Title Page
-
Client
-
Location
-
Site Address:
-
Conducted on
-
Prepared by
-
Personnel
Quality Assurance
Outside Boundary:
-
Please select works done
- Civil
- Reinstatement
- MDU
- SDU
- N/A
-
Please Continue to Next Section
-
Trench in Soft Surface
-
Please Add Photos
-
Notes:
-
Trench in Hard Surface
-
Please Add Photos
-
Notes:
-
Have the Drop off's/Hand Hole/Manhole been installed to Client Standards
-
Please Add Photos
-
Notes:
-
Hard Surface Reinstatement
-
Please Add Photos
-
Notes:
-
Soft Surface Reinstatement
-
Please Add Photos
-
Notes:
-
Aerial Works
-
Please Add Photos
-
Notes:
-
Have the Drop off's/IFDB/FAT been installed to Client Standards
-
Please Add Photos
-
Notes:
-
Surface Mounting/Pole Mounting
-
Please Add Photos
-
Notes:
Inside Boundary:
-
Please Select Works done
- Civil
- Reinstatement
- MDU
- SDU
- N/A
-
Please Continue to Next Section
-
Trench in Soft Surface
-
Please Add Photos
-
Notes:
-
Microslot Cut
-
Please Add Photos
-
Notes:
-
Trench in Hard Surface
-
Please Add Photos
-
Notes:
-
Surface Mounting
-
Please Add Photos
-
Notes:
-
Pedestal/Manhole/Handhole
-
Please Add Photos
-
Notes:
-
Drop offs
-
Please Add Photos
-
Notes:
-
Hard Surface Reinstatement
-
Please Add Photos
-
Notes:
-
Soft Surface Reinstatement
-
Please Add Photos
-
Notes:
-
Aerial Works
-
Please Add Photos
-
Notes:
-
Surface Mounting/Cabling
-
Please Add Photos
-
Notes:
-
Has the FTP been installed correctly?
-
Please Add Photos
-
Notes:
-
Has Fibre Management at FTP's/FAT been laid correctly?
-
Please Add Photos
-
Notes:
-
Has the ONT been installed correctly?
-
Please Add Photos
-
Notes:
-
Has the Fibre at the ONT been laid correctly?
-
Please Add Photos
-
Notes:
-
Has the VoIP connected to existing phone line and / or RJ45 Jack Installed?
-
Please Add Photos
-
Notes:
-
Aerial Works
-
Please Add Photos
-
Notes:
-
Surface Mounting/Cabling
-
Please Add Photos
-
Notes:
-
Has the FTP's/BUDI/IFDB been installed to Client Standards?
-
Please Add Photos
-
Notes:
-
Has Fibre Management at FTP's/BUDI/IFDB been installed correctly?
-
Please Add Photos
-
Notes:
-
Have Draw tapes been left for cable hauls?
-
Please Add Photos
-
Notes:
Audit Results:
-
Does the Asbuilt/CCR match works carried out onsite:
-
Please Add Photos
-
Notes:
-
Site Cleanliness:
-
Please Add Photos
-
Notes:
-
Does the Site Pass or Fail the QA
-
Please Select areas affected and who completed works
- ISB
- OSB
- Civil
- Cabling/Fibre Jointing
- Reinstatement
-
Notes for improvement or acknowledgement
-
Crew to discuss with Manager on how to rectify NCR and further training requirements if applicable
Inspected By:
-
Audited By:
-
Signature: