Information

  • Site conducted

  • Conducted on

  • Prepared by

  • Location
  • Equipment checked

Cold commissioning

    Sungiga
  • SunGiga Number

  • Serial Number Cabinet

  • Serial Number Battery packs

  • Serial Number PCS

  • Serial Number Chiller

  • Serial Number Junction box

  • Choose an answer

  • Is the enclosure in good condition?

  • Please provide pictures

  • Please specify

  • Please provide pictures and/or add comments

  • Are the connections made by the client in good condition?

  • Please provide pictures

  • Please specify

  • Please provide pictures and/or add comments

  • Are the clearances for the Sungiga acceptable?<br>Rear >0.8m<br>Side >0.1m<br>Front at least 1.5m, needed 2.5m for service.

  • Please provide pictures

  • Please specify

  • Please provide pictures and/or add comments

  • Check all the connectors are in good condition. Pull cables and make sure all the connectors are inserted properly.

  • Please provide pictures

  • Please specify

  • Please provide pictures and/or add comments

  • Check the cooling system pipes, there is not any leakage.

  • Please provide pictures

  • Please specify

  • Please provide pictures and/or add comments

  • Torque values for reference

    torque values.jpg
  • Check the torque for the bolted connections on the PCS and busbars. Prove dead before checking the client connections and PCS connections.

  • Please provide pictures

  • Please specify

  • Please provide pictures and/or add comments

  • Check fuses on the front and status of SPD (Surge Protector Device).

  • Please provide pictures

  • Please specify

  • Please provide pictures and/or add comments

  • Check and tight the screw connections in all the components.

  • Please provide pictures

  • Please specify

  • Please provide pictures and/or add comments

  • Open the rear and check that the thermostat is set to 20°C. Check that the fans spin freely and in the right position (air outlet)

  • Check grounding, check continuity between internal earth and between internal and external.

  • Please provide pictures

  • Please specify

  • Please provide pictures and/or add comments

  • Take the MSD (Maintenance Switch Disconnector) and connect it to the bottom battery pack.

  • Is everything fine for the system to be energised?

  • Please do not energise this Sungiga and check for corrective actions to allow energisation.

Hot Commissioning Sungiga

Energisation and devices configuration

  • Make sure that the client circuit breaker is closed and the 230V are arriving to the Sungiga.

  • Please provide pictures

  • Please specify

  • Please provide pictures and/or add comments

  • Close MCCB, DC switch and MCBs on the HVBox (in this order). Is the Screen switching ON?

  • Please provide pictures

  • Please specify

  • Please provide pictures and/or add comments

  • Please connect the internal network on ETH0 (LAN1 on SCU) and the client cable on ETH1 (LAN2 on SCU)

  • Set the IP for the SCU (inner and client networks) as required

  • Set the IP for the PCS and BMU, If there are slave units, please confirm the IPs for slave equipment is right from the SCU screen.

  • Connect to the PCS and change the parameters as required. If there are slave units this will have to be done for all the PCS.

  • Upgrade the software to all the equipment as required. Take a picture of the last software installed

  • Check that the chiller settings are correct

Protections checks

  • Check smoke and heat sensors (one by one), make sure the alarm is visible on the screen.

  • Please provide pictures

  • Please specify

  • Please provide pictures

Testing with SCU

  • Apply setpoints for charge and discharge using the screen. Make sure that the system responds to the orders.

  • Please provide pictures

  • Please specify

  • Please provide pictures and/or add comments

  • While the system is operating, press the emergency button, the system should stop

  • Please provide pictures and/or add comments

  • Please specify

  • Please provide pictures

  • Is the EMS under scope

  • Confirm that the EMS can see all parameters of the batteries

  • Confirm that EMS can charge/discharge battery and provide services as per client's request

  • Please proceed to next page

  • Is the enclosure in good condition?

  • Please provide pictures

  • Please specify

  • Please provide pictures and/or add comments

  • Are the connections made by the client in good condition?

  • Please provide pictures

  • Please specify

  • Please provide pictures and/or add comments

  • Are the clearances for the Sungiga acceptable?<br>Rear >0.8m<br>Side >0.1m<br>Front at least 1.5m, needed 2.5m for service.

  • Please provide pictures

  • Please specify

  • Please provide pictures and/or add comments

  • Check all the connectors are in good condition. Pull cables and make sure all the connectors are inserted properly.

  • Please provide pictures

  • Please specify

  • Please provide pictures and/or add comments

  • Check the cooling system pipes, there is not any leakage.

  • Please provide pictures

  • Please specify

  • Please provide pictures and/or add comments

  • Torque values for reference

    torque values.jpg
  • Check the torque for the bolted connections on the PCS and busbars. Prove dead before checking the client connections and PCS connections.

  • Please provide pictures

  • Please specify

  • Please provide pictures and/or add comments

  • Check fuses on the front and status of SPD.

  • Please provide pictures

  • Please specify

  • Please provide pictures and/or add comments

  • Check and tight the screw connections in all the components.

  • Please provide pictures

  • Please specify

  • Please provide pictures and/or add comments

  • Open the rear and check that the thermostat is set to 20°C. Check that the fans spin freely and in the right position (air outlet)

  • Check grounding, check continuity between internal earth and between internal and external.

  • Please provide pictures

  • Please specify

  • Please provide pictures and/or add comments

  • Take the MSD and connect it to the bottom battery pack.

  • Is everything fine for the system to be energised?

  • Please do not energise this Sungiga and check for corrective actions to allow energisation.

Hot Commissioning Sungiga

Energisation and devices configuration

  • Make sure that the client circuit breaker is closed and the 230V are arriving to the Sungiga.

  • Please provide pictures

  • Please specify

  • Please provide pictures and/or add comments

  • Close MCCB, DC switch and MCBs on the Junction box (in this order)

  • Please provide pictures

  • Please specify

  • Please provide pictures and/or add comments

  • Set the IP for the PCS and BMU as required as per slave number

  • Connect to the PCS and change the parameters as required.

  • Software upgrade on BCU can be done from SCU unit

  • Upgrade the Software of the BCU

Protections checks

  • Check smoke and heat sensors (one by one), make sure the alarm is visible on the screen.

  • Please provide pictures

  • Please specify

  • Please provide pictures

  • Are you energising a slave on an existing master unit commissioned previously?

  • No further actions

Testing slave

  • Apply setpoints for charge and discharge using the screen of the master. Make sure that the system responds to the orders.

  • Please provide pictures

  • Please specify

  • Please provide pictures and/or add comments

  • While the system is operating, press the emergency button, the system should stop

  • Please provide pictures and/or add comments

  • Please specify

  • Please provide pictures

  • Is the EMS under scope

  • Confirm that the EMS can see all parameters of the batteries

  • Confirm that EMS can charge/discharge battery and provide services as per client's request

  • Please proceed to next page

Completion

  • Before confirming the commissioning please make sure that the EMS (if supplied) communicates with the system and is able to send commands to the batteries.

  • Confirm that the commissioning has been carried out

  • Signature of person carrying out the commissioning

  • Signature of client representative confirming that the commissioning on the equipment has been carried out. If not client representative please write N/P

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.