Title Page
-
Project: CN-01 Muswell Hill 412
-
Conducted on
-
Prepared by
-
Week Number:
-
Week Ending Date:
Site Attendance
Site Attendance W.C Monday
-
Project Manager:
-
Dry Liner
-
Plaster/ Jointer
-
Supervisor
Site Attendance Tuesday
-
Project Manager:
-
Dry Liner
-
Plaster/ Jointer
-
Supervisor
Site Attendance Wednesday
-
Project Manager:
-
Dry Liner
-
Plaster/ Jointer
-
Supervisor
Site Attendance Thursday
-
Project Manager:
-
Dry Liner
-
Plaster/ Jointer
-
Supervisor
Site Attendance Friday
-
Project Manager:
-
Dry Liner
-
Plaster/ Jointer
-
Supervisor
Site Attendance Saturday
-
Project Manager:
-
Dry Liner
-
Plaster/ Jointer
-
Supervisor
Site Attendance Sunday
-
Project Manager:
-
Dry Liner
-
Plaster/ Jointer
-
Supervisor
Site Report
-
Has the relevant toolbox talk been carried out?
-
Has there been any issue with Health and Safety compliance?
-
Are the areas clean, tidy and clear of all trips, slips and falls?
-
Why are the areas left unsafe?
Plant
-
Have all podiums, Hop-ups been checked and signed every 7 days?
-
Please select all podiums, Hop-ups that have been signed off fit for use
-
Have all pallet trucks been checked for damage, ensure that all lifting equipment is stored correct and chained up at the end of the day?
Design
-
Are there any outstanding Requests for Information?
-
Is there any critical design information that is required that is holding up progress?
-
Are there any verbal instructions that require action?
-
What verbal instructions require action?
Drylining Works Progress
-
Level:
-
What is the percentage of Fire/Acoustic ceilings complete
-
What is the percentage of 1st fix partitioning complete
-
What is the percentage of 2nd fix partitioning complete
-
What is the percentage of 1st fix ceilings complete
-
What is the percentage of 2nd fix ceilings complete
-
What is the percentage of plastering/ tape jointing complete
Comments
-
Date:
-
Comments:
-
Signed: