk or significant at risk activity.
-
Is Working on a sloping site activity:
-
Is Working on a sloping site activity:
-
Provide details of the coaching onsite and additional training and/or remedial action required.
-
Provide Photos of at risk or significant at risk activity.
-
Any other potentially high risk activities
Activity:
-
What is the activity?
-
Is Activity:
-
Provide details of the coaching onsite and additional training and/or remedial action required.
-
Provide Photos of at risk or significant at risk activity.
-
Would you like to complete a live Quality Assessment
Audit Type
-
What part of the work is the Audit completed for?
- Civil ISB
- Civil OSB
- Reinstament
- Fibre Blowing
- External Building Cabling
- Internal Building Cabling
- Fibre Splicing and Managment
- Connection
Inside Boundary Civil
-
Please select all methods completed
- Trench in Soft Surfce
- Trench in Hard Surface
- Slot Trench
- Fenceline
- Conduit Running
- Thrusting
- Undermining
- Ped Installation
- Drop installation
-
Soft Trench Depth to Standard?
-
Soft Surface Reinstatement to Standard? (Grass seed and Topsoil)
-
Hard Trench Depth to Standard?
-
Hard Trench Cut Straight?
-
Hard Trench Temp Reinstatement?
-
Hard Trench Permanent Reinstatement Completed?
-
Hard Trench Permanent Reinstatement To Standard?
-
Is the Slot Trench to Standard?
-
Is the Slot Trench Straight?
-
Slot Trench Depth to Standard?
-
Is the Slot Trench Reinstatement to Standard? (If not reinstated please Fail)
-
Has the Fenceline been installed to Standard?
-
Is Fenceline at correct height?
-
Correct spacing between P-Clips? (300mm)
-
Has stainless steel screws been used?
-
Is the transition completed to standard?
-
Have the use of conduit been approved?
-
Is the conduit on fence installed to Standard?
-
Correct spacing between saddles? (600mm)
-
Stainless Steel Saddles and Screws used?
-
All connections on ISB conduit properly connected?
-
Is the Thrust at correct depth? (450mm)
-
Is the reinstatement for entry and exit holes to Standard?
-
Is the Undermine completed to standard?
-
Is the Undermine at correct depth?
-
Is there evidence of Service Location?
-
Is the Ped installed to standard
-
Have the Ped been labeled?
-
Is drop off's installed to standard?
Drop Off
-
Have Drop been installed to Standard?
-
Is the Marker Post/ Pave-stone installed to standard?
Outside Boundary Civil
-
Please select all methods completed
- Trench in Hard Surface
- Trench in Soft Surface
- Direct Transition to Fencline
- Undermine
- Conduit Connection Wall/Fence
- Tube Breakout
-
Soft Trench Depth to Standard?
-
Soft Surface Reinstatement to Standard? (Grass seed and Topsoil)
-
Is the Marker Post/ Pave-stone left to Standard?
-
Hard Trench Depth to Standard?
-
Hard Trench Cut Straight?
-
Hard Trench Temp Reinstatement?
-
Hard Trench Permanent Reinstatement Completed?
-
Hard Trench Permanent Reinstatement To Standard?
-
Is the Marker Post/ Pave-stone left to Standard?
-
Has the Fenceline been installed to Standard?
-
Is the transition completed to standard?
-
Is the Marker Post left to Standard?
-
Have the use of conduit been approved?
-
Is the conduit on retaining wall installed to Standard?
-
Correct spacing between saddles? (600mm)
-
Stainless Steel Saddles and Screws used?
-
All connections OSB conduit properly connected?
-
Is the Undermine completed to standard?
-
Is the Undermine at correct depth?
Reinstatement
-
Has the permanent Reinstatement been completed to Standard?
-
Has council Standards been adhered to?
-
All cones removed from site
-
Is the marker post/ pave-stone been left to standard?
Fibre Blowing
-
Have fibre blowing standards been followed?
-
Is the slack managed and sufficient?
-
Gas block installation?
-
ETP Installation and secure on house side?
External Building Cabling
-
Please select all methods completed
- ETP Installation
- Conduit Installation
- Exposed Cable Run
-
Is ETP Installation Completed to standard?
-
It the ETP secured appropriately
-
Is fibre Management as per standard?
-
Are all screws present and fitted?
-
Is the conduit on building installed to standard?
-
Correct spacing for saddles used on building? (600mm)
-
Stainless Steel Saddles and Screws used?
-
All connections on External conduit properly connected?
-
Is the External Exposed Cable installed to standard?
-
Has the exposed cable P-clip spacing been adhered to?
-
Has stainless steel screws been used?
-
Have all penetrations into property been completed to standards?
Internal Building Cabling
-
Please select Internal cabling methods?
- Back to back
- Capping
- Underfloor
- Ceiling
- Conduit
-
Has the installation Standards been adhered to?
-
Is the cable covered according to standard?
-
Is the capping installed to standard?
-
Is the capping secured securely?
-
Are all bends/corners and ends capped with covers?
-
Is the capping cover securely fitted?
-
Is the capping clean and tidy?
-
Is the cable run in the underfloor per standard?
-
Is the cable securely fastened and not hanging on the floor?
-
Is securing clips installed max 600mm apart?
-
Is the cable run in the ceiling per standard?
-
Is the cable securely fastened and not hanging loose?
-
Is securing clips installed max 600mm apart?
-
Has the internal conduit run been approved?
-
Is the internal conduit installed to standard?
-
Correct spacing of the saddles on internal conduit?
-
All connections on Internal conduit properly connected?
-
Has the penetration been sealed appropriately?
Fibre Splicing and Management
-
Please select Splicing and Management locations?
- Ericsson Cabinet
- Shape Cabinet
- Pedestal
- CDP
- ETP
- ITP
- ONT Back Plate
-
Is cable routing standard in Ericsson cabinet followed?
-
Is the splice to standard with pictail in Ericsson cabinet?
-
Is the management of the fibre in the tray in the Ericsson cabinet to standard?
-
Is cable routing standard in Shape cabinet followed?
-
Is the splice to standard in Shape cabinet?
-
Is the correct tray used in Shape cabinet?
-
Is the management of the fibre in the tray in the Shape cabinet to standard?
-
Is the Ped lid secured?
-
Is the tube for the fibre installed in the correct position?
-
Is cable routing standard in Ped been followed?
-
Have the correct Tray been used in Ped?
-
Is the splicing standard in Ped adhered to?
-
Is the management of the fibre in the Ped tray to standard?
-
Is the cable routing standard in CDP followed?
-
Is the fibre management standard for the CDP followed?
-
Is the splicing in CDP standard adhered to?
-
Is the fibre management standard for the ETP followed?
-
Is the splicing in ETP standard adhered to?
-
Is a gas block installed?
-
Is the fibre management standard for the ITP followed?
-
Is the splicing in ITP standard adhered to?
-
Is connector installed in the ITP to standard?
-
Is the fibre management standard for the back plate followed?
-
Is the splicing in back plate standard adhered to?
-
Is All areas clear of fibre waste?
Connection
-
Is the Customer or End user present?
-
Is the customer happy with the installation?
-
Is the location of ONT and cabling installed to customers expectations?
-
Was the crew friendly and helpful?
-
Did the customer understand the crew and did they use plain English?
-
Feed back from the customer?
-
Is the ONT installed to standard?
-
Is the Connection standing up and working correctly?
-
Did the tech complete all the correct documentation?
-
All photos uploaded to simPRO?
-
Is the phone integration completed as per standard?
-
Have the site been left in a clean and tidy manor?
-
In General the site Health and Safety, and actions/behaviors were
Audit Type
-
What part of the work is the Audit completed for?
- Civil ISB
- Civil OSB
- Reinstament
- Fibre Blowing
- External Building Cabling
- Internal Building Cabling
- Fibre Splicing and Managment
- Connection
Inside Boundary Civil
-
Please select all methods completed
- Trench in Soft Surfce
- Trench in Hard Surface
- Slot Trench
- Fenceline
- Conduit Running
- Thrusting
- Undermining
- Ped Installation
- Drop installation
-
Soft Trench Depth to Standard?
-
Soft Surface Reinstatement to Standard? (Grass seed and Topsoil)
-
Hard Trench Depth to Standard?
-
Hard Trench Cut Straight?
-
Hard Trench Temp Reinstatement?
-
Hard Trench Permanent Reinstatement Completed?
-
Hard Trench Permanent Reinstatement To Standard?
-
Is the Slot Trench to Standard?
-
Is the Slot Trench Straight?
-
Slot Trench Depth to Standard?
-
Is the Slot Trench Reinstatement to Standard? (If not reinstated please Fail)
-
Has the Fenceline been installed to Standard?
-
Is Fenceline at correct height?
-
Correct spacing between P-Clips? (300mm)
-
Has stainless steel screws been used?
-
Is the transition completed to standard?
-
Have the use of conduit been approved?
-
Is the conduit on fence installed to Standard?
-
Correct spacing between saddles? (600mm)
-
Stainless Steel Saddles and Screws used?
-
All connections on ISB conduit properly connected?
-
Is the Thrust at correct depth? (450mm)
-
Is the reinstatement for entry and exit holes to Standard?
-
Is the Undermine completed to standard?
-
Is the Undermine at correct depth?
-
Is there evidence of Service Location?
-
Is the Ped installed to standard
-
Have the Ped been labeled?
-
Is drop off's installed to standard?
Drop Off
-
Have Drop been installed to Standard?
-
Is the Marker Post/ Pave-stone installed to standard?
Outside Boundary Civil
-
Please select all methods completed
- Trench in Hard Surface
- Trench in Soft Surface
- Direct Transition to Fencline
- Undermine
- Conduit Connection Wall/Fence
- Tube Breakout
-
Soft Trench Depth to Standard?
-
Soft Surface Reinstatement to Standard? (Grass seed and Topsoil)
-
Is the Marker Post/ Pave-stone left to Standard?
-
Hard Trench Depth to Standard?
-
Hard Trench Cut Straight?
-
Hard Trench Temp Reinstatement?
-
Hard Trench Permanent Reinstatement Completed?
-
Hard Trench Permanent Reinstatement To Standard?
-
Is the Marker Post/ Pave-stone left to Standard?
-
Has the Fenceline been installed to Standard?
-
Is the transition completed to standard?
-
Is the Marker Post left to Standard?
-
Have the use of conduit been approved?
-
Is the conduit on retaining wall installed to Standard?
-
Correct spacing between saddles? (600mm)
-
Stainless Steel Saddles and Screws used?
-
All connections OSB conduit properly connected?
-
Is the Undermine completed to standard?
-
Is the Undermine at correct depth?
Reinstatement
-
Has the permanent Reinstatement been completed to Standard?
-
Has council Standards been adhered to?
-
All cones removed from site
-
Is the marker post/ pave-stone been left to standard?
Fibre Blowing
-
Have fibre blowing standards been followed?
-
Is the slack managed and sufficient?
-
Gas block installation?
-
ETP Installation and secure on house side?
External Building Cabling
-
Please select all methods completed
- ETP Installation
- Conduit Installation
- Exposed Cable Run
-
Is ETP Installation Completed to standard?
-
It the ETP secured appropriately
-
Is fibre Management as per standard?
-
Are all screws present and fitted?
-
Is the conduit on building installed to standard?
-
Correct spacing for saddles used on building? (600mm)
-
Stainless Steel Saddles and Screws used?
-
All connections on External conduit properly connected?
-
Is the External Exposed Cable installed to standard?
-
Has the exposed cable P-clip spacing been adhered to?
-
Has stainless steel screws been used?
-
Have all penetrations into property been completed to standards?
Internal Building Cabling
-
Please select Internal cabling methods?
- Back to back
- Capping
- Underfloor
- Ceiling
- Conduit
-
Has the installation Standards been adhered to?
-
Is the cable covered according to standard?
-
Is the capping installed to standard?
-
Is the capping secured securely?
-
Are all bends/corners and ends capped with covers?
-
Is the capping cover securely fitted?
-
Is the capping clean and tidy?
-
Is the cable run in the underfloor per standard?
-
Is the cable securely fastened and not hanging on the floor?
-
Is securing clips installed max 600mm apart?
-
Is the cable run in the ceiling per standard?
-
Is the cable securely fastened and not hanging loose?
-
Is securing clips installed max 600mm apart?
-
Has the internal conduit run been approved?
-
Is the internal conduit installed to standard?
-
Correct spacing of the saddles on internal conduit?
-
All connections on Internal conduit properly connected?
-
Has the penetration been sealed appropriately?
Fibre Splicing and Management
-
Please select Splicing and Management locations?
- Ericsson Cabinet
- Shape Cabinet
- Pedestal
- CDP
- ETP
- ITP
- ONT Back Plate
-
Is cable routing standard in Ericsson cabinet followed?
-
Is the splice to standard with pictail in Ericsson cabinet?
-
Is the management of the fibre in the tray in the Ericsson cabinet to standard?
-
Is cable routing standard in Shape cabinet followed?
-
Is the splice to standard in Shape cabinet?
-
Is the correct tray used in Shape cabinet?
-
Is the management of the fibre in the tray in the Shape cabinet to standard?
-
Is the Ped lid secured?
-
Is the tube for the fibre installed in the correct position?
-
Is cable routing standard in Ped been followed?
-
Have the correct Tray been used in Ped?
-
Is the splicing standard in Ped adhered to?
-
Is the management of the fibre in the Ped tray to standard?
-
Is the cable routing standard in CDP followed?
-
Is the fibre management standard for the CDP followed?
-
Is the splicing in CDP standard adhered to?
-
Is the fibre management standard for the ETP followed?
-
Is the splicing in ETP standard adhered to?
-
Is a gas block installed?
-
Is the fibre management standard for the ITP followed?
-
Is the splicing in ITP standard adhered to?
-
Is connector installed in the ITP to standard?
-
Is the fibre management standard for the back plate followed?
-
Is the splicing in back plate standard adhered to?
-
Is All areas clear of fibre waste?
Connection
-
Is the Customer or End user present?
-
Is the customer happy with the installation?
-
Is the location of ONT and cabling installed to customers expectations?
-
Was the crew friendly and helpful?
-
Did the customer understand the crew and did they use plain English?
-
Feed back from the customer?
-
Is the ONT installed to standard?
-
Is the Connection standing up and working correctly?
-
Did the tech complete all the correct documentation?
-
All photos uploaded to simPRO?
-
Is the phone integration completed as per standard?
-
Have the site been left in a clean and tidy manor?
Personnel
-
Personnel
-
Comments on the Audit
-
Audited By: