Section Track - Including SCSR Storage and Refuge Alternative
-
<br>-Do SCSR storage locations have correct number of SCSRs (30)/are all SCRSs in green/signs in every entry/double cone & double diamond & connected to lifeline/are storage boxes in damaged/is there a date board present<br><br><br><br><br><br><br>
-
-RA location properly marked on map
-
-on deployment end 50' clearance or material that can damage RA tent
-
-1 fire extinguisher required at RA (properly punched tag)
-
-operating pager required at RA
-
-check inspection book & gauges (RA must be inspected weekly)
-
-RA must have multi-gas detector & radio in box
-
-"REFUGE" signs in all entries
-
-ensure RA is properly tied in to lifeline with double cone & pig tail (curly)
-
-are there any holes or leakage in stoppings in crosscuts
-
-are crosscuts well rock dusted
-
-is lifeline clean and hung properly/is lifeline incorrectly hung in J hooks or hung above any cables, water lines, air line/missing any cones or man door balls
-
-is walkway clear of obstructions
-
-are track switches properly slagged
-
-at end of track is there a shark fin (this includes track switches) & "STOP END OF TRACK" sign
-
-check all rides at end of track for jack bar, SCSRs (write down serial #s), cleanliness, sand, bell, general condition, number
-
-supply cars chained down/oil car has fire extinguisher properly punched
End of Track to Face
-
-are crosscuts well rock dusted<br><br><br><br><br><br><br><br><br><br>
-
-tram ways watered or calcium down/kept clean of excess coal accumulation
-
-lifeline with cones and reflectors @ every 25'/ man door balls/not hung in J hooks or over cables
-
-man door flags
-
-cables hung on insulated hooks
-
-high voltage cable has hard guarding where equipment passes under
-
-supplies neatly stacked & marked with reflectors sticks
-
-stoppings sealed around edges with no wood exposed/doors shut and latched/no holes in walls/cables passing through walls protected with conduit & sealed
-
-cables passing through walls protected with conduit & sealed
-
-signs DOORS, REFUGE, SCSRs
-
-6' walkway clearance in crosscuts with doors
-
-5 cans or 25 gal. oil or more needs 5 bag rock dust & 1 fire extinguisher properly punched tag
Scoop Charger
-
-ensure that crosscut charging station is in is rock dusted adequately
-
-sign "NO FLAMMABLE MATERIAL" must be hung/resuscitation chart must be present
-
-charging station must have 5 bags of rock dust & a fire extinguisher (hung on rib/properly tagged)
-
-charger cable/jumper cables must be hung
-
-must be rubber shock mat in front of charger/metal behind charger between charger & rib
-
-restraining clamp on cables & packing glands must be tight
-
-fireproof cloth must be hung to the ground & to the wall stopping
-
-charger must be continually vented to the return with no re-circulation
-
-if charging station is in crosscut with man door the door must not be blocked
-
-there should be no flammable material (paper/empty rock dust bags/coal/etc) in the charging station
Emergency Sled
-
-20 posts/wedges/cap pieces/saw/drinking water/axe/500' fire hose/2 brass nozzles/knuckle valve/2" female to female couple/2" brass nipple/2 wrenches/4 way
-
-first aid kit & EMT kit
-
-40 SCSRs (write down serial numbers)
-
-Potty tent (usually located near inby RA)
-
-little MAC (charged/tagged fire extinguisher/stokes basket/back board)
-
-ensure lifeline is tied into emergency sled with double cone & double diamond/ensure lifeline is not hung above cables from load center to dumping point
Load Center
-
-5 bags of rock dust & fire extinguisher properly tagged
-
-high voltage signs front & rear
-
-ground clamp from load center to high voltage car
-
-shock mats all the way around (no dirt on mats)
-
-no flammable material/junk on top of load center
-
-cables hung on insulated hooks & with safety chains
-
-ID tags on each plug/receptacle/breaker (if sealed breaker make sure caps are in place)
-
-no openings into back of plug (bushings or tape)
-
-working phone & pager
-
-escape way map with updated escape ways/RA/load center locations
Sunflo Pump
-
-fire extinguisher hung on rib & properly tagged
-
-shock mat
-
-fire tap off pump
-
-resuscitation chart present
-
-5 bags rock dust
Oxygen & Acetylene Tanks
-
-not located under power cable
-
-not located near or across from RA
-
-not located where they can be hit by equipment
Return
-
-return must be adequately dusted (it is important for dust to be continually run through fan)
-
-ensure lifeline is hung up to loading point
-
-SIGNS man doors/refuge/SCSRs
-
-no supplies/canvas laying in return
-
-no standing water
-
-less than 1% methane
Faces
-
-canvas within 10' of face
-
-less than 1% methane
-
-"UNSUPPORTED ROOF SIGNS" on both sides of canvas
-
-ensure adequately rock dusted
-
-face must be scooped, ensure there is no coal accumulation in face
-
-check roof conditions
Fan
-
-ensure dust is going through fan
-
-no oil leaks & check fire suppression caps
Bolters
-
-no dust behind filter/filter in good shape
-
-no oil leaks or accumulation (coal/dirt/oil/etc)
-
-inspect general condition (lights/hoses/etc)
-
-ensure that the kitchen is clean
-
-cable guides roll freely/not more than five splices in cable
-
-20 min gas checks & machine runners papers
Miner/Loader/Shuttle Car
-
-if hot seat exchange per-op checks must be done within 60 mins
-
-if not hot seat exchange pre-op checks must be performed immediately
-
-must have 10 inches of red reflective tape on ends
-
-no splices within 50' of miner/loader
-
-ensure no oil leaks/lights are in operating condition/check for accumulation/gas checks
-
-rock dusted within 40' of face
-
-proper air (9,000 cfm in last open crosscut)
-
-bits and water sprays should be in proper operating condition
-
-not more than two shuttle cars on ground
Feeder
-
-cleaned & dusted (no coal accumulation in front of feeder/scooped)
-
-fire extinguisher properly tagged
-
-ensure no oil leaks or accumulation
-
-clear walkway
-
-ensure levers are locked out with safety pin through them
Scoop
-
-ensure no accumulation in motor compartment (coal/oil/dirt)
-
-ensure winch rope in good condition (does not have more than two broken strands)
-
-caps on on battery cells
-
-all lids have shocks
-
-ensure insulation over battery terminals
-
-ensure all panic bars/lights/brakes/bell are in working condition
Belt
-
-tail piece guarded & no spillage around roller or walkway
-
-walkways clear
-
-extra structure in first out by crosscut
-
-firetrap within 50' of tail
-
-CO monitor with light & audible not on rib (upper 1/3 & toward middle of entry)
-
-must have air velocity of at least 50' per min
-
-JABCO on both sides of tail with cord running inby with JABCO every 500'
-
-fire taps every 300' with sign at every fire tap
-
-shut off valve signs at every shut off
-
-man door signs at every crosscut with man door
-
-signs for SCSRs & RAs
-
-No material/supplies outby first stopping that is sealed
-
-all man doors closed & latched
-
-belt line must be adequately rock dusted
-
-ensure there are no hot or broken rollers/belt rubbing structure and is trained properly