Information
-
Document No.
-
Floor level
-
Conducted on
-
Prepared by:
Inspection check list
Activity: Door set installation.
-
Internal hinged doors single - No of Doors:
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
-
Internal hinged doors double - No of Doors:
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
-
Internal Sliding doors single - No of Doors:
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
-
Internal Sliding doors double - No of Doors:
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
-
Check that the structural openings are correct.
-
Check the area is clear of materials and debris and the flooring is protected 50mm short of the walls to allow installation of skirting .
-
Install doors / frames / stops / architraves / trims as approved drawings and as specified in SEC RAMS / H&S Policies.
-
Fire mastics installed in accordance with Fire certification
-
Check the fixings are adequate and mitres are flush fitting
-
Check fixings are below surface.
-
Check free from damage, burrs and abrasions.
-
Signed on behalf of Sub-Contractor
-
Signed on behalf of Main Contractor
Ironmongery Installation
-
All Ironmongery installed as Ironmongery Schedule
-
All lever handles / flush bolts / overhead closers operational
-
All signage fitted to correct positions as approved drawings
-
All cylinder fitted
-
Keys tagged and handed over to Bouygues
-
All ironmongery clear and free of any scratches / damage
-
Signed on behalf of Sub-Contractor
-
Signed on behalf of Main Contractor
Proection
-
Protection fitted to door faces & jambs
-
Protection fitted to lever handles
Activity: install skirting.
-
Check skirting is fixed to line and level.
-
Check internal scribes and external mitre 90 degree<br>
-
Check fixings are below surface.
-
Check free from damage, burrs and abrasions.
-
Signed on behalf of Sub-Contractor
-
Signed on behalf of Main Contractor
This inspection sheet confirms that the item or area detailed above is 100% completed in line with the current specification, drawings and pre agreed sample panels although still remaining Sub Contractors responsibility until practical completion has been achieved.
-
Signed on behalf of Sub-Contractor
-
Signed on behalf of Main Contractor