Title Page
-
Closing Checklist
-
Conducted on
-
Prepared by (Type First Name)
-
Location
undefined
Closing Checklist
-
Lock front door
-
Close roller door
-
Turn off machines
-
Turn off compressor
-
Turn off conveyor belt
-
Clean glass doors
-
Full Clean of T9's (wizard)
-
Full Clean of Bulk (wizard)
-
Clean reject chute
-
Clean Trolleys & bumpers
-
Check walls & doors FOH & Clean if needed
-
Clean windows & ledges & Clean if needed
-
Clean Trolley Bumpers
-
Empty rubbish bins (FOH & BOH)
-
Empty bins at end of T9 & bulk lines
-
Clean kitchen
-
Clean bathroom
-
Wipe down BOH sink
-
Clean FOH sink
-
Wipe down glass doors
-
No dirty water left in buckets
-
Cloths rinsed left to dry
-
Mop BOH floor (where needed)
-
Mop FOH floor (iMop)
-
Empty & rinse dirty water tank
-
Leave lid off dirty water tank
-
Charge batteries
-
Turn off air conditioner & fans
-
Sign out on kiosk
-
Make sure all internal doors are shut and locked
-
Lock back door
Additional information
-
General waste & recycling bin out Monday night.
-
Notes