Information
-
Document No.
-
Floor level
- Base
- Grd
- 1st
- 2nd
- 3rd
- 4th
- 5th
- 6th
- 7th
-
Joinery item
- WC Type 01
- Access WC
- WC Type 02
- WC Type 03
- WC Type 04
-
Conducted on
-
Prepared by:
St. James's Street Commercial Office Joinery Inspection check list
Activities
-
Is area clean and ready to receive joinery item
-
Check walls & floors plumb / level / square
-
Has Confirmation been received that M&E has been tested and commissioned
-
Check M&E works are visually completed
-
Request confirmation that M&E is tested and signed off
-
Check Joinery components / dimensions against Drawings & cutting sheets and check items for any damage<br>
-
Check all catches / hinges are fitted and fully operational
-
Check fitting of Joinery item is in accordance with approved drawings. Ensure Doors / drawers / glass / shelving / mirrors / led lighting are installed correctly and fully operational
-
Check all completed works are clean and free of Abrasions / Burrs / Damage
-
Is area left clean and tidy on completion of installation and Joinery fully protected
-
Signed on behalf of Sub-Contractor
-
Signed on behalf of Main Contractor
Protection
-
Check all protection is fitted
-
Signed on behalf of Sub-Contractor
-
Signed on behalf of Main Contractor
This inspection sheet confirms that the item or area detailed above is 100% completed in line with the current specification, drawings and pre agreed sample panels although still remaining Sub Contractors responsibility until practical completion has been achieved.
-
Signed on behalf of Sub-Contractor
-
Signed on behalf of Main Contractor