Página de Título

  • Report Number:

  • Client:

  • Location:
  • Report day:

  • Team:

  • Plant type:

  • Peak power (kWp):

  • Nominal Power (kWn):

  • PV modules number:

  • Inverter number:

INSPEÇÃO VISUAL - TESTES

PV Modules Inspection

  • Visual Inspection (degradation, oxidation, cracks, foreign objects, shading, etc.)

  • Thermographic Record

  • Modules cleaning

MECHANICAL INSPECTION

  • Checking the Retightening of Structures and Module Fixing Clips

  • Verification of Correct Fixing of Boards and Inverters

  • Checking the Correct Fixing of the Cable Trays

  • Properly Sealed and Watertight Cable Entries

ELECTRICAL INSPECTION - DC

  • Check String Voltages and Currents

  • MC4 Connectors Properly Crimped and Installed

  • Cable Paths

  • Thermographic Record

  • Insulation Test

ELECTRICAL INSPECTION - AC

  • Visual inspection

  • Checking the Correct Fixing and Condition of the Wiring

  • Cable Paths

  • Checking Earth Connections

  • Thermographic Record

  • Insulation Test

INSPECTION OF INVERTERS

  • Visual inspection

  • Checking Connections and Retightening

  • Cable gland check

  • Checking Earth Connections

  • Thermographic Record

  • Insulation Test

PV Distribution Board (QGPV)

  • Visual inspection

  • AC Cut Check

  • Checking the AC Connection Bus

  • Checking Protection Fuses (if applicable)

  • Retightening of all Connection Points

  • Testing Protections

  • AC Voltage and Current Measurements

  • Thermographic Record

  • Insulation Test

OTHER

  • All Cables and Equipment are Correctly Labeled

  • Production Counter is Working Correctly

  • Consumer Meeter is Working Correctly

  • Monitoring System is Working Correctly

  • Router is Working Correctly

ACCESS

  • Access to the building's roof

  • Access to water point for washing

AC AND DC MEASUREMENTS

    INVERTER
  • Inverter number

DC CURRENTS (A)

  • String 1

  • String 2

  • String 3

  • String 4

  • String 5

  • String 6

  • String 7

  • String 8

  • String 9

  • String 10

  • String 11

  • String 12

  • String 13

  • String 14

  • String 15

  • String 16

  • String 17

  • String 18

  • String 19

  • String 20

DC VOLTAGE (V)

  • String 1

  • String 2

  • String 3

  • String 4

  • String 5

  • String 6

  • String 7

  • String 8

  • String 9

  • String 10

  • String 11

  • String 12

  • String 13

  • String 14

  • String 15

  • String 16

  • String 17

  • String 18

  • String 19

  • String 20

AC VOLTAGE - SIMPLE (V)

  • L1/N

  • L2/N

  • L3/N

AC VOLTAGE - COMPOUND (V)

  • L1/L2

  • L1/L3

  • L2/L3

AC CURRENT (A)

  • L1

  • L2

  • L3

EARTH MEASUREMENTS (OHM)

  • Measurement 1

  • Measurement 2

OBSERVATIONS

  • undefined

CONCLUSION

  • Obs:

  • End of Audit

  • Team members:

  • Responsible for Customer Facilities:

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.