Coastal Mechanical Safety Compliance Audit
-
Job Site Name
-
General Contractor
-
Job Site/Work Order Number
-
Prepared by
-
Location
-
Conducted on
-
Number of Employees on Site
-
Trades on Site
GENERAL CONDITIONS
-
Red Book, Green Book and SDS on site and current?
-
Posters correctly posted for all employees to see?
-
First Aid Kits on site and adequately stocked based on the crew size?
-
PTP's and/or JSA/JHA's Completed?
-
Completed prior to work starting
-
Signed off prior to work starting
Personal Protective Equipment (PPE)
-
Sufficient PPE supplies for the site?
-
Adequate COVID-19 PPE Supplies?
-
Face Coverings?
-
Hand Sanitizer?
-
Disinfectant Wipes?
-
Correct PPE being used for the appropriate task?
-
Hard Hat
-
ANSI approved safety glasses
-
Serviceable and worn properly
-
Reflective vest or high visibility shirt
-
Gloves being worn while handling tools or equipment
-
Face Shield
-
Dust mask/respirator Face Covering
-
Ear plugs/hearing protection if required
-
Additional information
Water supplies
-
Adequate water supplies based on crew size on site?
-
Individual water coolers with bottle water
-
Water container cleaned and sterilized daily
-
Seal taped off with the date and initials written in marker
-
Adequate disposable cups
-
Trash receptacle nearby for waste cups
-
Additional information
Hand and Power Tools
-
Corded power tools have ground prong if not Double Insulated? 1926.302(a)(1)
-
Drills for concrete have vacuum attachment and working properly?
-
Manufacturer guards in place and not modified? 1926.300(b)(1)
-
Corded Tools and cords not ran through or in standing water?
-
Electrical cords in good condition and free from cuts and exposed wires?
-
Tools used for their intended purpose?
-
Tools when not in use are staged properly? (Not hanging by cords)
-
Electrical extension cords are at least 12-GA?
-
Extension cords routed not to cause a tripping hazard?
Housekeeping and Material Storage
-
Material out of common walkways? 1926.250(a)(3)
-
Material away from ledges and stairways? 1926.250(b)(1)
-
Debris cleaned regularly and removed to a central location?
-
Walkways and travel areas clear and free from tripping hazards? 1926.250(d)
-
Floor penetrations greater than 2" diameter securely covered? 1926.501(b)(4)(ii)
-
Overall work area clear of excessive debris and trash?
Ladders
-
Are ladders being used on site?
-
Ladder inspections completed and ladders signed off daily?
-
Inspection tag dated and initialed 1926.1053(b)(15)
-
Proper ladder safety rules being followed?
-
Correct ladder for the job? 1926.1053(b)(4)
-
Ladder being used in the configuration it was designed? 1926.1053(b)(4)
-
Ladder placed on stable surface? 1926.1053(b)(6)
-
Area around the ladder clear of debris? 1926.1053(b)(9)
-
Extension ladder being used?
-
Ladder secured at top and bottom to prevent displacement? 1926.1053(b)(6)
-
Top extends 3' above the landing? 1926.1053(b)(1)
-
Proper 4:1 ratio maintained? 1926.1053(b)(5)(i)
-
Additional information
Fall Protection 1926.500
-
Are there areas being worked where fall protection is required
-
Proper fall protection rules being followed?
-
Adequate anchor point capable of supporting 5,000 LBS?
-
Fall protection equipment in good condition?
-
Harness inspected monthly
-
No excessive wear or corrosion
-
Retractable lifelines free from damage and operate correctly
-
All snap rings operate freely
-
Lanyards inspected and are not frayed or show signs of excessive wear
-
Lifelines are secured correctly
Critical Tasks
-
Critical Tasks taking place on site?
Excavations
-
Excavations on site?
-
Excavation daily check completed?
-
Less than 4 feet
-
Greater than four feet
-
Properly Sloped
-
Barricaded properly
-
Trench ladder within 25 feet of workers
-
Trench box (if used) in proper placement
-
Additional information
Crane Lift
-
Is there a Crane lift on site?
-
Critical Lift?
-
Crane Lift packet complete?
-
Lift Plan
-
Operator CCO card
-
Signalman/Rigger certification card
-
Annual inspection for crane to be used
-
Daily inspection of the crane
-
Letter for verification the operator and signal/rigger are qualified
-
Letter for drug screen
-
Manuals and charts in the crane
-
Anti two blocking device present and operable
-
All slings and rigging certified and in good condition
-
Slings and rigging inspected
-
Additional information
-
Add media
Confined space
-
Is there Confined Space work on the site?
-
Workers trained in the specific confined space
-
Non-permit required
-
Permit required
-
4 gas meter present
-
Adequate ventilation for fresh air
-
permit posted
-
Rescue plan
-
Appropriate signage
-
Additional information
-
Add media
Demolition
-
Is there any demolition work on site?
Welding Safety/Compressed Gas Cylinders 1926.350
-
Are compressed gas cylinders on site?
-
Oxygen separated from Fuel gas or combustible materials by at least 20' or fire barrier 5' high with 1/2hr rating? 1926.350(a)(10)
-
Valve protection cap in place if not being used? 1926.350(a)(1)
-
Cylinders secured from tipping over? 1926.350(a)(7)
-
Located in storage cage?
-
Fire extinguisher within 25'?
-
Proper shade for protective eye wear?
-
Insulated gloves being used for hot work operations?
-
Is there hot work present on site?
-
Hot work taking place in an occupied structure
-
Area cleared of flammable/combustible materials
-
Fire blankets required or used
-
Hot work permit present
-
Fire extinguisher in the immediate area
-
Trained and dedicated fire watch person present
-
Hot work equipment in good condition
-
Additional information
Meetings
-
Meeting with CMS Site supervision?
-
Meeting with the General Contractor site supervision?
-
Meeting with Subcontractor supervision?
Injury information
-
Reported injuries?
-
Near misses onsite?
-
Safety violations/write-ups?
-
Additional information
-
Safety training conducted?
-
Sign in sheet of training completed
General Remarks or Comments
-
Overall site in compliance with OSHA regulations and CMS Safety policy?
-
General remarks and comments
-
Pictures of good practices.
-
Pictures of issues or areas requiring additional attention.
-
Signature of person conducting audit.
-
Signature of site supervisor/PM