Information
-
Site conducted
-
Conducted on
-
Prepared by
-
Location
-
Equipment checked
Cold commissioning
- Sungiga
-
SunGiga Number
-
Serial Number Cabinet
-
Serial Number Battery packs
-
Serial Number PCS
-
Serial Number Chiller
-
Serial Number Junction box
-
Choose an answer
-
Is the enclosure in good condition?
-
Please provide pictures
-
Please specify
-
Please provide pictures and/or add comments
-
Are the connections made by the client in good condition?
-
Please provide pictures
-
Please specify
-
Please provide pictures and/or add comments
-
Are the clearances for the Sungiga acceptable?<br>Rear >0.8m<br>Side >0.1m<br>Front at least 1.5m, needed 2.5m for service.
-
Please provide pictures
-
Please specify
-
Please provide pictures and/or add comments
-
Check all the connectors are in good condition. Pull cables and make sure all the connectors are inserted properly.
-
Please provide pictures
-
Please specify
-
Please provide pictures and/or add comments
-
Check the cooling system pipes, there is not any leakage.
-
Please provide pictures
-
Please specify
-
Please provide pictures and/or add comments
-
Torque values for reference
-
Check the torque for the bolted connections on the PCS and busbars. Prove dead before checking the client connections and PCS connections.
-
Please provide pictures
-
Please specify
-
Please provide pictures and/or add comments
-
Check fuses on the front and status of SPD (Surge Protector Device).
-
Please provide pictures
-
Please specify
-
Please provide pictures and/or add comments
-
Check and tight the screw connections in all the components.
-
Please provide pictures
-
Please specify
-
Please provide pictures and/or add comments
-
Open the rear and check that the thermostat is set to 20°C. Check that the fans spin freely and in the right position (air outlet)
-
Check grounding, check continuity between internal earth and between internal and external.
-
Please provide pictures
-
Please specify
-
Please provide pictures and/or add comments
-
Take the MSD (Maintenance Switch Disconnector) and connect it to the bottom battery pack.
-
Is everything fine for the system to be energised?
-
Please do not energise this Sungiga and check for corrective actions to allow energisation.
Hot Commissioning Sungiga
Energisation and devices configuration
-
Make sure that the client circuit breaker is closed and the 230V are arriving to the Sungiga.
-
Please provide pictures
-
Please specify
-
Please provide pictures and/or add comments
-
Close MCCB, DC switch and MCBs on the HVBox (in this order). Is the Screen switching ON?
-
Please provide pictures
-
Please specify
-
Please provide pictures and/or add comments
-
Please connect the internal network on ETH0 (LAN1 on SCU) and the client cable on ETH1 (LAN2 on SCU)
-
Set the IP for the SCU (inner and client networks) as required
-
Set the IP for the PCS and BMU, If there are slave units, please confirm the IPs for slave equipment is right from the SCU screen.
-
Connect to the PCS and change the parameters as required. If there are slave units this will have to be done for all the PCS.
-
Upgrade the software to all the equipment as required. Take a picture of the last software installed
-
Check that the chiller settings are correct
Protections checks
-
Check smoke and heat sensors (one by one), make sure the alarm is visible on the screen.
-
Please provide pictures
-
Please specify
-
Please provide pictures
Testing with SCU
-
Apply setpoints for charge and discharge using the screen. Make sure that the system responds to the orders.
-
Please provide pictures
-
Please specify
-
Please provide pictures and/or add comments
-
While the system is operating, press the emergency button, the system should stop
-
Please provide pictures and/or add comments
-
Please specify
-
Please provide pictures
-
Is the EMS under scope
-
Confirm that the EMS can see all parameters of the batteries
-
Confirm that EMS can charge/discharge battery and provide services as per client's request
-
Please proceed to next page
-
Is the enclosure in good condition?
-
Please provide pictures
-
Please specify
-
Please provide pictures and/or add comments
-
Are the connections made by the client in good condition?
-
Please provide pictures
-
Please specify
-
Please provide pictures and/or add comments
-
Are the clearances for the Sungiga acceptable?<br>Rear >0.8m<br>Side >0.1m<br>Front at least 1.5m, needed 2.5m for service.
-
Please provide pictures
-
Please specify
-
Please provide pictures and/or add comments
-
Check all the connectors are in good condition. Pull cables and make sure all the connectors are inserted properly.
-
Please provide pictures
-
Please specify
-
Please provide pictures and/or add comments
-
Check the cooling system pipes, there is not any leakage.
-
Please provide pictures
-
Please specify
-
Please provide pictures and/or add comments
-
Torque values for reference
-
Check the torque for the bolted connections on the PCS and busbars. Prove dead before checking the client connections and PCS connections.
-
Please provide pictures
-
Please specify
-
Please provide pictures and/or add comments
-
Check fuses on the front and status of SPD.
-
Please provide pictures
-
Please specify
-
Please provide pictures and/or add comments
-
Check and tight the screw connections in all the components.
-
Please provide pictures
-
Please specify
-
Please provide pictures and/or add comments
-
Open the rear and check that the thermostat is set to 20°C. Check that the fans spin freely and in the right position (air outlet)
-
Check grounding, check continuity between internal earth and between internal and external.
-
Please provide pictures
-
Please specify
-
Please provide pictures and/or add comments
-
Take the MSD and connect it to the bottom battery pack.
-
Is everything fine for the system to be energised?
-
Please do not energise this Sungiga and check for corrective actions to allow energisation.
Hot Commissioning Sungiga
Energisation and devices configuration
-
Make sure that the client circuit breaker is closed and the 230V are arriving to the Sungiga.
-
Please provide pictures
-
Please specify
-
Please provide pictures and/or add comments
-
Close MCCB, DC switch and MCBs on the Junction box (in this order)
-
Please provide pictures
-
Please specify
-
Please provide pictures and/or add comments
-
Set the IP for the PCS and BMU as required as per slave number
-
Connect to the PCS and change the parameters as required.
-
Software upgrade on BCU can be done from SCU unit
-
Upgrade the Software of the BCU
Protections checks
-
Check smoke and heat sensors (one by one), make sure the alarm is visible on the screen.
-
Please provide pictures
-
Please specify
-
Please provide pictures
-
Are you energising a slave on an existing master unit commissioned previously?
-
No further actions
Testing slave
-
Apply setpoints for charge and discharge using the screen of the master. Make sure that the system responds to the orders.
-
Please provide pictures
-
Please specify
-
Please provide pictures and/or add comments
-
While the system is operating, press the emergency button, the system should stop
-
Please provide pictures and/or add comments
-
Please specify
-
Please provide pictures
-
Is the EMS under scope
-
Confirm that the EMS can see all parameters of the batteries
-
Confirm that EMS can charge/discharge battery and provide services as per client's request
-
Please proceed to next page
Completion
-
Before confirming the commissioning please make sure that the EMS (if supplied) communicates with the system and is able to send commands to the batteries.
-
Confirm that the commissioning has been carried out
-
Signature of person carrying out the commissioning
-
Signature of client representative confirming that the commissioning on the equipment has been carried out. If not client representative please write N/P