Title Page
-
Clients Name
-
Project Name
- Wabash Valley Power
- First Person
- Toyota Tsusho
- PLC 4&5
- Lakefront at Keystone
- 65 Commerce
- Allegion TI
- Park 350
- College Crossing
- Other
- Whiteland Exchange Building 1&2
- Lakefront at Keystone Roadwork
- Lakefront at Keystone Amenities
- Yamaha Marine Precision Propeller's
- Metro Air 8 & 9
- PLC 4 Lot 2
- Mount Comfort Logistics Center
- Plainfield Logistics Park Building1
-
Conducted on
-
Conducted audit with? (Contractor and Employees name.)
-
Prepared by
-
Location
General Safety
-
Are personnel active on the project?
-
All personnel are wearing hard hats
-
All personnel are wearing safety glasses
-
All personnel are wearing high visibility clothing
-
All personnel onsite have successfully completed orientation
-
All personnel are conducting daily planning activities (Task Hazard Analysis)
-
Workarea is clean and materials organized
-
Lighting in all work areas is adequate
-
Fire extinguishers are available, inspected, and in good working order
-
Emergency Action Plan and escape routes are complete and readily available
-
Ventilation in work area is effective
Mobile Equipment
-
Is mobile equipment (i.e. earth moving equipment, lulls, fork trucks) being utilized on the project?
-
Mobile equipment has been inspected
-
Operator is functioning in a competent manner
-
Spotter are being utilized to assist in backing up and protecting operator's blind spots
-
Backup alarm and horn are operational
-
Operator is wearing safety belt
-
Pedestrians are aware and are staying clear of mobile equipment operation
Cranes, Rigging, Hoisting, Suspended Loads
-
Are cranes being utilized?
-
Operator has training certification on person and available
-
Operator appears to be competent in running crane
-
Crane has annual and daily inspection
-
Barriers around crane are established to protect for swing radius
-
Outriggers and cribbing is effectively utilized
-
If necessary, a critical lift plan is completed and approved
-
Are suspended loads present?
-
Personnel rigging and signaling are trained
-
Rigging equipment has been inspected and is in good working condition
-
Loads are balanced and rigged correctly
-
Suspended loads are away from personnel
-
Tag lines are used on all suspended loads
Ladders
-
Are ladders being used?
-
Ladders are free of damage and defects
-
Ladders are set up and secured
-
Personnel using ladder is maintaining three points of contact
-
Ladders are made of fiberglass
Lifts
-
Are scissors lifts being used?
-
Scissors lift has been inspected
-
Scissors lift is being operated on a level surface
-
Personnel have feet on deck of scissors lift
-
Chain on scissors lift is attached
-
Are aerial lifts being used?
-
Aerial lift has been inspected
-
Ground is suitable for safe operation
-
Personnel in basket are utilizing fall protection (i.e. harness and lanyard) and are tied off to the basket
-
Personnel in basket are only working off of basket platform (i.e. not standing on rails)
-
Operator of aerial lift is doing so in a safe manner
-
Personnel are clear below working area of elevated aerial lift
Public Protection
-
Does the work potentially interact with public and/or staff?
-
The perimeter of the work area identified and protected
-
Signage is present identifying work areas as "Construction Zone"
Fall Protection
-
Are personnel working with their feet at/or above 6 feet?
-
Are guardrails present
-
Top rail, mid-rail, and toe board present in all areas
-
Toprail, mid-rail, and toe board sturdy (200 pounds of force) and in good condition
-
Is a harness, lanyard, and anchor point being used?
-
Anchor point is secure and can withstand 5,000 pounds
-
Lanyard is securely affixed to anchor point and harness
-
Lanyard is in good condition and the correct type of lanyard is utilized for working environment
-
Harness fits well and is in good condition
-
Are covers being utilized to protect floor penetrations greater than 2 inches in diameter?
-
Covers are secured and labeled as "HOLE
-
Material used for floor penetration protection has sufficient load capacity for activity in work area
Electrical
-
Is electrical power for tools, equipment, lighting, etc. being used?
-
Electrical panels and/or cabinets are identified and secured
-
Electrical cords, pugs, and/or outlets are in good working condition
-
Ground Fault Circuit Interrupter (GFCI) are used with all electrical tools and equipment
-
Electrical cords are out of walkways
Fire Protection
-
Are flammable and/or combustable materials being stored on the project?
-
All flammable and combustable materials are stored in a safe location
-
Location of stored flammable and combustable materials are identified with signage and secure
-
Compressed gas cylinders are secured, upright, and are capped
-
Are grinding, cutting, welding or any other spark producing activities being conducted?
-
If required, are Hot Work Permits completed, reviewed, and approved?
-
A fire extinguisher available for the activity being conducted
-
All flames, sparks and/or slag is contained from spreading (i.e. floor penetrations, stairways, etc.)
-
Gauges, hoses, cables, and welding leads in good working condition
-
Flash arrest protection is present with torches
-
When welding, flash protection is used
Trench and Excavation
-
Daily inspection has been completed
-
Access/egress is with 25’ of travel
-
Are there trenches or excavations on site
-
Contractors name
-
Are 811 locates completed
-
Has an excavation permit been filled out and reviewed
-
Sloping, benching or shoring is in accordance with trench forms
-
Has all private utilities been identified
Scaffolding
-
Is there scaffolding erected on site
-
Guardrails or fall protection is in place for deck over 10'
-
Access to platform is sufficiently provided
-
Bracing is installed and sufficient
-
Mudsills, plates, or wheels are in place
-
Scaffold has tie in or outriggers at 20'
-
Scaffold is not overloaded
-
Daily inspections by competent person has been completed