Information

  • TECHNICIAN NAME

  • INSTALLING COMPANY

  • CONDUCTED ON

  • LOCATION
  • INSPECTORS NAME

Property Details

  • EXTERNAL FINISH

  • STATE TYPE OF FINISH

  • PROPERTY TYPE

  • STATE PROPERTY TYPE

  • PROPERTY SUB TYPE

  • STATE PROPERTY SUB TYPE

  • PHOTO OF ALL ELEVATIONS

  • PHOTO OF FRONT ELEVATION

  • PHOTO OF LEFT ELEVATION

  • PHOTO OF RIGHT ELEVATION

  • PHOTO OF REAR ELEVATION

  • PHOTO OF FRONT ELEVATION

  • PHOTO OF SIDE ELEVATION

  • PHOTO OF REAR ELEVATION

  • PHOTO OF FRONT ELEVATION

  • PHOTO OF REAR ELEVATION

  • CAVITY WIDTH

Health & Safety

  • PPE AVAILABLE AND USED?

  • FIRST AID KIT AVAILABLE?

  • FIRE EXTINGUISHER AVAILABLE?

Pre Install

  • HAS APPROVAL FORM BEEN SUBMITTED?

  • IS CLIMABEAD BATCH NUMBER AVAILABLE?

  • BATCH NUMBER

  • PRE- INSTALL CHECKS BEEN COMPLETED?

System Set Up

  • How many hoses does vehicle have?

  • CONDITION OF INJECTION PIPE

  • CONDITION OF INJECTION GUN

  • FLOW TEST BEAD GRAM/ GLUE ML

  • ARE ADHESIVE JETS PRESENT AND IN GOOD CONDITION?

  • INJECTION PIPE 1

  • CONDITION OF INJECTION PIPE

  • CONDITION OF INJECTION GUN

  • FLOW TEST BEAD GRAM/ GLUE ML

  • INJECTION PIPE 2

  • CONDITION OF INJECTION PIPE

  • CONDITION OF INJECTION GUN

  • FLOW TEST BEAD GRAM/ GLUE ML

  • ARE ADHESIVE JETS PRESENT AND IN GOOD CONDITION?

  • CONDITION OF SYSTEM BOARD

  • CONDITION OF PRESSURE VESSEL

  • TECHNICIAN UNDERSTAND SYSTEM?

Test Kit

  • IS TEST KIT PRESENT AND IN GOOD CONDITION?

  • TEST SACK

  • SCALES

  • MEASURING JUG

Installation Process

  • SELECT TYPE OF WORKS

  • IS CAVITY BRUSH REQUIRED

  • CAVITY BRUSH FITTED CORRECTLY

  • IS DRILL PATTERN CORRECT?

  • DRILLING COMPLETE ON ELEVATION BEFORE INSTALL?

  • INSTALLATION FILLING PROCESS CORRECT?

  • HAVE VENTILATION REQUIREMENT BEEN MET?

  • ALL INJECTION HOLES BEEN POINTED CORRECTLY?

  • IS CAVITY BRUSH REQUIRED

  • CAVITY BRUSH FITTED CORRECTLY

  • IS DRILL PATTERN CORRECT?

  • DRILLING COMPLETE BEFORE INSTALL?

  • INSTALLATION FILLING PROCESS CORRECT?

  • HAVE VENTILATION REQUIREMENT BEEN MET?

  • ALL INJECTION HOLES BEEN POINTED CORRECTLY?

Equipment

  • DRILL CONDITION?

  • LADDER CONDITION?

  • TRANSFORMER CONDITION?

  • EXTENSION LEAD CONDITION?

Access Lance Kit

  • ACCESS LANCE PRESENT?

  • IS ACCESS LANCE IN GOOD CONDITION?

Post Install

  • POST INSTALL CHECKS BEEN COMPLETED?

  • HAS SITE BEEN SWEPT DOWN AND CLEANED?

Vehicle

  • VEHICLE REGISTRATION?

  • IS VEHICLE CLEAN AND PRESENTABLE?

  • ARE THEIR ANY DEFECTS ON THE VEHICLE?

  • PHOTO OF EACH SIDE OF VEHICLE/ WORK AREA & CAB

Approval Decision

  • HAS TECHNICIAN DEMONSTRATED REQUIRED KNOWLEDGE OF ALL PRE AND POST INSTALL CHECKS?

  • HAS TECHNICIAN BEEN ABLE TO COMPETENTLY SET UP THE VEHICLE FOR INSTALL INCLUDING CALIBRATION OF EQUIPMENT?

  • HAS TECHNICIAN DEMONSTRATED CUSTOMER CARE SKILLS WITH CUSTOMER AWARE OF ALL OPERATIONS?

  • IS THE TECHNICIAN COMPETENT TO INSTALL CLIMABEAD AS PER BDA AND OPERATION MANUAL WITHOUT SUPERVISION?

Signatures

  • TECHNICIAN NAME AND SIGNATURE

  • INSPECTOR NAME AND SIGNATURE

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.