Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Item 11 - Materials delivered to site
-
Has all material required been delivered as per delivery programme?
-
Notes
Item 12 - Condition of materials as delivered to site
-
Transport and delivery process suitable
-
Quality of material prior to installation acceptable
-
Notes
Item 13 - Quality of installation work
-
Has the work been carried out to the customers satisfaction?
-
Notes
Item 14 - Supervision
-
Is the customer happy with the quality of on site supervision?
-
Is the customer happy with the level of on site supervision?
-
Notes
Item 15 - inspections
-
Were regular planned quality of work inspections carried out whilst work was in progress?
-
Notes
Item 16 - Documentation and drawings
-
Drawings on site and suitable
-
Specifications on site and suitable
Item 17 - General comments
-
Notes
Signatures
-
Auditor's signature
-
Auditee's signature