Information
-
Job # / Job Name
-
Conducted on
-
Prepared by
-
Location
-
Document No.
Quality Control Item
JOB PREP
-
Verify all material deliveries
-
Landscaping protected and plywood placed to protect from equipment damage
-
Washing to remove dirt, chalking & contaminants complete
-
All failing paint areas properly scraped & primed
-
Failing caulk removed and or replaced as need (if in contract)
-
Rust spots drilled and primed
JOB PROGRESS
-
No wavy cut lines
-
No ladder marks remaining
-
All areas checked for over spray and cleaned
-
No drips or runs
-
Driveways & walkways broom swept clean
-
All garbage neatly bagged for disposal
-
All masking removed
-
Lifts cleaned and inspected for damage, and called off
-
Sprayers / Power Washers cleaned and returned
JOB COMPLETION
-
Paint cans dated & labeled for color & area use
-
Returns called in for pick up to supplier
-
Completed final walk thru prior to walking with customer
Customer Contact
-
Customer walk thru complete and all areas are satisfactory
-
Customer unable to complete walk thru
- Spoke on the Phone
- Left Message
-
Contact #
-
My signature acknowledges that I have walked this job and have found all workmanship to be of professional quality
-
Foreman's Signature & Date