Title Page

  • Report Number

  • Report date:

  • Prepared by:

  • Location:
  • Client:

  • Instalation type:

  • Peak Power (kWp):

  • Nominal Power (kWn):

  • PV modules number:

  • Inverter number:

VISUAL INSPECTION

PV Modules

  • General visual inspection of solar modules

  • Thermographic recording

  • PV Modules Cleaning

GENERAL INSTALATION - ELETRICAL

  • DC and AC wiring check

  • Checking ground connections

  • Equipment status

GENERAL INSTALATION - MECHANICS

  • Properly sealed and watertight cable entry

INVERTERS

  • Checking connections and tightness on the cables

  • Cable Gland check

  • Visual inspection of the equipment

  • Thermographic recording

PV Distribution Board (QGPV)

  • Equipment and assembly as stipulated in the project

  • AC Cut Check

  • Checking the AC Connection Bus

  • Checking Protection Fuses (if applicable)

  • Testing Protections

  • Retightening of all Connection Points

  • Thermographic recording

OTHER

  • All Cables and Equipment are Correctly Labeled

  • Production Counter is Working Correctly

  • Consumer Meeter is Working Correctly

  • Monitoring System is Working Correctly

  • Router is Working Correctly

MEASUREMENTS

INVERTERS

  • DC CURRENT (A)

  • DC VOLTAGE (V)

  • Isolation (ohm)

PV Distribution Board (QGPV)

  • AC CURRENT (A)

  • AC VOLTAGE (V)

  • Isolation (ohm)

  • Earth Measurements (ohm)

CONCLUSION

  • OBS.

  • End of Audit

  • Team members:

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.