Title Page
-
Site conducted
-
Conducted on
-
Prepared by
-
Plot number
Dry lining walls
Prepare And Plan
-
Confirm Specification
-
Confirm Drawing
Pre-installation check
-
Check if all GR lines/FFL are visible and clearly marked
1st Fix - Stud and board one side
-
Check Top and Bottom track are correct and the fixings right type, installed at the correct centres, and in the correct configuration (I.e. staggered)
-
Check that the flat plate is installed where it is required.
-
Check that the vertical studs, position and fixings are correct.
-
Check the Fire/Acoustic ceiling build in the correct order and spec.
-
Check stud work is cut within the deflection head detail.
-
Check the noggins/patresses are installed for radiators etc. Note significant items may require structural engineers advice on sizing.
-
Check the door openings are to the correct width and height with timber ground inserts around door openings.
-
Check service openings formed to drawn dimensions.
-
Check the board type, thickness and number of layers.
-
Check board fixings are correct type and at correct centres in accordance with the manufacturers guidance.
Complete for Quality
-
Work area cleaned