Information
-
Project Name
-
Repair Date
-
Supervisor Name
-
Painter Name
-
Location (WTG No.)
HSE check
-
All personnel on site complete toolbox talk
-
All personnel equipped with proper PPE to complete the work
-
All personnel familiar with risk assessment & method statement
General Information
Drawings
-
Detail Parts of TP
Environmental Condition
-
Humidity (%)
-
Air Temparature (°C)
-
Delta T
Product
-
Product Name
-
Serial Number
-
Date of Expire
Coating Repair
- Repair Item
-
Item No.
-
Location or Area
-
Damage Severity
- A - Topcoat intact
- B - Intermediate layer is showing
- C - Base layer is showing
- D - Bare Steel is showing
-
Coating Condition Before Repair
-
Coating Condition After Repair
-
Dry Film Thickness (microns)
Housekeeping
General Housekeeping
-
Is there any paint on light fittings or other items?
-
Are all areas free from paint splatter, over painting and all non painted times clean?
-
All items that have been removed; hinges, handles and other items been reinstalled?
-
Are there any incomplete items or works?
-
Has all left over paint and materials been stored neatly in designated area?
-
Has site been left clean/tidy and all rubbish removed?